Acknowledgement
본 연구는 산업통상자원부의 재원으로 사용후 핵연료 관리 핵심기술 개발사업단 및 산업부 한국에너지기술평가원의 지원을 받아 수행된 연구 사업의 일환으로 수행되었습니다(No. 2021040101003C). 이에 감사드립니다.
References
- Andersson, C.J., 2007, Rock Mass Response to Coupled Mechanical Thermal Loading Aspo Pillar Stability Experiment, Sweden. Doctoral Thesis. Division of Soil and Rock Mechanics, Royal Institute of Technology, Stockholm, Sweden. ISSN 1650-9501.
- Grimstad, E. and Barton, N., 1993, Updating the Q-system for NMT, In Proceedings of the International Symposium on Sprayed Concrete-Modern use of wet mix sprayed concrete for underground support, Fagemes, Oslo, Norwegian Concrete Association.
- Hagros, A., 2006, Host Rock Classification (HRC) system for nuclear waste disposal in crystalline bedrock.PhD thesis, Department of Geology, University of Helsinki.
- Holmberg, M. and Stille, H., 2007, Observationsmetodens grunder och dess tillampning pa design av konstruktioner i berg, Stiftelsen Svensk Bergteknisk Forskning/Swedish Rock Engineering Research.
- Peck, R.B., 1969, Advantages and limitations of the observational method in applied soil mechanics, Geotechnique, 19(2), 171-187. https://doi.org/10.1680/geot.1969.19.2.171
- POSIVA, 2013, Site Engineering Report, POSIVA 2012-23.
- POSIVA, SKB, 2017, Safety functions, performance targets and technical design requirements for a KBS-3V repository, Conclusions and recommendations from a joint SKB and Posiva working group, Posiva SKB Report, 1.
- SKB, 2001, Rock stability considerations for siting and constructing a KBS-3 repository: Based on experiences from Aspo HRL, AECL's URL, tunnelling and mining. TR-01-38.
- SKB, 2005, Preliminary assessment of potential underground stability (wedge and spalling) at Forsmark, Simpevarp and Laxemar sites. R-05-71.
- SKB, 2006, Using observations in deposition tunnels to avoid intersections with critical fractures in deposition holes, R-06-54.
- SKB, 2007a, Construction experiences from underground works at Forsmark, R-07-10.
- SKB, 2007b, Final repository facility Underground design premises/D2, R-07-33.
- SKB, 2008, Injekteringen av TASS-tunneln. Delresultat t o m september 2008, R-08-123.
- SKB, 2009a, Underground Design Forsmark, Layout D2, R-08-116.
- SKB, 2009b, Underground Design Forsmark, Layout D2: Rock Mechanics and Rock Support, R-08-115.
- SKB, 2009c, Site engineering report Forsmark Guidelines for underground design Step D2, R-08-83.
- SKB, 2009d, Strategy for thermal dimensioning of the final repository for spent nuclear fuel, R-09-04.
- SKB, 2010a, Design, construction and initial state of the underground openings, TR-10-18.
- SKB, 2010b, Full perimeter intersection criteria. Definitions and implementations in SR-Site, TR-10-21.