DOI QR코드

DOI QR Code

Crafting an Automated Algorithm for Estimating the Quantity of Beam Rebar

  • 투고 : 2021.06.04
  • 심사 : 2021.06.22
  • 발행 : 2023.08.20

초록

Precise construction cost estimation is paramount to determining the total construction expense of a project prior to the initiation of the construction phase. Despite this, manual quantification and cost estimation methods, which continue to be widely used, may result in imprecise estimation and subsequent financial loss. Given the fast-paced and efficiency-demanding nature of the construction industry, trustworthy quantity and cost estimation is essential. To mitigate these obstacles, this research is focused on establishing an automated quantity estimation algorithm, particularly designed for the main rebar of beams which are recognized for their complicated reinforcement configurations. The exact quantity derived from the proposed algorithm is compared to the manually approximated quantity, reflecting a variance of 10.27%. As a result, significant errors and impending financial loss can be averted. The implementation of the findings from this research holds the potential to significantly assist construction firms in quickly and accurately estimating rebar quantities while adhering strictly to applicable specifications and regulatory requirements.

키워드

과제정보

This work was supported by the National Research Foundation of Korea(NRF) grants funded by the Korean government(MOE)(No. 2022R1A2C2005276).

참고문헌

  1. Tang S, Liu H, Almatared M, Abudayyeh O, Lei Z, Fong A. Towards automated construction quantity take-off: An integrated approach to information extraction from work descriptions. Buildings. 2022 Mar 15;12(3):354. https://doi.org/10.3390/buildings12030354 
  2. Han PA, Francis Siu MF, AbouRizk S, Hu D, Hermann U. 3D model-based quantity take-off for construction estimates. Computing in Civil Engineering 2017 Jun 13. Seattle, WA. Reston (VI): American Society of Civil Engineers; 2017. p. 118-24. http://ascelibrary.org/doi/10.1061/9780784480823.015 
  3. Kim D, Lim C, Liu Y, Kim S. Automatic estimation system of building frames with integrated structural design information (AutoES). Iranian Journal of Science and Technology, Transactions of Civil Engineering. 2020 Dec;44(4):1145-57. https://doi.org/10.1007/s40996-019-00308-5 
  4. Khosakitchalert C, Yabuki N, Fukuda T. Improving the accuracy of BIM-based quantity takeoff for compound elements. Automation in Construction. 2019 Oct;106:102891. https://doi.org/10.1016/j.autcon.2019.102891 
  5. Khosakitchalert C, Yabuki N, Fukuda T. Automated modification of compound elements for accurate BIM-based quantity takeoff. Automation in Construction. 2020 May;113:103142. https://doi.org/10.1016/j.autcon.2020.103142 
  6. Ergen F, Bettemir OH. Development of BIM software with quantity take-off and visualization capabilities. Journal of Construction Engineering Management & Innovation. 2022;5(1):1-14. https://doi.org/10.31462/jcemi.2022.01001014 
  7. Chen YH, Yang TK. Lapping pattern, stock length, and shop drawing of beam reinforcements of an RC building. Journal of Computing in Civil Engineering. 2013 May;29(1):04014028. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000303 
  8. Halpin DW. Construction management. 4th edition. Hoboken (NJ): John Wiley & Sons; 2011. 445 p. 
  9. Northen A, Benge D. NRM 2: Detailed measurement for building works. 2nd edition. London (UK): Royal Institution of Chartered Surveyors (RICS); 2021. 348 p. 
  10. Civil Engineers I. CESMM4: civil engineering standard method of measurement. 4th ed. London (UK): Thomas Telford Ice; 2012. 111 p. 
  11. Monteiro A, Pocas Martins J. A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction. 2013 Nov; 35:238-53. https://doi.org/10.1016/j.autcon.2013.05.005 
  12. Lim C, Hong WK, Lee D, Kim S. Automatic rebar estimation algorithms for integrated project delivery. Journal of Asian Architecture and Building Engineering. 2016 Sep;15(3):411-8. https://doi.org/10.3130/jaabe.15.411 
  13. Mangal M, Cheng JCP. Automated optimization of steel reinforcement in RC building frames using building information modeling and hybrid genetic algorithm. Automation in Construction. 2018 Jun;90:39-57. https://doi.org/10.1016/j.autcon.2018.01.013 
  14. BS 8666:2020. Scheduling, dimensioning, cutting and bending of steel reinforcement for concrete - Specification. London (UK): British Standard Institution; 2020. 32 p. 
  15. ACI 318-14. Building Code Requirements for Structural Concrete and Commentary (Metric). Farmington Hills (MI): American Concrete Institute; 2014. 519 p.