DOI QR코드

DOI QR Code

Comparison of the DeSa Project and the Preliminary Decommissioning Plan for Shin-Kori Units 5 and 6 in Terms of Graded Approaches

  • Changju Song (Department of Nuclear Engineering, Chosun University) ;
  • Tae Young Kong (Department of Nuclear Engineering, Chosun University) ;
  • Seongjun Kim (Department of Nuclear Engineering, Chosun University) ;
  • Jinho Son (Department of Nuclear Engineering, Chosun University) ;
  • Woo Seok Choi (Department of Nuclear Engineering, Chosun University) ;
  • hwapyoung Kim (Department of Nuclear Engineering, Chosun University) ;
  • Jiung Kim (Department of Nuclear Engineering, Chosun University) ;
  • Hee Geun Kim (Division of Energy & Electrical Engineering, Uiduk University)
  • Received : 2023.04.11
  • Accepted : 2023.04.24
  • Published : 2023.06.30

Abstract

A graded approach applies safety requirements differentially, depending on the risk potential. An advantage of applying a graded approach is that safety assessments can be conducted repeatedly by focusing on areas with relatively higher risk than on those with low risk when decommissioning a nuclear power plant (NPP). The International Atomic Energy Agency (IAEA) recommends applying a graded approach to decommissioning NPPs worldwide. In Korea, the definition of the graded approach requires to be clarified. This study compared the decommissioning method used in Korean NPPs with the IAEA graded approach and examined whether the graded approach can be applied to decommissioning NPPs in Korea. As a result of the comparison, the preliminary decommissioning plan for Shin-Kori Units 5 and 6 showed that the decommissioning method for Korean NPPs is similar to the five-step IAEA graded approach.

Keywords

Acknowledgement

This study was supported by a research fund from Chosun University(2022).

References

  1. Korea Hydro & Nuclear Power. Nuclear Power Plant Status. KHNP; Gyeongju, Korea: updated Dec 2022 [cited Dec 2022]. Available from: https://npp.khnp.co.kr/index.khnp?menuCd=DOM_000000102002001001. 
  2. Lee EJ, Kong TY, Kim SJ, Choi WS, Son JH, Song CJ, Kim HP, Kim SY, Cho M and Kim HG. 2022. Comparative analysis of occupational radiation doses when decommissioning nuclear power plants. Energy Sci. Eng. 10(12):4358-4365. https://doi.org/10.1002/ese3.1311. 
  3. Son JH, Kong TY, Yang HY, Kim SJ, Lee EJ, Choi WS, Chung WK and Kim HG. 2021. Estimation of radiation dose resulting from the recycling of large metal wastes from decommissioning nuclear power plants in Korea. Energy Sci. Eng. 9(12): 2206-2214. https://doi.org/10.1002/ese3.995. 
  4. International Atomic Energy Agency. 2013. Safety Assessment for Decommissioning, Annex II Graded Approach to Safety Assessments for Decommissioning of Facilities Using Radioactive Material, Safety Reports Series No.77, IAEA. 2013. 
  5. International Atomic Energy Agency. 2008. Safety Assessment for Decommissioning Facilities Using Radioactive Material, Safety Standards Series No. WS-G-5.2, IAEA. 2008. 
  6. Kim HP, Kong TY, Kim SJ, Son JH, Choi WS, Song CJ and Kim HG. 2022. Analysis of Korean Safety Evaluation Criteria for Dismantling Nuclear Power Plants Using the IAEA Guidance for Safety Assessment. J. Radiat. Ind. 16(3):191-199. https://doi.org/10.23042/radin.2022.16.3.191. 
  7. Korea Hydro & Nuclear Power. 2022. Annual Report of Occupational Exposure in Nuclear Power Plants in 2021. KHNP; Gyeongju, Korea: 2022-50207525-Jeong-0227. 
  8. Nuclear Safety and Security Commission. (Other reporting) Overview of the preliminary decommissioning plan and main characteristics of the decommissioning of nuclear power plants in Korea, NSSC; Seoul, Korea: updated August 2021 [cited December 2022]. Available from: https://www.nssc.go.kr/ko/cms/FR_BBS_CON/BoardView.do?SITE_NO=2&BOARD_SEQ=14&BBS_SEQ =45958&MENU_ID=170&CONTENTS_NO=1. 
  9. International Atomic Energy Agency. Safety Assessment for Decommissioning, Annex I, Part A, Safety Assessment for Decommissioning of a Nuclear Power Plant, Safety Reports Series No.77, IAEA. 2013. 
  10. Republic of Korea. Enforcement Decree of Nuclear Safety Act. Presidential Decree No. 31431. 2021. 
  11. Korea Hydro & Nuclear Power. Shin-Kori Nuclear Power Units 5 and 6 Preliminary Decommissioning Plan, Revision 3, KHNP, Gyeongju, Korea, 2017. Available from: https://nsic.nssc.go.kr/nuclear/constructionNpp.do?nppKey=CMN024020105#page. 
  12. Korea Hydro & Nuclear Power. Shin-Kori Units 5 and 6 Preliminary Safety Analysis Report, Chapter 12, KHNP, Gyeongju, Korea, 2016. Available from: https://nsic.nssc.go.kr/nuclear/constructionNpp.do?nppKey=CMN024020105#page.