DOI QR코드

DOI QR Code

Field investigation and numerical study of ground movement due to pipe pile wall installation in reclaimed land

  • Hu Lu (School of construction engineering, Shenzhen Polytechnic University) ;
  • Rui-Wang Yu (Shanghai Tunnel (Hong Kong) Company Limited) ;
  • Chao Shi (School of Civil and Environmental Engineering, Nanyang Technological University) ;
  • Wei-Wei Pei (Wenzhou Design Assembly Company Ltd.)
  • 투고 : 2023.04.17
  • 심사 : 2023.07.06
  • 발행 : 2023.08.25

초록

Pipe pile walls are commonly used as retaining structures for excavation projects, particularly in densely populated coastal cities such as Hong Kong. Pipe pile walls are preferred in reclaimed land due to their cost-effectiveness and convenience for installation. However, the pre-bored piling techniques used to install pipe piles can cause significant ground disturbance, posing risks to nearby sensitive structures. This study reports a well-documented case history in a reclamation site, and it was found that pipe piling could induce ground settlement of up to 100 mm. Statutory design submissions in Hong Kong typically specify a ground settlement alarm level of 10 mm, which is significantly lower than the actual settlement observed in this study. In addition, lateral soil movement of approximately 70 mm was detected in the marine deposit. The lateral soil displacement in the marine deposit was found to be up to 3.4 and 3.1 times that of sand fill and CDG, respectively, mainly due to the relatively low stiffness of the marine deposit. Based on the monitoring data and site-investigation data, a 3D numerical analysis was established to back-analyze soil movements due to the installation of the pipe pile wall. The comparison between measured and computed results indicates that the equivalent ground loss ratio is 20%, 40%, and 20% for the fill, marine deposit and CDG, respectively. The maximum ground settlement increases with an increase in the ground loss ratio of the marine deposit, whereas the associated influence radius remains stationary at 1.2 times the pipe pile wall depth (H). The maximum ground settlement increases rapidly when the thickness of marine deposit is less than 0.32H, particularly for the ground loss ratio of larger than 40%. This study provides new insights into the pipe piling construction in reclamation sites.

키워드

과제정보

The work described in this paper was supported by a grant from Shenzhen Science and Technology program (KCXFZ20211020163). The research was also supported by the Ministry of Education, Singapore, under its Academic Research Fund (AcRF) Tier 1 Seed Funding Grant (Project no. RS03/23) and the Start-Up Grant from Nanyang Technological University. The financial support is gratefully acknowledged.

참고문헌

  1. Al-Soudani, W.H. and Albusoda, B.S. (2021), "An experimental study on bearing capacity of steel open ended pipe pile with exterior wings under compression load", Geotech. Geol. Eng., 39, 1299-1318. https://doi.org/10.1007/s10706-020-01559-0.
  2. Bradshaw, A.S. and Baxter, C.D.P. (2006), Design and construction of driven pile foundations-lessons learned on the Central Artery/Tunnel Project, Virginia, USA: Federal Highway Administration, U.S. Department of Transportation; 2006, 51.
  3. Brinkgreve, R.B.J., Kumarswamy, S., Swolfs, W.M., Waterman, D., Chesaru, A. and Bonnier, P.G. (2016), PLAXIS 2016. PLAXIS bv, the Netherlands.
  4. Chen, J.J., Lei, H. and Wang, J.H. (2014), "Numerical analysis of the installation effect of diaphragm walls in saturated soft clay", Acta Geotechnica, 9(6), 981-991. https://doi.org/10.1007/s11440-013-0284-x.
  5. Comodromos, E.M., Papadopoulou, M.C. and Konstantinidis, G.K. (2013). "Effects from diaphragm wall installation to surrounding soil and adjacent buildings", Comput. Geotech., 53, 106-121. https://doi.org/10.1016/j.compgeo.2013.05.003.
  6. Cui, C.Y., Meng, K., Wu, Y.J., Chapman, D. and Liang, Z.M. (2018), "Dynamic response of pipe pile embedded in layered visco-elastic media with radial inhomogeneity under vertical excitation", Geomech. Eng., 16(6), 609-618. https://doi.org/10.12989/gae.2018.16.6.609.
  7. Gavin, K.G. and Lehane, B.M. (2003), "The shaft capacity of pipe piles in sand", Can. Geotech. J., 40(1), 36-45. https://doi.org/10.1139/t02-093.
  8. Gunn, M.J. and Clayton, C.R.I. (1992), "Installation effects and their importance in the design of earth-retaining structures", Geotechnique, 42(1), 137-141. https://doi.org/10.1680/geot.1992.42.1.137.
  9. Ko, J., Jeong, S. and Seo, H. (2022), "Effect of soil condition on the coefficient of lateral earth pressure inside an open-ended pipe pile", Geomech. Eng., 31(2), 209-222. https://doi.org/10.12989/gae.2022.31.2.209.
  10. Leung, E.H.Y. and Ng, C.W.W. (2007), "Wall and ground movements associated with deep excavations supported by cast in situ wall in mixed ground conditions", J. Geotech. Geoenviron. Eng., 133(2), 129-143. https://doi.org/10.1061/(ASCE)1090-0241(2007)133:2(129).
  11. Lu, H., Shi, J.W., Ng, C.W.W. and Lv, Y.R. (2020), "Three-dimensional centrifuge modeling of the influence of side-by-side twin tunneling on a piled raft", Tunn. Undergr. Sp. Tech., 103, 103486. https://doi.org/10.1016/j.tust.2020.103486.
  12. Lu, H., Shi, J.W., Wang, Y. and Wang, R. (2019), "Centrifuge modeling of tunneling-induced ground surface settlement in sand", Undergr. Space, 4, 302-309. https://doi.org/10.1016/j.undsp.2019.03.007.
  13. Malik, A.A., Kuwano, J., Tachibana, S. and Maejima, T. (2017), "End bearing capacity comparison of screw pile with straight pipe pile under similar ground conditions", Acta Geotechnica, 12, 415-428. https://doi.org/10.1007/s11440-016-0482-4.
  14. Morton, K., Cater, R.W. and Linney, L. (1980). "Observed settlements of buildings adjacent to stations constructed for the modified initial system of the Mass Transit Railway, Hong Kong", Proceedings of the 6th Southeast Asian Conference of Soil Engineering, 415-429.
  15. Ng, C.W.W. and Yan, R.W.M. (1999), "Three-dimensional modelling of a diaphragm wall construction sequence", Geotechnique, 49(6), 825-834. https://doi.org/10.1680/geot.1999.49.6.825.
  16. Ng, C.W.W, Shi, J. and Hong, Y. (2013), "Three-dimensional centrifuge modelling of basement excavation effects on an existing tunnel in dry sand", Can. Geotech. J., 50(8), 874-888. https://doi.org/10.1139/cgj-2012-0423.
  17. Brinkgreve, R.B.J., Kumarswamy, S., Swolfs, W.M., Waterman, D., Chesaru, A. and Bonnier, P.G. (2016), PLAXIS 2016, PLAXIS bv, the Netherlands.
  18. Wang, J.H., Xu, Z.H. and Wang, W.D. (2010), "Wall and ground movements due to deep excavations in Shanghai soft soils", J. Geotech. Geoenviron. Eng., 136(7), 985-994. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000299.
  19. Wang, Y., Shi, J. and Ng, C.W. (2011). "Numerical modeling of tunneling effect on buried pipelines", Can. Geotech. J., 48(7), 1125-1137. https://doi.org/10.1139/t11-024.
  20. Shen, S.L., Miura, N. and Koga, H. (2003). "Interaction mechanism between deep mixing column and surrounding clay during installation", Can. Geotech. J., 40(2), 293-307. https://doi.org/10.1139/t02-109.
  21. Shi, J., Ng, C.W.W. and Chen, Y. (2015), "Three-dimensional numerical parametric study of the influence of basement excavation on existing tunnel", Comput. Geotech., 63, 146-158. https://doi.org/10.1016/j.compgeo.2014.09.002.
  22. Shi, J., Wei, J., Ng, C.W., Lu, H., Ma, S., Shi, C. and Li, P. (2022a), "Effects of construction sequence of double basement excavations on an existing floating pile", Tunn. Undergr. Sp. Tech., 119, 104230. https://doi.org/10.1016/j.tust.2021.104230.
  23. Shi, J.W., Chen Y.H., Lu, H., Ma, S.K. and Ng, C.W.W. (2022b), "Centrifuge modeling of the influence of joint stiffness on pipeline response to underneath tunnel excavation", Can. Geotech. J., 59(9), 1568-1586. https://doi.org/10.1139/cgj-2020-0360.
  24. Shi, J.W., Wang, J.P., Chen Y.H., Shi, C., Lu, H., Ma, S.K. and Fan, Y.B. (2023), "Physical modeling of the influence of tunnel active face instability on existing pipelines", Tunn. Undergr. Sp. Tech., 140, 105281. https://doi.org/10.1016/j.tust.2023.105281.
  25. Shi, C. and Wang, Y. (2022a), "Assessment of reclamation-induced consolidation settlement considering stratigraphic uncertainty and spatial variability of soil properties", Can. Geotech. J., 59(7), 1215-1230. https://doi.org/10.1139/cgj2021-0349.
  26. Shi, C. and Wang, Y. (2022b), "Machine learning of three-dimensional subsurface geological model for a reclamation site in Hong Kong", Bull. Eng. Geol. Environ., 81(12), 1-18. https://doi.org/10.1007/s10064-022-03009-y.
  27. Shi, C. and Wang, Y. (2023a), "Data-driven spatio-temporal analysis of consolidation for rapid reclamation", Geotechnique, 1-64. https://doi.org/10.1680/jgeot.22.00016.
  28. Shi, C. and Wang, Y. (2023b), "Data-driven sequential development of geological cross-sections along tunnel trajectory", Acta Geotechnica, 18(4), 1739-1754. https://doi.org/10.1007/s11440-022-01707-1.
  29. Xu, X.T., Liu, H.L. and Lehane, B.M. (2006). "Pipe pile installation effects in soft clay", Geotech. Eng., 159(4), 285-296. https://doi.org/10.1680/geng.2006.159.4.285.
  30. Zheng, X., Shi, B., Zhu, H.H., Zhang, C.C., Wang, X. and Sun, M.Y. (2021), "Performance monitoring of offshore PHC pipe pile using BOFDA-based distributed fiber optic sensing system", Geomech. Eng., 24(4), 337-348. https://doi.org/10.12989/gae.2021.24.4.337.