Acknowledgement
이 연구는 서울과학기술대학교 교내 연구비 지원으로 수행 되었습니다.
References
- Aboelmagd, Y. M., & Mobarak, W. F. (2021). Types of works in construction projects in terms of effectiveness when applying Value Engineering in Saudi Arabia, Journal of Engineering Sciences, 6(49), 704-733. https://doi.org/10.21608/jesaun.2021.80878.1058
- Byong, B. S. (2011). Building construction cost savings through the improvement of various design VE work-focused on Busan cases, Korea Institute of Construction Engineering and Management, 2(2), 68-70.
- Cho, H. M., Hyun, C. T., Hong, T. H., Sim, J. G., & Moon, H. S. (2010). Development of VE suggestion form for post - management of multi - family housing VE proposals, Architectural Institute of Korea, 26(6), 111-119.
- Enforcement Decree of the Construction Technology Promotion Act, Ministry of Government Legislation 75 (2022). https://www.law.go.kr/
- Firmanda, Y. A., Oetomo, W., & Wulandari, E. (2022). Value engineering for drainage system planning on Soekarno Hatta road malang city, Journal of Community Service, 14(3), 2707-2725. https://doi.org/10.36418/dev.v3i14.331
- Ha, S. R., Hyun, C. T., SON, M, J., & Kim, Y. S. (2011). Development of pre - workshop phase for the VE application at the early planning stage of the mega project, Korea Institute of Construction Engineering and Management, 12(4), 29-39. https://doi.org/10.6106/KJCEM.2011.12.4.29
- Ha, Y. K. (2013). The study regarding recent design VE bidding system and improvement for bidding Process in Korea, Master's Thesis, Korea University, 2013(2), 72-90.
- Heo, W. Y., & Yoon, J. O. (2013). The design through mechanical engineering / Fire protection VE case study, Architectural Institute of Korea, 29(2), 219-226.
- Hyun, J. H., Byong, B. S., Choi, E. G., Ha, C. D., & Moon, S. W. (2012). A case study on valu improvement through applying VE method in urban railway design, Journal of the Korean Society for Railway, 2012(5), 7-12.
- Ikhbayar, K. L., Jin, C. Q., Hyun, C. T., & Lee, S. H. (2022). A review method of the applicability for VE alternatives using building information modeling based virtual reality, Korean Journal of Computational Design and Engineering, 27(2), 189-203. https://doi.org/10.7315/CDE.2022.189
- In, H. J. (2012). A study on Kano-Quality model for user and owner's need analysis of design Value Engineering, Master's Thesis, Namseoul University, 45-48.
- Jeong, S. E. (2012). A process model for design Value Engineering(VE) using the chimera idea creation concept (CICC), Master's Thesis, Namseoul University, 2012(6), 65-869.
- Jeong, S. J. (2013). A study on the inventive thinking from the idea creation process of design VE by futures wheel (FWID), Master's Thesis, Namseoul University, 2012(12), 40-59.
- Jung, G. S. (2021a). A study on the VE process for optimizing the selection of slope stability construction method based on quality model, Master's Thesis, Pusan National University, 44-49.
- Jung, H. C., Kim, J. H., Han, S. W., & Hyun, C. T. (2013). A function analysis for application of VE in the planning phase of a construction project, Architectural Institute of Korea, 33(1), 581-582.
- Jung, J. W. (2021b). Comparing idea creation in VE systems, Korean Institute of Information Scientists And Engineers, 2018(6), 33-35.
- Kang, M. S., Yang, J. K., Huh, Y. K., & Kim, D. Y. (2019). Extraction and analysis for weight based core alternative evaluation factors of design VE quality model in the educational facility, Journal of the Architectural Institute of Korea, 37(12), 203-209.
- Kim, H. B. (2018). Development of brainstorming & business creativity codes method for VE idea generation, Master's Thesis, University of Seoul, 2018(8), 51-74.
- Kim, H. Q. (2017). Using business creativity codes (BCC) as an efficiency improvement method in the design phage VE of construction project, Doctoral Thesis, Sungkyunkwan University, 2016(10), 103-118.
- Kim, J. S., & Lim, H. C. (2015). Improvement method on ordering system of design phase VE, Architectural Institute of Korea, 17(3), 153-160.
- Kim, K. U., Oh, J. H., Lim, J. H., & Huh, Y. K. (2014). VE application to small and medium size private project, Architectural Institute of Korea, 30(6), 99-104. https://doi.org/10.5659/JAIK_SC.2014.30.6.99
- Kim, M. J., Kwon, S. H., & Lee, K. H. (2012). The development of an eco-value efficiency evaluation model according to the railway alignment change based on VE, Journal of the Korean Society for Railway, 2012(10), 1437-1442.
- Kim, S. T. (2014). Idea generation in Value Engineering using TRIZ contradiction, Master's Thesis, Pusan National University, 2014(8), 31-40.
- Kim, S. Y., & Yang, J. K. (2012). Process development and verification for construction VE object selection of performance-oriented, Korea Institute of Construction Engineering and Management, 13(4), 25-32. https://doi.org/10.6106/KJCEM.2012.13.4.025
- Kim, Y. H., & Kim, Y. S. (2010a). Problem analysis and improvement scheme based on questionnaire survey to design VE status for apartment buildings, Korea Institute of Construction Engineering and Management, 11(4), 51-58. https://doi.org/10.6106/KJCEM.2010.11.4.51
- Kim, Y. H., Han, J. G., & Chin, K. H. (2018). Direction of construction of VE system in bidding stage (centering on modular plant construction), Korean Society of Civil Engineers, 2018(10), 31-32.
- Kim, Y. S., & Kang, C. H. (2015). A study on the improvement direction for VE application to construction work, Architectural Institute of Korea, 35(2), 531-532.
- Kim, Y. S., & Kim, Y. H. (2010b). The efficiency scheme of design VE through the case studies of construction VE for apartments, Korea Institute of Construction Engineering and Management, 11(4), 59-67. https://doi.org/10.6106/KJCEM.2010.11.4.59
- Korea Value Engineering Institute. (2016). Construction VE expert basic course. Seoul, Korea Value Engineering Institute, 49-87.
- Kwon, M. D., Park, S. Y., & Jo, C. W. (2021). A utilization plan for automatic validation of BIM-based design VE, Korean Journal of Computational Design and Engineering, 26(3), 262-271. https://doi.org/10.7315/CDE.2021.262
- Lee, H. C., Hyun, C. T., Son, M. J., & Ji, S. M. (2011). Development of a Value evaluation model for design VE proposals using scenario planning, Architectural Institute of Korea, 27(4), 113-120.
- Lee, J. S., & Chun, J. Y. (2010). A method for selection of optimum alternative and decision making support process in construction VE, Architectural Institute of Korea, 26(3), 118-119.
- Lee, Y. J. (2013). A case study on the application of Value Engineering method to the educational facilities (Focused on osong high school project), Master's Thesis, Cheongju University, 2-21.
- Lim, J. K., Kim, S. H., & Lee, M. J. (2014). Development of web-based VE supporting system for effective workshop, Korea Institute of Construction Engineering and Management, 15(2), 71-78. https://doi.org/10.6106/KJCEM.2014.15.2.071
- Min, K. S. (2022). A study on the application of smart technology-based VE process model for construction safety management, Doctoral Thesis, Namseoul University, 2022(16), 1-21.
- Min, K. S. (2010). A study of the function analysis for the effective campus master plan through value engineering method, Korea Education and Environment Research Institute, 9(3), 41-48.
- Min, N. R. (2019). A study on improvement of design guidelines for apartment housing through case analysis of VE(Value Engineering), Master's Thesis, Seoul National University of Science & Technology, 93-96.
- Myoung, J. H., Park, J. H., Lee, Y. J., Jung, I. S., & Lee, C. S. (2010). A study on the development of evaluation indication for selection of VE team member, Architectural Institute of Korea, 26(2), 71-78.
- Ok, H., Kim, S. J., & Kim, T. H. (2017). Research on analyzing the current state of design VE information system and connection method, korea Computer Congress, 2017(6), 34-36.
- Ok, H., Kim, S. J., & Kim, T. H. (2018). A study on improvement for connecting function of design VE system in public construction, Korea Computer Congress, 2018(6), 21-23.
- Oh, M. J., Gwak, H. G., Cho, D. H., Park, S. H., & Koo, K. J. (2014). Space hierarchy-based alternative assessment components derived in design VE for elementary school construction, Architectural Institute of Korea, 35(1), 493-494.
- Park, B. S., & Kim, O. K. (2022). A study on the application of design VE process in pre-construction phase for GMP determination of CM at Risk project, Korea Institute of Construction Engineering and Management, 23(5), 56-64.
- Park, C. Y., Yun, S. M., & Lee, D. E. (2021). Establishing the strategy of effective construction VE for construction firms, Korea Institute of Construction Engineering and Management, 22(2), 80-87.
- Park, H. T., Park, C. S., & Jung, W. S. (2014). A study on the improvement of the design VE process using VE idea-databank system, Korea Institute of Construction Engineering and Management, 15(1), 28-38. https://doi.org/10.6106/KJCEM.2014.15.1.028
- Park, J. Y., Seo, H. H. & Kim, B. S. (2018). Improvement plan based on awareness investigation of construction VE system in domestic construction, Korea Institute of Construction Engineering and Management, 19(3), 79-88
- Park. M. S. (2016). A study on the improvements of the conventional bidding system through VE, Doctoral Dissertation, Hoseo University, 90-93.
- Park, Y. J. (2013). Performance and improvement of design VE, Korea land & housing corporation, Korea Institute of Construction Engineering and Management, 14(4), 29-36.
- Shin, J. B., O, J. H., Min, B. G., Son, B. D., & Kim, D. J. (2019). A study on value improvement(VE) of LTE-R radio construction Kyungbu high-speed train, Journal of the Korean Society for Railway, 2019(5), 26-28.
- Shin, Y. S. (2014). Utilization of business creative code for the effective idea generation for design - VE : SMPS design VE case study, Master's Thesis, Sungkyunkwan University, 49-59.
- Song, C. Y., & Yang, B. S. (2021). Development of mobile-based design Value Engineering(VE) supporting system for VE process improvement, The Korea Institute of Building Construction, 21(5), 433-443.
- Song, H. J., Kim, J. H., Han, S. W., & Hyun, C. T. (2015). A VE case study for improving of the public facilities maintainability (Focused on Korea job world new construction), Architectural Institute of Korea, 35(1), 503-504.
- Seog, H. S. (2012). A study on the efficient budget execution of military facilities using Value Engineering (Mainly focused on VE activation in design phase), Master's Thesis, Hanyang University, 32-41.
- Sung, D. S., Chung, W. Y., & Sung, M. J. (2021). Value Engineering for creative career education center construction project, Architectural Institute of Korea, 64(11), 60-63.
- Yang, J. K., Park, G. H., Lee, J. J., Kim, D. H., & Hawng, T. U. (2022). A study on the selection of Value improvement areas for remodeling VE in university facilities, Architectural Institute of Korea, 42(2), 1-4.