과제정보
이 논문은 행정안전부 재난안전 공동연구 기술개발사업의 지원을 받아 수행된 연구임(2022-MOIS63-002).
참고문헌
- Choi, J. S., Shin, Y. J., and Baek, W. H. (2022), Investment Prioritization Method for Steep Slope Retaining Wall Considering the Disaster Risk and the Repair and Reinforcement Cost, Journal of the Korean Geotechnical Society, 38(12), 79-89. (in Korean)
- Evans, L. D., Romine, A. R., Patel, A. J., and Mojab, A. G. (1993), Concrete Pavement Repair Manuals of Practice (No. SHRP-H-349). SHRP-H-349, SHRP, National Research Council, Washington DC.
- Kang, C., Shin, J. Y., and Oh, K. J. (2013), Domestic and foreign facility repair/reinforcement manuals and guidelines, Journal of the Building Construction, 13(6), 18-23. https://doi.org/10.9798/KOSHAM.2013.13.2.057
- KALIS (2022), Guideline and Commentary of Safety Inspection and In-depth Safety Inspection for Structures-Bridge, Korea Infrastructure Safety & Technology Corporation, Korea. (in Korean)
- KALIS (2022), Guide of Calculation for Priority Index(PI), Korea Infrastructure Safety & Technology Corporation, Korea. (in Korean)
- KSMI (2020), Establishment of evaluation criteria, such as performance evaluation guidelines for ancillary facilities and other facilities of dams and river facilities, KALIS. (in Korean)
- Lee, S. W., and Kim, S. H. (2004), Retrofit Measures Based on Seismic Retrofit Priority of Existing Bridges, Journal of Earthquake Engineering Society of Korea, 8(3), 77-86. https://doi.org/10.5000/EESK.2004.8.3.077
- Oh, K. J., and Kang, C. (2012), Development of Program for Decision of Repair and Strengthen Level and Priority in Structures, Proceeding of Korea Concrete Institute, 519-520. (in Korean)
- Park, C. W., and Ju, M. K. (2013), A Decision Model for Repair Priority of Reinforced Concrete Structures. Magazine of the Korea Institute for Structural Maintenance and Inspection, 17(1), 89-101. (in Korean) https://doi.org/10.11112/jksmi.2013.17.3.089
- Team, I. F. (2018). Oroville dam spillway incident. Dam & Safety, (1), 56.