DOI QR코드

DOI QR Code

Eco-integrative Architecture Collaboration Process of High-speed Rail Station - Focused on the Stuttgart Central Station Project -

고속철도역사의 생태통합형 건축 협업 프로세스에 관한 연구 - 슈투트가르트 중앙역 프로젝트를 중심으로 -

  • Jung, Yong-Hwa (School of Architecture, Kyungpook National University) ;
  • Park, Yong-Seo (School of Architecture, Kyungpook National University)
  • Received : 2022.06.21
  • Accepted : 2022.10.16
  • Published : 2022.11.30

Abstract

This study aims to examine the methodological approach of integrated design based on ecological standards of the overall architectural collaboration process centered on the Stuttgart Central Station project. The development background of this project focused on references based on the common guidelines of the master plan of urban and architectural integrated plans and examined all aspects of the architectural design. This integrated the entire design around Light Eye, a module structure in which a skylight-column was integrated. Christoph Ingenhoven's skylight plan was bio-form, Frei Otto's column plan was bubble form, Werner Sobeck's roof plan was shown as the design concept of a hole punching form. This design approach had a tendency toward a net-zero energy structure and implemented eco-integrative architecture. The Stuttgart Central Station project suggested the possibility of a new design methodological approach within the scope of an urban project, and will be a great reference for future explorations of integrated design methodologies based on ecology.

Keywords

Acknowledgement

이 연구는 2022년-2023년도 한국연구재단 연구비 지원에 의한 결과의 일부임. 과제번호: NRF-2021R1I1A3A04037511

References

  1. Clifford, F. (2005). Practical Railway Engineering. 2rd ed., London, Imperial College Press, 145-157.
  2. City of Stuttgart Head of Department for Urban Planning and Renewal. (CSDUPR). (2015). Inner urban development and revitalisation strategies city of stuttgart. 3rd Forum of Sister Cities. Retrived March 16, 2019 from http://www.slideplayer.com/slide/10864960
  3. Eurocode 2. (1992). Design of concrete structures. The EN Euricodes. Retrived August 15, 2019 from https://en.wikipedia.org/wiki/Eurocode_2
  4. European Environment Agency. (2014). Green infrastructure. Biodiversity Ecosystems, Retrived May 25, 2022 from https://www.eea.europa.eu
  5. Eum, J. H., Oh, J. H., Son, J. M., Kim, K., Baek, J. B., & Yi, C. (2019). Analysis Schemes of Wind Ventilation Forest Types. The Korean Association of Geographic information Studies, 22(4), 12-23.
  6. Germany Department of City Planning and Housing. (GDCPH). (2020). Levels of spatial planning stuttgart. City of Stuttgart, Retrived October 12, 2020 from http://www.suttgart.de
  7. Green Cities Policy Tool. (GCPT). (2020). Green vetilation corridors: stuttgart, EBRD. Retrived July 12, 2020 from https://www.ebrdgreencities.com
  8. Heinze, G. W., & Kill, H. H. (1998). The Development of The German Railroad System, Technology University Berlin, Frankfurt am Main: Campus Verlag, 105-134.
  9. Ingenhoven, C. (1994). Hauptverwaltung RWE. Bauwelt, 85(26-32), 1486-1487.
  10. Ingenhoven, C. (2010). Infographic main station stuttgart. Statement of Supergreen®. Retrieved January 10, 2019 from https://www.ingenhovenarchitects.com
  11. Ingenhoven, C. (2012). About us. Ingenhovenarchitects, Retrived March 25, 2022 from https://www.ingenhovenarchitects.com/office/about-us
  12. Ingenhoven, C. (2015). A+U 539 15:08: Ingenhoven Architects Supergreen. A+U Publishing, Tokyo, 220.
  13. Jacobson, M. (2012). Stuttgart green corridors. WWF. Retrived September 4, 2020 from https://wwf.panda.org/wwf_news/Stuttgart-green-corridors
  14. Kapp, R. (2019). Climate analysis map of urban climate stuttgart. Klima luft larm, Retrieved May 20, 2020 from https://www.stadtklima-stuttgart.de
  15. Kristin, F., & Hans-Jurgen, C. (1999). Ingenhoven overdiek and partners, Stuttgart Central Station. Retrieved June 22 to August 1, 1999 from Aedes Architecture Forum
  16. Otto, F., & Rasch, B. (1996). Finding Form Towards an Architecture of the Minimal. 3rd ed., Axel Menges. 240.
  17. Otto, F. (2015). Ausgewahlte arbeiten von frei otto und seinen Teams. Frei Otto Atelier Warmbronn, Retrived June 05, 2020 from http://http://www.freiotto.com
  18. Pepchinski, M. (2021). Central stuttgart station. Architectural Record, Retrived July 17, 2021 from http://digital.bnpmedia.com/publication/?i=715456&article_id=4080023&view=articleBrowser&ver=html5
  19. Service, A., & Station, D. (2018). Historie und moderne im zentrum stuttgarts. Der Neue Bonatzbau. Retrived March 13, 2021 from https://www.der-neue.de
  20. Sobek, W. (2010). Glass structures. The Structural Engineer, 83(7), 32-36.
  21. Sobek, W. (2019). Beton-und Stahlbetonbau. Sonderdruck, 114(5), 346-355.
  22. Werner Sobek-sustainable Engineering and Design. (WSED). (2020). Stuttgart main station(S21) structural engineering of the station and facade engineering. Werner Sobek, Retrived Desember 23, 2020 from https://www.wernersobek.com
  23. Yamazaki. (1999). Rwe tower. Space Modulator, Retrived February 5, 2020 from http://space-modulator.jp