DOI QR코드

DOI QR Code

Rapid construction delivery of COVID-19 special hospital: Case study on Wuhan Huoshenshan hospital

  • Wang, Chen (College of Civil Engineering, Huaqiao University) ;
  • Yu, Liangcheng (College of Civil Engineering, Huaqiao University) ;
  • Kassem, Mukhtar A. (Department of Quantity Surveying, Faculty of Built Environment & Surveying, Universiti Teknologi Malaysia) ;
  • Li, Heng (Department of Building and Real Estate, The Hong Kong Polytechnic University) ;
  • Wang, Ziming (College of Civil Engineering, Huaqiao University)
  • 투고 : 2021.07.13
  • 심사 : 2022.01.04
  • 발행 : 2022.10.25

초록

Infectious disease emergency hospitals are usually temporarily built during the pneumonia epidemic with higher requirements regarding diagnosis and treatment efficiency, hygiene and safety, and infection control.This study aims to identify how the Building Information Modeling (BIM) + Industrialized Building System (IBS) approach could rapidly deliver an infectious disease hospital and develop site epidemic spreading algorithms. Coronavirus-19 pneumonia construction site spreading algorithm model mind map and block diagram of the construction site epidemic spreading algorithm model were developed. BIM+IBS approach could maximize the repetition of reinforced components and reduce the number of particular components. Huoshenshan Hospital adopted IBS and BIM in the construction, which reduced the workload of on-site operations and avoided later rectification. BIM+IBS integrated information on building materials, building planning, building participants, and construction machinery, and realized construction visualization control and parametric design. The delivery of Huoshenshan Hospital was during the most critical period of the Coronavirus-19 pneumonia epidemic. The development of a construction site epidemic spreading algorithm provided theoretical and numerical support for prevention. The agent-based analysis on hospital evacuation observed "arched" congestion formed at the evacuation exit, indicating behavioral blindness caused by fear in emergencies.

키워드

과제정보

The authors are grateful to the research grants awarded by Huaqiao University through grant number (17BS201), and Universiti 668 Teknologi Malaysia (UTM) Research Grant Vot No: (05E79).

참고문헌

  1. Alizadeh, R. (2011), "A dynamic cellular automaton model for evacuation process with obstacles", Safe. Sci., 49(2), 315-323. https://doi.org/10.1016/j.ssci.2010.09.006
  2. Ambat, A.S. and Vyas, N. (2020), "Assessment of preparedness against emerging infectious disease among private hospitals in a district of South India", Med. J. Arm. Force. India, In Press, https://doi.org/10.1016/j.mjafi.2020.02.007.
  3. Choi, J., Leite, F. and de Oliveira, D.P. (2018), "BIM-based benchmarking system for healthcare projects: feasibility study and functional requirements", Automat. Constr., 96, 262-279. https://doi.org/10.1016/j.autcon.2018.09.015
  4. Choi, J., Leite, F. and de Oliveira, D.P. (2020), "BIM-based benchmarking for healthcare construction projects", Automat. Constr., 119, 103347. https://doi.org/10.1016/j.autcon.2020.103347
  5. Choi, J., Yun, S. and De Oliveira, D.P. (2016), "Developing a cost normalization framework for phase-based performance assessment of construction projects", Canadian J. Civil Eng., 43, 1075-1086. https://doi.org/10.1139/cjce-2016-0223
  6. Davies, R. and Harty, C. (2013), "Implementing 'Site BIM': A case study of ICT innovation on a large hospital project", Automat. Constr., 30, 15-24. https://doi.org/10.1016/j.autcon.2012.11.024
  7. Enache-Pommer, E., Horman, M.J., Messner, J.I. and, Riley, D. (2010), A Unified Process Approach to Healthcare Project Delivery: Synergies Between Greening Strategies, Lean Principles, and Bim, Construction Research Congress 2010, 1376-1385.
  8. Ferdous, W., Bai, Y., Ngo, T.D. and Mendis, P. (2019), "New advancements, challenges and opportunities of multi-storey modular buildings: A state-of-the-art review", Eng. Struct., 183, 883-893. https://doi.org/10.1016/j.engstruct.2019.01.061
  9. Isikdag, U. (2012), "Design patterns for BIM-based service-oriented architectures", Automat. Constr., 25, 59-71. https://doi.org/10.1016/j.autcon.2012.04.013
  10. Kahn, N. (2009), "National healthcare capital project benchmarking-an owner's perspective", Health Environ. Res. Des. J., 3, 5-14.
  11. Li, H., Lu, W. and Huang, T. (2009), "Rethinking project management and exploring virtual design and construction as a potential solution", Constr. Manage. Econom., 27(4), 363-371. https://doi.org/10.1080/01446190902838217
  12. Lin, Y., Chen, Y., Huey-Wen, Yien, H., Huang, C. and Su, Y. (2018), "Integrated BIM, game engine and VR technologies for healthcare design: A case study in cancer hospital", Adv. Eng. Inform., 36, 130-145. https://doi.org/10.1016/j.aei.2018.03.005
  13. Manning, R. and Messner, J.I. (2008), "Case studies in BIM implementation for programming of healthcare facilities", J. Inform. Technol. Constr., 13, 446-457.
  14. Mazinani, M. (2020), "The novel zoonotic Coronavirus disease 2019 (COVID-19) pandemic: Health perspective on the outbreak", J. Healthcare Quality Res., In Press. https://doi.org/10.1016/j.jhqr.2020.09.004
  15. Merschbrock, C. and Munkvold, B.E. (2015), "Effective digital collaboration in the construction industry: A case study of BIM deployment in a hospital construction project", Comput. Ind., 73, 1-7. https://doi.org/10.1016/j.compind.2015.07.003
  16. Mousavi, E.S., Bausman, D. and Tafazzoli, M. (2020), "Renovation in hospitals: Training construction crews to work in health care facilities", Am. J. Infect. Control, 48(4), 403-409. https://doi.org/10.1016/j.ajic.2019.08.032
  17. Paul J.L. (1987), "Calculating evacuation time for tall buildings", Fire Safety J., 12, 237. https://doi.org/10.1016/0379-7112(87)90008-7
  18. Segars, J., Katler, Q., McQueen, D.B. and Kawwass, J.F. (2020), "Prior and novel coronaviruses, Coronavirus Disease 2019 (COVID-19), and human reproduction: What is known?", Fertil. Steril., 113(6), 1140-1149. https://doi.org/10.1016/j.fertnstert.2020.04.025
  19. Shirowzhan, S., Sepasgozar, S.M.E., Edwards, D.J., Li, H. and Wang, C. (2020), "BIM compatibility and its differentiation with interoperability challenges as an innovation factor", Automat. Constr., 112, 103086. https://doi.org/10.1016/j.autcon.2020.103086
  20. Suzuki, J., Sasahara, T., Minami, K. and Yamada, T. (2020), "Impact of infectious disease consultation on patients with Staphylococcus aureus bacteremia at a Japanese tertiary hospital: A retrospective observational study", J. Infect. Chemotherapy, 26(8), 780-784. https://doi.org/10.1016/j.jiac.2020.03.003
  21. Talento, A.F., Fitzgerald, M., Redington, B., O'Sullivan, N., Fenelon, L. and Rogers, T.R. (2019), "Prevention of healthcare-associated invasive aspergillosis during hospital construction/renovation works", J. Hospital Infect., 103(1), 1-12. https://doi.org/10.1016/j.jhin.2018.12.020
  22. Zhou, Y., Zhang, Z. and Wang, W. (2020), "Construction time, cost and testing data of a prefabricated isolation medical unit for COVID-19", Data Brief, 32, 106068. https://doi.org/10.1016/j.dib.2020.106068