References
- Cao, M., Cheng, Y., Dai, Z., Zhou, F. and Tan, P. (2012), "Parameter analysis and shaking table test on seismic isolation system of transformer with bushings", Proceedings of the 15th World Conference on Earthquake Engineering, Lisboa, Portugal.
- Dinh, N.H., Lee, S.J., Kim, J.Y. and Choi, K.K. (2020), "Study on seismic performance of a mold transformer through shaking table tests", Appl. Sci., 10, 361. https://doi.org/10.3390/app10010361.
- Filiatrault, A. and Matt, H. (2005), "Experimental seismic response of high-voltage transformer-bushing systems", Earthq. Spectra, 21(4), 1009. http://doi.org/10.1193/1.2044820.
- Filiatrault, A. and Matt, H. (2006), "Seismic response of high voltage electrical transformer-bushing systems", J. Struct. Eng., 132(2), 287-295 https://doi.org/10.1061/(ASCE)0733-9445(2006)132:2(287).
- Fujisaki, E., Takhirov, S., Xie, Q. and Mosalam, M.K. (2014), "Seismic vulnerability of power supply: Lessons learned from recent earthquakes and future horizons of research", Proceedings of the 9th International Conference on Structural Dynamics, EURODYN 2014, Porto, Portugal, June-July.
- Gilani, A., Chavez, J., Fenves, G. and Whittaker, A. (1998) "Seismic evaluation of 196-kV porcelain transformer bushings", PEER Report 1998/02, University of California, Berkeley, CA, USA.
- Gilani, A., Chavez, J., Fenves, G. and Whittaker, A. (1999), "Seismic evaluation of 550kV porcelain transformer bushings", PEER, 1999.
- Gilani, A., Whittaker, A. and Fenves, G. (1999) "Seismic evaluation and retrofit of 230-kV porcelain transformer bushings", PEER Report 1999/14, University of California, Berkeley, CA, USA.
- Gilani, A., Whittaker, A. and Fenves, G. (1999), "Seismic evaluation of 550 kV porcelain transformer bushings", PEER Report 1999/05, University of California, Berkeley, CA, USA.
- Gilani, A., Whittaker, A. and Fenves, G. (2001), "Seismic evaluation and retrofit of 230-kV porcelain transformer bushings", Earthq. Spectra, 17(4), 597. http://doi.org/10.1193/1.1427316.
- He, C., Xie, Q. and Zhou, Y. (2018), "Influence of flange on seismic performance of 1100 kV UHV transformer bushing", Earthq. Spectra, 35(2), 611. http://doi.org/10.1193/012918EQS029M.
- Hwang, K.M., Ham, K.W. and Kim, G.H. (2018), "The experimental study on seismic capacity of 154 kV & 345 kV main transformer bushings", J. Earthq. Eng. Soc. Korea, 22(2), 87-94. (in Korean) https://doi.org/10.5000/EESK.2018.22.2.087
- Institute of Electrical and Electronics Engineers (2013), IEEE 344, Standard for Seismic Qualification of Equipment for Nuclear Power Generating Stations.
- Institute of Electrical and Electronics Engineers. (2005), IEEE Recommended Practice for Seismic Design of Substations, IEEE Std 693.
- International Code Council Evaluation Services Acceptance Criteria 156 (2010), ICC-ES AC156, Acceptance Criteria for Seismic Certification by Shake-table Testing of Nonstructural Components.
- International Electrotechnical Commission (IEC). (2016), Technical Specification: IEC TS 61463:2016-Bushing-Seismic Qualification, Section 7.
- Jang, J.B., Kim, J.K., Hwang, K.M., Ham, K.W., Park, J.W. and Lee, C.W. (2008), "Experimental study of friction pendulum system to improve the seismic capacity of transformer", J. Earthq. Eng. Soc. Korea, 12(2), 1-8. (in Korean)
- Joe, Y.H. and Cho, S.G. (2006) "Modal identification and seismic performance evaluation of 154 kV transformer porcelain bushing by vibration test", J. Earthq. Eng. Soc. Korea, 10(5), 107-115. (in Korean) https://doi.org/10.5000/EESK.2006.10.5.107
- KEPCO (Korea Electric Power Cooperation) (2021), Earthquake Resistant Design Guideleines of Transmission, Substation and Distribution Facilities, Korea. (in Korean)
- Lee, D. and Constantinou, M.C. (2018), "Combined horizontal-vertical seismic isolation system for high-voltage-power transformers: Development, testing and validation", Bull. Earthq. Eng., 16, 4273-4296. https://doi.org/10.1007/s10518-018-0311-2.
- Liu, R.S., Zhang, M.J. and Wu, Y.B. (2012), "Vulnerability study of electric power grid in different intensity area in wenchuan earthquake", Proceedings of the 15th World Conference on Earthquake Engineering, Lisboa, Portugal.
- Matt, H. and Filiatrault, A. (2004), "Seismic qualification requirements for transformer bushings", Research Project Report No. SSRP-2003-12, Department of Structural Engineering, University of California, San Diego, La Jolla, CA, USA.
- Murota, N., Feng, M.Q. and Liu, G.Y. (2006), "Earthquake simulator testing of base-isolated power transformers", IEEE Trans. Power Deliv., 21(3), 1291-1299. https://doi.org/10.1109/TPWRD.2006.874586.
- The Ministry of Interior & Safety (2017), Common Application of Seismic Design Criteria, April.
- UBC97 (1997), Uniform Building Code, International Code of Building Officials (ICBO), California, USA.
- Villaverde, R. and Pardoen, G. (1999), "Ground mtion amplication at base of bushings mounted on electric substation transformer", A Technical Report of Research Supported by PEER/PG&E Under Award No. PGE-09566, Department of Civil Engineering, University of California, Irvine, USA.
- Whittaker, A.S., Fenves, G.L. and Gilani, A.S.J. (2004), "Earthquake performance of porcelain transformer bushings", Earthq. Spectra, 20(1), 205-223 https://doi.org/10.1193/1.1647578.
- Wilcoski, J. (1997), "Demonstration of CERL equipment fragility and protection procedure by fragility testing of a power transformer bushing", ATC-29-1, Seminar Technical Papers.
- Xie, Q., He, C. and Zhou, Y. (2019), "Seismic evaluation of ultra-high voltage wall bushing", Earthq. Spectra, 35(2), 611. http://doi.org/10.1193/012918EQS029M.
- 日本電気協会(2010). 変電所等における電気設備の耐震設計指針, JEAG 5003-2010.