Abstract
Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.
정부의 건설산업 혁신방안 중 기술혁신을 위한 주요과제의 하나인 시공책임형 CM 사업의 제도화를 위해 2017년부터 현재까지 시범사업이 활발하게 이루어지고 있지만, 시공이전단계 사업관리의 핵심인 GMP를 결정하는데 핵심도구인 설계VE와 관련한 기준 및 프로세스는 아직 정립되지 않은 실정이다. 이에 시공책임형 CM과 설계VE 관련 연구 및 운영실태, 그리고 사업참여자 인식조사를 통해 기존 설계VE 프로세스에 대한 문제점을 도출하고, 시공책임형 CM 사업에 적합한 설계VE 프로세스를 제안하고자 하였다. Schedule, Cycle, Process 등 3가지 측면에서 적용안을 제안하였으며 심층면접조사(FGI)를 통해 적절성과 적용성을 검증하였다. 본 연구의 결과는 향후 이루어질 발주기준 정립 및 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.