과제정보
This research was conducted with the support of the "National R&D Project for Smart Construction Technology (No.21SMIP-A158708-02)" funded by the Korea Agency for Infrastructure Technology Advancement under the Ministry of Land, Infrastructure and Transport, and managed by the Korea Expressway Corporation. This research was also supported by the Chung-Ang University Young Scientist Scholarship in 2020.
참고문헌
- Alfieri, E., Seghezzi, E., Sauchelli, M., Di Giuda, G.M. and Masera, G. (2020), "A BIM-based approach for DfMA in building construction: framework and first results on an Italian case study", Architect. Eng. Des. Manag., 16(4), 247-269. https://doi.org/10.1080/17452007.2020.1726725
- Anton, A., Reiter, L., Wangler, T., Frangez, V., Flatt, R.J. and Dillenburger, B. (2021), "A 3D concrete printing prefabrication platform for bespoke columns", Automat. Constr., 122. https://doi.org/10.1016/j.autcon.2020.103467
- Bryden Wood Technology Limited (2017), Delivery Platforms for Government Assets, UK.
- Building and Construction Authority (2016), BIM for DfMA (Design for Manufacturing and Assembly) Essential Guide, Singapore.
- Culmo, M.P., Halling, M.W., Maguire, M. and Mertz, D. (2017), "Recommended guidelines for prefabricated bridge elements and systems tolerances and recommended guidelines for dynamic effects for bridge systems", No. NCHRP Project 12-98, Washington, DC National Academic of Sciences, Engineering, and Medicine, National Academies Press.
- Culmo, M.P., Marsh, L., Stanton, J. and Mertz, D. (2018), "Recommended AASHTO guide specifications for ABC design and construction", NCHRP Project 12-102. Washington, DC: National Academic of Sciences, Engineering, and Medicine, National Academies Press. https://doi.org/10.17226/25034
- Gao, S., Low, S.P. and Nair, K. (2018), "Design for manufacturing and assembly (DfMA): a preliminary study of factors influencing its adoption in Singapore", Architect. Eng. Des. Manag., 14(6), 440-456. https://doi.org/10.1080/17452007.2018.1502653
- Gaudilliere, N., Duballet, R., Bouyssou, C., Mallet, A., Roux, P., Zakeri, M. and Dirrenberger, J. (2018), "Large-scale additive manufacturing of ultra-high-performance concrete of integrated formwork for truss-shaped pillars", In: Robotic Fabrication in Architecture, Art and Design, pp. 459-472. https://doi.org/10.1007/978-3-319-92294-2_35
- Gbadamosi, A.Q., Oyedele, L., Mahamadu, A.M., Kusimo, H., Bilal, M., Delgado, J.M.D. and Muhammed-Yakubu, N. (2020), "Big data for Design Options Repository: Towards a DFMA approach for offsite construction", Automat. Constr., 120. https://doi.org/10.1016/j.autcon.2020.103388
- HM Government (2015), Digital Built Britain Level-3 Building Information Modelling - Strategic Plan, HM Government, London, UK.
- Jeon, C.H., Sim, C. and Shim, C.S. (2021), "The effect of wire rupture on flexural behavior of 45-year-old post-tensioned concrete bridge girders", Eng. Struct., 245. https://doi.org/10.1016/j.engstruct.2021.112842
- Jin, R., Gao, S., Cheshmehzangi, A. and Aboagye-Nimo, E. (2018), "A holistic review of off-site construction literature published between 2008 and 2018", J. Cleaner Prod., 202, 1202-1219. https://doi.org/10.1016/j.jclepro.2018.08.195
- Kim, M.K., McGovern, S., Belsky, M., Middleton, C. and Brilakis, I. (2016), "A suitability analysis of precast components for standardized bridge construction in the United Kingdom", Procedia Eng., 164, 188-195. https://doi.org/10.1016/j.proeng.2016.11.609
- Koem, C. (2020), "Prestressing levels of post-tensioned precast columns with continuous rebars at joints", Ph.D. Dissertation; Chung-Ang University, Seoul, Korea.
- Koem, C., Shim, C.S. and Park, S.J. (2016), "Seismic performance of prefabricated bridge columns with combination of continuous mild reinforcements and partially unbonded tendons", Smart Struct. Syst., Int. J., 17(4), 541-557. https://doi.org/10.12989/sss.2016.17.4.541
- Lee, K.M., Lee, Y.B., Shim, C.S. and Park, K.L. (2012), "Bridge information models for construction of a concrete box-girder bridge", Struct. Infrastr. Eng., 8(7), 687-703. https://doi.org/10.1080/15732471003727977
- Park, S., Koem, C. and Shim, C. (2020), "Quantitative Definition of Seismic Performance Levels for Precast Bridge Piers with Continuous Reinforcement", Adv. Civil Eng.
- Shim, C.S., Chung. C.H. and Kim, H.H. (2008), "Experimental evaluation of seismic performance of precast segmental bridge piers with a circular solid section", Eng. Struct., 30(12), 3782-3792. https://doi.org/10.1016/j.engstruct.2008.07.005
- Shim, C.S., Chung, C.H., Kim, I.K. and Kim, Y.J. (2010), "Development and Application of Precast Decks for Composite Bridges", Struct. Eng. Int., 20(2), 126-133. https://doi.org/10.2749/101686610791283623
- Shim, C.S., Lee, K.M., Kang, L.S., Hwang, J. and Kim, Y.H. (2012), "Three-Dimensional Information Model-Based Bridge Engineering in Korea", Struct. Eng. Int., 22(1), 8-13. https://doi.org/10.2749/101686612X13216060212834
- Shim, C.S., Kang, W.R., Dang, N.S. and Lee, D.K. (2017a), "Development of BIM-based bridge maintenance system for cable-stayed bridges", Smart Struct. Syst., Int. J., 20(6), 697-708. https://doi.org/10.12989/sss.2017.20.6.697
- Shim, C.S., Lee, S.Y., Park, S.J. and Koem, C. (2017b), "Experiments on prefabricated segmental bridge piers with continuous longitudinal reinforcing bars", Eng. Struct., 132, 671-683. https://doi.org/10.1016/j.engstruct.2016.11.070
- Shim, C.S., Dang, S.N. and Park, S.J. (2018), "Three-dimensional information delivery for design and construction of prefabricated bridge piers", Struct. Eng. Int., 28(1), 6-12. https://doi.org/10.1080/10168664.2018.1431378
- Shim, C.S., Dang, N.S., Lon, S. and Jeon, C.H. (2019), "Development of a bridge maintenance system for PSC bridges using 3D digital twin model", Struct. Infrastr. Eng., 15(10), 1319-1332. https://doi.org/10.1080/15732479.2019.1620789
- Sideris, P., Aref, A.J. and Filiatrault, A. (2015), "Experimental seismic performance of a hybrid sliding-rocking bridge for various specimen configurations and seismic loading conditions", J. Bridge Eng., 20(11). https://doi.org/10.1061/(ASCE)BE.1943-5592.0000742
- UK BIM Alliance (2019), "Information Management According to BS EN ISO 19650 (Guidance Part 1: Concepts)".
- Wang, Z., Ge, J. and Wei, H. (2014), "Seismic performance of precast hollow bridge piers with different construction details", Front. Struct. Civil Eng., 8(4), 399-413. https://doi.org/10.1007/s11709-014-0273-7
- Yuan, Z., Sun, C. and Wang, Y. (2018), "Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings", Automat. Constr., 88, 13-22. https://doi.org/10.1016/j.autcon.2017.12.021