DOI QR코드

DOI QR Code

Load-settlement curve combining base and shaft resistance considering curing of cement paste

  • Seo, Mi Jeong (School of Civil, Environmental and Architectural Engineering, Korea University) ;
  • Park, Jong-Bae (Land and Housing Institute, Korea Land & Housing Corporation) ;
  • Lee, Dongsoo (School of Civil, Environmental and Architectural Engineering, Korea University) ;
  • Lee, Jong-Sub (School of Civil, Environmental and Architectural Engineering, Korea University)
  • 투고 : 2022.01.02
  • 심사 : 2022.04.10
  • 발행 : 2022.05.25

초록

Embedded piles, which are typically used in Korea, are precast piles inserted into prebored ground with cement paste. Dynamic pile tests tend to underestimate the bearing capacity of embedded piles because of the undeveloped shaft resistance prior to the curing of the cement paste and the insufficient energy transferred after the curing. In this study, a resistance combination method using the base resistance before the cement paste is cured and the shaft resistance after the cement paste is cured is proposed to obtain a combined load-settlement curve from dynamic pile tests. Two pairs of embedded piles with diameters of 600 and 500 mm are installed. Each pair comprises one pile for the dynamic pile test and another pile for the static load test. The shape of the load-settlement curve obtained using the proposed method is similar to that obtained from the static load test. Thus, the resistances evaluated using the proposed method at selected settlements are similar to those obtained from the static load test. This study shows that the resistance combination method may be used effectively in dynamic pile tests to accurately evaluate the bearing capacity of embedded piles.

키워드

과제정보

This work was supported by the Land and Housing Institute (LHI) research funded by the Korea Land and Housing Corporation (No. 2020-124) and the National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIT) (No. NRF-2021R1A5A1032433).

참고문헌

  1. AS-2159 (1995), Piling design and installation, Standards Association of Australia, Sydney, Australia.
  2. ASTM D1143 (2013), Standard test methods for deep foundations under static axial compressive load, ASTM International, West Conshohocken, Pennsylvania, USA.
  3. ASTM D4945 (2017), Standard test methods for high-strain dynamic testing of deep foundations, ASTM International, West Conshohocken, Pennsylvania, USA.
  4. Coyle, H.M. and Reese, L.C. (1996), "Load transfer for axially loaded piles in clay", J. Soil Mech. Found. Div., 92(2), 1-26. https://doi.org/10.1061/JSFEAQ.0000850.
  5. Fellenius, B.H. (1980), "The analysis of results from routine pile load tests", Ground Eng., 13(6), 19-31.
  6. Han, K., Seo, M.J., Hong, W.T. and Lee, J.S. (2020), "End-bearing capacity of embedded piles with inclined-base plate: laboratory model tests", J. Geotech. Geoenviron. Eng., 146(8), 04020063. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002304.
  7. Hirayama, H. (1990), "Load-settlement analysis for bored piles using hyperbolic transfer functions", Soils Found., 30(1), 55-64. https://doi.org/10.3208/sandf1972.30.55.
  8. Hong, W.P. and Chai, S.G. (2005), "Bearing capacity of the SDA pile in cohesive soil", Proceedings of the 15th International Offshore and Polar Engineering Conference, Seoul, Korea, June.
  9. Hong, W.P. and Chai, S.G. (2003), "Skin friction capacity of SDA pile", Proceedings of the 13th International Offshore and Polar Engineering Conference, Honolulu, Hawaii, May.
  10. Lashkari, A. (2013), "Prediction of the shaft resistance of nondisplacement piles in sand", Int. J. Numer. Anal. Method. Geomech., 37(8), 904-931. https://doi.org/10.1002/nag.1129.
  11. Lee, J.S. and Park, Y.H. (2008), "Equivalent pile load-head settlement curve using a bi-directional pile load test", Comput. Geotech., 35(1), 124-133. https://doi.org/10.1016/j.compgeo.2007.06.008.
  12. Li, L., Li, J., Sun, D. and Gong, W. (2017) "A semi-analytical approach for time-dependent load-settlement response of a jacked pile in clay strata", Can. Geotech. J., 54(12), 1682-1692. https://doi.org/10.1139/cgj-2016-0561.
  13. Likins, G. and Rausche, F. (2004), "Correlation of CAPWAP with static load tests", Proceedings of the 7th International Conference on the Application of Stress-wave Theory to Piles, Kuala Lumpur, Malaysia, August.
  14. Likins, G., Rausche, F., Thendean, G., and Svinkin, M. (1996), "CAPWAP correlation studies", Proceedings of the 5th International Conference on the Application of Stress-wave Theory to Piles, Orlando, Florida, September.
  15. Mascarucci, Y., Miliziano, S. and Mandolini, A. (2014), "A numerical approach to estimate shaft friction of bored piles in sands", Acta Geotechnica, 9(3), 547-560. https://doi.org/10.1007/s11440-014-0305-4.
  16. Murakami, D.K. (2019), "A new concept of match quality of settlements for signal matching analysis on the dynamic pile testing", Proceedings of the 10th International Conference on Stress Wave Theory and Testing Methods for Deep Foundations, Lowell, Massachusetts, June.
  17. Park, J.B. (2017), "A comparative study on the bearing capacity of dynamic load test and static load test of PHC bored pile", J. Korean Geo-environmental Soc., 18(9), 19-31.
  18. Pile Dynamics Inc. (2014), CAPWAP background report version 2014, Pile Dynamics Inc., Cleveland, Ohio, USA.
  19. Poulos, H.G. and Davis, E.H. (1968), "The settlement behaviour of single axially loaded incompressible piles and piers", Geotechnique, 18, 351-371. https://doi.org/10.1680/geot.1968.18.3.351.
  20. Randolph, M.F. and Wroth, C.P. (1978), "Analysis of deformation of vertically loaded piles", J. Geotech. Eng. Div., 104, 1465-1488. https://doi.org/10.1061/AJGEB6.0000729.
  21. Rausche, F., Likins, G., Liang, L. and Hussein, M. (2010), "Static and dynamic models for CAPWAP signal matching", Proceedings of the Art of Foundation Engineering Practice 2010, West Palm Beach, Florida, February. https://doi.org/10.1061/41093(372)27.
  22. Rollins, K.M., Clayton, R.J., Mikesell, R.C. and Blaise, B. (2005), "Drilled shaft side friction in gravelly soils", J. Geotech. Geoenviron. Eng., 131(8), 987-1003. https://doi.org/10.1061/(ASCE)1090-0241(2005)131:8(987).
  23. Seo, M.J., Han, K., Park, J.B., Jeong, K.H. and Lee, J.S. (2021), "End bearing capacity of embedded piles with inclined base plate: Field dynamic and static tests", Geomech. Eng., 26(3), 261-274. https://doi.org/10.12989/gae.2021.26.3.261.
  24. Seo, M., Park, J.B. and Lee, J.S. (2019), "Tip resistance characterization of embedded piles with inclined tip plates using dynamic tests", Proceedings of the 16th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, Taipei, Taiwan, October.
  25. Terzaghi, K. and Peck, R. (1967), Soil mechanics in engineering practice, John Wiley, New York, USA.
  26. Touma, F.T. and Reese, L.C. (1974), "Behaviors of bored piles in sand", J. Geotech. Geoenviron. Eng., 1007), 749-761. https://doi.org/10.1061/AJGEB6.0000065.
  27. Woodward, R.J., Gardner, W.S. and Greer, D.M. (1972), Drilled pier foundations, McGraw-Hill, New York, USA.
  28. Zhang, Q., Feng, R., Yu, Y., Liu, S. and Qian, J. (2019), "Simplified approach for prediction of nonlinear response of bored pile embedded in sand", Soils Found., 59(5), 1562-1578. https://doi.org/10.1016/j.sandf.2019.07.011.