Slurry TBM의 굴진 데이터를 이용한 막장 거동의 추측

  • Published : 2022.03.21

Abstract

Keywords

References

  1. 김재영, 채종길, 전기찬 (2016), "이수식 쉴드 막장안정관리(1)" 한국터널지하공간학회지 Vol.18, No.3, p.5~19.
  2. Guglielmetti, V., Grasso, P., Mahtab, A., and Xu, S. (2008), "Mechanized tunnelling in urban areas - design methodology and construction control", Taylor and Francis.
  3. Hassanpour, J., Rostami, J., and Zhao, J. (2011) "A new hard rock TBM performance prediction model for project planning", Tunnelling and Underground Space Technology, 26, p.595~603. https://doi.org/10.1016/j.tust.2011.04.004
  4. Mooney, M.A., Grasmick, J., Kenneally, B., and Fang, Y. (2016) "The role of slurry TBM parameters on ground deformation: Field results and computational modelling", Tunnelling and Underground Space Technology, 57, p.257~264. https://doi.org/10.1016/j.tust.2016.01.007
  5. Wittke, W., Druffel, R., Erichsen, C., Gattermann, J., Kiehl, J. Schmitt, D., Tegelkamp, M., Wittke, M., Wittke-Gattermann, P. and Wittke-Schhmit, B. (2007) "Stability analysis and design for mechanized tunneling", Grundbau und Felsbau GmbH, Aachen.