References
- 김재영, 채종길, 전기찬 (2016), "이수식 쉴드 막장안정관리(1)" 한국터널지하공간학회지 Vol.18, No.3, p.5~19.
- Guglielmetti, V., Grasso, P., Mahtab, A., and Xu, S. (2008), "Mechanized tunnelling in urban areas - design methodology and construction control", Taylor and Francis.
- Hassanpour, J., Rostami, J., and Zhao, J. (2011) "A new hard rock TBM performance prediction model for project planning", Tunnelling and Underground Space Technology, 26, p.595~603. https://doi.org/10.1016/j.tust.2011.04.004
- Mooney, M.A., Grasmick, J., Kenneally, B., and Fang, Y. (2016) "The role of slurry TBM parameters on ground deformation: Field results and computational modelling", Tunnelling and Underground Space Technology, 57, p.257~264. https://doi.org/10.1016/j.tust.2016.01.007
- Wittke, W., Druffel, R., Erichsen, C., Gattermann, J., Kiehl, J. Schmitt, D., Tegelkamp, M., Wittke, M., Wittke-Gattermann, P. and Wittke-Schhmit, B. (2007) "Stability analysis and design for mechanized tunneling", Grundbau und Felsbau GmbH, Aachen.