DOI QR코드

DOI QR Code

A study on the application of agile method to resolve electric system issues in the performance improvement of aged aircraft in the phase of mass production

양산 단계 노후 항공기 성능 개량에서 전기계통 이슈 해결을 위한 애자일 기법 적용연구

  • Received : 2022.10.24
  • Accepted : 2022.11.21
  • Published : 2022.12.31

Abstract

This paper proposed an application of agile management method to resolve the electrical system issues identified during the mass production phase of aged aircraft performance improvement. The proposed method was applied from issue analysis to on-site verification and testing stage, before the formal configuration control process. At this time, the project was carried out by setting a sprint period to complete the verification according to requirements through daily scrum and sprint review. As a result, It was verified that the wiring installation of the aircraft, which was the output of the sprint, met requirements within the defined sprint period.

본 논문은 양산 단계 항공기 성능개량 진행 중 개조 현장에서 식별되는 전기계통 이슈를 해결하기 위해 애자일 사업관리 기법 적용방안을 제안하였다. 제안된 애자일 기법은 공식 형상심의 절차 진입 전까지 이슈분석 단계와 현장점검 단계에 적용하였다. 이 때 일일 스크럼과 스프린트 리뷰를 통해 보완 설계를 거쳐 요구사항에 따른 배선 장착 및 검증까지 스프린트 기간을 정하여 사업을 진행하였다. 결과적으로 정의된 스프린트 기간 내에 일정지연 없이 스프린트 산출물인 항공기 배선장착이 정의된 요구사항을 충족 하는 것으로 검증되었다.

Keywords

References

  1. DAPA, "Military aircraft standard airworthine ss certification criteria (Part 1)," Enforcement on April 11, 2017. https://www.law.go.kr/LSW/admRulLsInfoP.do?admRulSeq=2100000084111
  2. Kim tai-dal, "Software development project management using Agile methodology," The Journal of The Institute of Internet, Broadcast ing and Communication (IIBC), vol.16, no.1, pp.155-162, 2016. DOI: 10.7236/JIIBC.2016.16.1.155
  3. Sungwoong Seo, Hwuije Cho, Euijong Hw ang, Jinyoung Huh, Yulan Kwon, Daehong Min, Dongil Shin, Gwang-Yong Gim, "A Study on the Effective Transformation Application for the Agile Project Management (APM) Approach in the Traditional Project Management (TPM) Organization - Focused on S/W Development Organization of Korean Conglomerates Performing Large-scale IT Projects -," Journal of The Korea Society of Information Technology Policy & Management (ITPM), vol.12, no.01, pp.1545-1550, 2020.
  4. Kim, Hyeon Wook, "A Case Study of Adapting Disciplined Agile Scrum technique for IT Projects," Master thesis, Kookmin University, 2019.
  5. Jae Wang Lee, "A Study on the Concept and Application of Agile Project Management," Journal of the Korean society of Systems Engineering, Vol.6, No.2, pp.47-57, 2010.
  6. SungHyun Yun, GyooGun Lim, "A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military," Journal of Information Technology Services, vol.20, no.1, pp.41-54, 2021. DOI: 10.9716/KITS.2021.20.1.041
  7. Rashina Hoda, James Noble, Stuart Mars hall, "Agile Project Management," in Proc. of the 6th New Zealand Computer Science Research Student Conference (NZCSRSC 2008), pp.218-221, 2008.
  8. Pak, Eun Seok "A Study on Application of the CMMI for Web Service Product Develop ment Process using Agile Method:focused on Scrum-based process improvement practice," Master thesis, Korea University, 2009.
  9. Kim, Hye Min, "A Case Study of Android Applications Development with Agile Methodol ogy," Master thesis, Soongsil University, 2013.
  10. MD Helicopters Inc, "(CSP-HMI-3) Handbook of maintenance instructions instrume nts-electrical-avionics for MDHC 369D/E/FF5 00/600N helicopters, 95-30-00 figure 401," Revision 7, pp.403, ISSUED: 31 OCTOBER 1990, Revision No.12: 2003.
  11. A Universal News Organization (UNO), "CH-47 Chinook Helicopter News and History," http://www.chinook-helicopter.com/history/aircraft/D_Models/91-00256/91-00256.html
  12. U. S. Department of Defense, "News-Multimedia-Photos," https://media.defense.gov/2020/Jul/01/2002350030/-1/-1/0/200612-A-AB123-1122.JPG