References
- A GUIDE TO THE PROJECT MANAGEMENt BODY OF KNOWLEDGE, (PMBOK Guide) - Fifth Edition.
- Cho, S. H., Yoon, B. K. (2019). An Analysis on the Operation Level of the Dry Dock for Warship Maintenance Using Priority Queue, The Korean Operations Research and Management Science Society, 36(1), pp. 37-49.
- Frederick s., Gerald J.(2013). Management Science, Introduction to Operations Management. 9th Edition. McGrawHill. Chapter 17.
- Ham, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of Korea Institute of Building Information Modeling, 5(2), pp. 1-11.
- Ham, N. H., Moon, S. K., Kim, J. H., Kim, J. J. (2020). Optimal BIM staffing in construction projects using a queueing model, Automation in Construction, 113, pp. 1-14.
- Ham, N. H., Yuh, O. K., Ji, K. H. (2018). Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase, Journal of Korea Institute of Building Information Modeling, 8(3), pp. 31-42.
- Ham, N. K., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of Korea Institute of Building Information Modeling, 5(2), pp. 1-11.
- Her, B., Shim, J. H., Kim, H. S., Kim, D. H. (2012). Design Error Classification and Causation in BIM Design, Journal of the Architectural Institute of Korea, 28(10), pp. 21-29.
- Ji, K. C., Yu, J. H., Kim, C. D. (2006). The Schema of Work Delay Analysis by Input Factor in Construction, Architectural Institute of Korea, 22(11), pp. 181-188.
- Kang, T. W., Won, J. S., Lee, G. (2013). A Study on the Development Direction of a BIM Performance Assessment Tool, Journal of Korea Spatial Information Society, 21(2), pp. 53-62. https://doi.org/10.12672/ksis.2013.21.1.053
- Kim, B. J., Ju, H. W., Jang, M. S., Kim, B. J., Chin, S. Y. (2016). An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies, ournal of Korea Institute of Building Information Modeling, 6(2), pp. 47-57.
- Kim, H. J., Yoo, M. Y., Kim, J. J., Choi, C. S. (2017). Performance Analysis of BIM Labor using Case Analysis, Journal of Korea Institute of Building Information Modeling, 7(3), pp. 31-39.
- Kim, I. H., Cho, G. H., Choi, J. S., Chun, E. Y. (2011). Open BIM-based Vertical Circulation Planning and Verifying Modules for Super-Tall Building at the Schematic Design Phase, Korean Journal of Computational Design and Engine, 16(2), pp. 156-164.
- Kim, J. H. (2008). The Constitution Plan of Design Error Management System in Construction Projects, Architectural Institute of Korea, 10(3), pp. 231-238.
- Ku, S. H., Ahn, B.J., Kim, J. H. (2003). Improving Construability by Analyzing Influencing Factors of Core-Wall Construction, Korea Journal of Construction Engineering and Management, 2003, pp. 606-609.
- Kwon, O. C., Cho, J. W., Jo, C. W. (2013). BIM Quality Assurance for DFS in Design Phase, Transactions of the Society of CAD/CAM Engineers, 18(5), pp. 348-358. https://doi.org/10.7315/CADCAM.2013.348
- Lee, G., Park, H. K., Won, J. S. (2012). D3 City project-Economic impact of BIM-assisted design validation, Automation in Construction, 22, pp. 577-586. https://doi.org/10.1016/j.autcon.2011.12.003
- Lee, N. J., Kim, J. H., Ji, S. M., Hyun, C. T. (2011). Development of Construction Documents Checklist for Preventing Error of Design Process in Public Construction Projects, JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA, 27(2), pp. 149-158.
- Lobert, L., Peter, E. D. L., David, J. E., Peter, R. D. (2010). Design Error Classification, Causation, and Prevention in Construction Engineering, Journal of Performance of Constructed Facilities, 24(4), pp. 399-408. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000116
- Neelamkavil, J., Ahamed, S. S. (2012). The Return on Investment from BIM-driven Projects in Construction, IRC-RR-324 National Research Council, Canada, 324, pp. 1-26.
- Bailey, Norman T. J. (2003) A STUDY OF QUEUES AND ApPOINTMENT SYSTEMS IN HOSPITAL OUT-PATIENT DEPARTMENTS, WITH SPECIAL REFERENCE TO WAITING-TIMES, 185, pp. 185-198.
- Park, H. D. (2020). An Analysis of Structural Framework Performance of LMT tower in Haeundae- 101 story Reinforced Concrete High-rise Building-, ARCHITECTURAL INSTITUTE OF KOREA, 40(1), pp. 352-355.
- Shin, H. W., Kim, G. H., Kim, J. Y., Cho, H. K. (2007). A Research on a Comparison between the Strength and Weakness of Each Form work Methods in the Core Wall Construction, Journal of the Korea Institute of Building Construction, pp. 153-159.
- TUGBA, C. Y., EMRE, V. (2003). OUTPATIENT SCHEDULING IN HEALTH CARE: A REVIEW OF LITERATURE, PRODUCTION AND OPERATIONS MANAGEMENT, 12(4), pp. 519-549. https://doi.org/10.1111/j.1937-5956.2003.tb00218.x
- Won, J. S. (2017). An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression, Journal of the Korea Institute of Building Construction, 17(1), pp. 264-267.
- Yang, D. S. (2017). Development of an Verification System for Enhancing BIM Design Base on Usability, Land and Housing Institute, 8(1), pp. 23-29.
- Yun, T. H., Han, M. C., Ham, N. H., Kim, J. J. (2019). A Case Study on the Benefits of Construction Project with BIM, Journal of Korea Institute of Building Information Modeling, 9(4), pp. 10-20.