BIM-based Design Verification Performance Analysis with Priority Rules Applied

우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석

  • 허승하 (한양대학교 건축공학과) ;
  • 심재형 (한양대학교 건축공학과) ;
  • 함남혁 (한양사이버대학교 건축도시건설공학부) ;
  • 김재준 (한양대학교 건축공학부)
  • Received : 2021.06.21
  • Accepted : 2021.08.27
  • Published : 2021.09.30

Abstract

BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.

Keywords

References

  1. A GUIDE TO THE PROJECT MANAGEMENt BODY OF KNOWLEDGE, (PMBOK Guide) - Fifth Edition.
  2. Cho, S. H., Yoon, B. K. (2019). An Analysis on the Operation Level of the Dry Dock for Warship Maintenance Using Priority Queue, The Korean Operations Research and Management Science Society, 36(1), pp. 37-49.
  3. Frederick s., Gerald J.(2013). Management Science, Introduction to Operations Management. 9th Edition. McGrawHill. Chapter 17.
  4. Ham, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of Korea Institute of Building Information Modeling, 5(2), pp. 1-11.
  5. Ham, N. H., Moon, S. K., Kim, J. H., Kim, J. J. (2020). Optimal BIM staffing in construction projects using a queueing model, Automation in Construction, 113, pp. 1-14.
  6. Ham, N. H., Yuh, O. K., Ji, K. H. (2018). Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase, Journal of Korea Institute of Building Information Modeling, 8(3), pp. 31-42.
  7. Ham, N. K., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of Korea Institute of Building Information Modeling, 5(2), pp. 1-11.
  8. Her, B., Shim, J. H., Kim, H. S., Kim, D. H. (2012). Design Error Classification and Causation in BIM Design, Journal of the Architectural Institute of Korea, 28(10), pp. 21-29.
  9. Ji, K. C., Yu, J. H., Kim, C. D. (2006). The Schema of Work Delay Analysis by Input Factor in Construction, Architectural Institute of Korea, 22(11), pp. 181-188.
  10. Kang, T. W., Won, J. S., Lee, G. (2013). A Study on the Development Direction of a BIM Performance Assessment Tool, Journal of Korea Spatial Information Society, 21(2), pp. 53-62. https://doi.org/10.12672/ksis.2013.21.1.053
  11. Kim, B. J., Ju, H. W., Jang, M. S., Kim, B. J., Chin, S. Y. (2016). An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies, ournal of Korea Institute of Building Information Modeling, 6(2), pp. 47-57.
  12. Kim, H. J., Yoo, M. Y., Kim, J. J., Choi, C. S. (2017). Performance Analysis of BIM Labor using Case Analysis, Journal of Korea Institute of Building Information Modeling, 7(3), pp. 31-39.
  13. Kim, I. H., Cho, G. H., Choi, J. S., Chun, E. Y. (2011). Open BIM-based Vertical Circulation Planning and Verifying Modules for Super-Tall Building at the Schematic Design Phase, Korean Journal of Computational Design and Engine, 16(2), pp. 156-164.
  14. Kim, J. H. (2008). The Constitution Plan of Design Error Management System in Construction Projects, Architectural Institute of Korea, 10(3), pp. 231-238.
  15. Ku, S. H., Ahn, B.J., Kim, J. H. (2003). Improving Construability by Analyzing Influencing Factors of Core-Wall Construction, Korea Journal of Construction Engineering and Management, 2003, pp. 606-609.
  16. Kwon, O. C., Cho, J. W., Jo, C. W. (2013). BIM Quality Assurance for DFS in Design Phase, Transactions of the Society of CAD/CAM Engineers, 18(5), pp. 348-358. https://doi.org/10.7315/CADCAM.2013.348
  17. Lee, G., Park, H. K., Won, J. S. (2012). D3 City project-Economic impact of BIM-assisted design validation, Automation in Construction, 22, pp. 577-586. https://doi.org/10.1016/j.autcon.2011.12.003
  18. Lee, N. J., Kim, J. H., Ji, S. M., Hyun, C. T. (2011). Development of Construction Documents Checklist for Preventing Error of Design Process in Public Construction Projects, JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA, 27(2), pp. 149-158.
  19. Lobert, L., Peter, E. D. L., David, J. E., Peter, R. D. (2010). Design Error Classification, Causation, and Prevention in Construction Engineering, Journal of Performance of Constructed Facilities, 24(4), pp. 399-408. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000116
  20. Neelamkavil, J., Ahamed, S. S. (2012). The Return on Investment from BIM-driven Projects in Construction, IRC-RR-324 National Research Council, Canada, 324, pp. 1-26.
  21. Bailey, Norman T. J. (2003) A STUDY OF QUEUES AND ApPOINTMENT SYSTEMS IN HOSPITAL OUT-PATIENT DEPARTMENTS, WITH SPECIAL REFERENCE TO WAITING-TIMES, 185, pp. 185-198.
  22. Park, H. D. (2020). An Analysis of Structural Framework Performance of LMT tower in Haeundae- 101 story Reinforced Concrete High-rise Building-, ARCHITECTURAL INSTITUTE OF KOREA, 40(1), pp. 352-355.
  23. Shin, H. W., Kim, G. H., Kim, J. Y., Cho, H. K. (2007). A Research on a Comparison between the Strength and Weakness of Each Form work Methods in the Core Wall Construction, Journal of the Korea Institute of Building Construction, pp. 153-159.
  24. TUGBA, C. Y., EMRE, V. (2003). OUTPATIENT SCHEDULING IN HEALTH CARE: A REVIEW OF LITERATURE, PRODUCTION AND OPERATIONS MANAGEMENT, 12(4), pp. 519-549. https://doi.org/10.1111/j.1937-5956.2003.tb00218.x
  25. Won, J. S. (2017). An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression, Journal of the Korea Institute of Building Construction, 17(1), pp. 264-267.
  26. Yang, D. S. (2017). Development of an Verification System for Enhancing BIM Design Base on Usability, Land and Housing Institute, 8(1), pp. 23-29.
  27. Yun, T. H., Han, M. C., Ham, N. H., Kim, J. J. (2019). A Case Study on the Benefits of Construction Project with BIM, Journal of Korea Institute of Building Information Modeling, 9(4), pp. 10-20.