DOI QR코드

DOI QR Code

Effects of vertical stiffness of rail fastening system on the behavior of the end regions of railway bridges with slab tracks

  • Sung, Deokyong (Department of Civil & Railroad Engineering, Daewon University College) ;
  • Pyo, Sukhoon (Department of Urban & Environmental Engineering, Ulsan National Institute of Science and Technology (UNIST)) ;
  • Chang, Seongkyu (Department of Civil Engineering, Gwangju University)
  • 투고 : 2019.12.29
  • 심사 : 2021.09.23
  • 발행 : 2021.10.25

초록

A railway bridge with slab track is subjected to end rotations because of the deflection of the girder during train operation. At the ends of a slab track, the end rotation of the bridge girder causes uplift deformation of the slab track, and leads to compressive stresses in the rail fasteners. In this study, a prototype bridge consisting of one span of a girder and one span of an abutment along with a slab track was constructed, and the uplift and compressive forces generated in the rail fastening system were experimentally analyzed. To effectively analyze the experimental results using a numerical method, a series of finite element analyses were performed considering the nonlinear nature of the rail fastening system. A comparison between the experimental and analytical results indicated that the higher the stiffness of the rail fastening system, the greater the uplift and compressive forces. In addition, a nonlinear model provided better correlation with the experimental results than a linear model. Therefore, when reviewing the serviceability of the rail fastening system at railway bridge ends, an adequate finite element model considering the uplift and compressive forces in the rail fastening system should be used.

키워드

과제정보

This research was supported by the Korea Agency for Infrastructure Technology Advancement (KAIA) grant funded by the Ministry of Land, Infrastructure and Transport (Grant 21CTAP-C152046-03 and 21CTAP-C163958-01) and by research funds from Gwangju University in 2021. The opinions expressed in this paper are those of the authors and do not necessarily reflect the views of the sponsors.

참고문헌

  1. Choi, J.H. (2014), "Influence of rail supporting spacing of railway bridge deck ends on bridge-track interaction forces", J. Korean Soc. Railw., 17(4), 245-250. [in Korean]. https://doi.org/10.7782/JKSR.2014.17.4.245.
  2. Diego, S., Casado, J.A., Carrascal, I., Polanco, J.A. and Gutierrez-Solana, F. (2010), "Experimental validation of an adjustable railway fastening for slab track", J. Test. Eval., 38(5), 598-608. https://doi.org/10.1520/JTE102763.
  3. DS804 Appendix 29. (2008), Bridge deck ends, check for serviceability limit state of superstructure. Regulation for railway bridges and other civil constructions. Deutsche Bahn AG, Berlin, Germany.
  4. EN 13146-7. (2012), Railway applications-Track. Test methods for fastening systems. Determination of clamping force (Part 7). European Committee for Standardization (CEN), Brussels, Belgium.
  5. Esveld, C. (2001), Modern Railway Track, (2nd Edition), MRT Productions, Zaltbommel, The Netherlands.
  6. Fermer, M. and Nielsen, J.C.O. (1995), "Vertical interaction between train and track with soft and stiff railpads - full-scale experiments and theory", P. I. Mech. Eng. F- J. Rai., 209(1), 39-47. https://doi.org/10.1243/PIME_PROC_1995_209_253_02.
  7. Gautier, P.E. (2015), "Slab track: Review of existing systems and optimization potentials including very high speed", Constr. Build. Mater., 92, 9-15. https://doi.org/10.1016/j.conbuildmat.2015.03.102.
  8. Giannakos, K. (2016), "Deflection of a railway reinforced concrete slab track: Comparing the theoretical results with experimental measurements", Eng. Struct., 122, 296-309. https://doi.org/10.1016/j.engstruct.2016.04.058.
  9. Gou, H., Ran, Z., Yang, L., Bao, Y. and Pu, Q. (2019a), "Mapping vertical bridge deformations to track geometry for high-speed railway", Steel Compos. Struct., 32(4), 467-478. https://doi.org/10.12989/scs.2019.32.4.467.
  10. Gou, H., Yang, L., Mo, Z., Guo, W., Shi, X. and Bao, Y. (2019b), "Effect of Long-Term Bridge Deformations on Safe Operation of High-Speed Railway and Vibration of Vehicle-Bridge Coupled System", Int. J. Struct. Stab. Dy., 19(9), 1950111. https://doi.org/10.1142/S0219455419501116.
  11. Hess, J. (2008), Rail expansion joints-the underestimated track work material? In Track-Bridge Interaction on High-Speed Railways: Selected and revised papers from the Workshop on Track-Bridge Interaction on High-Speed Railways, Porto, Portugal, 15-16 October.
  12. Kang, C., Schneider, S., Wenner, M. and Marx S. (2018), "Development of design and construction of high-speed railway bridges in Germany", Eng. Struct., 163, 184-196. https://doi.org/10.1016/j.engstruct.2018.02.059.
  13. Koroma, S.G., Hussein, M.F.M. and Owen, J.S. (2015), "Influence of preload and nonlinearity of railpads on vibration of railway tracks under stationary and moving harmonic loads", Vib. Active Control, 34(3), 289-306. https://doi.org/10.1260/0263-0923.34.3.289.
  14. KR C-08090. (2014), Check for serviceability limit state of concrete track on bridge deck ends, Korea Rail Network Authority, Daejeon, Republic of Korea [in Korean].
  15. KRS TR 0014. (2020), Rail Fastening System, Korean Railway Standards (KRS), Republic of Korea [in Korean].
  16. Liu, Y. (2015), "Experimental and numerical analysis of nonlinear properties of rail fastening system", Ph.D. thesis, Paris-Est University.
  17. Luo, Y., Liu, Y. and Yin, H. (2013), "Numerical investigation of nonlinear properties of a rubber absorber in rail fastening systems", Int. J. Mech. Sci., 69, 107-113. https://doi.org/10.1016/j.ijmecsci.2013.01.034.
  18. Moelter, T. (2008), Closed and open joints for bridges on high speed lines. (Eds., Calcada, R., Delgado, R., Matos, A.C.), Bridges for high-speed railways. London.
  19. Nasarre, J. (2008), Serviceability limit states in relation to the track in railway bridges. (Eds., Calcada, R., Delgado, R., Matos, A.C.), Bridges for high-speed railways. London.
  20. Okelo, R. and Olabimtan A. (2010) Nonlinear rail-structure interaction analysis of an elevated skewed steel guideway", J. Bridge Eng., 16(3), 392-399. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000163.
  21. Oregui, M., Li, Z. and Dollevoet, R. (2015), "An investigation into the modeling of railway fastening", Int. J. Mech. Sci., 92, 1-11. https://doi.org/10.1016/j.ijmecsci.2014.11.019.
  22. Paixao, A., Fortunato, E. and Calcada, R. (2014), "Transition zones to railway bridges: Track measurements and numerical modelling", Eng. Struct., 80, 435-443. https://doi.org/10.1016/j.engstruct.2014.09.024.
  23. Sadeghi, J., Seyedkazemi, M. and Khajehdezfuly, A. (2020), "Nonlinear simulation of vertical behavior of railway fastening system", Eng. Struct., 209, 110340. https://doi.org/10.1016/j.engstruct.2020.110340.
  24. Sanudo, R., dell'Olio, L., Casado, J.A., Carrascal, I.A. and Diego, S. (2016), "Track transition in railways: A review", Constr. Build. Mater., 112, 140-157. https://doi.org/10.1016/j.conbuildmat.2016.02.084.
  25. SAP2000 (2017). CSI analysis reference manual for SAP2000, Computers and Structures, Inc.
  26. Sung, D. (2018), "Nonlinear analysis method for serviceability investigation of bridge deck ends with a concrete slab track", Adv. Civil. Eng., 2018, 6075686. https://doi.org/10.1155/2018/6075686.
  27. Sung, D. and Chang, S. (2019), "Nonlinear behavior of rail fastening system on slab track at railway bridge ends: FEA and experimental study", Eng. Struct., 195, 84-95. https://doi.org/10.1016/j.engstruct.2019.05.098.
  28. UIC (Union Internationale des Chemins de fer). (2019), High speed lines in the world, International Union of Railways, Paris, France.
  29. Vossloh, System 300 (2019), Highly elastic rail fastening for high speed and conventional rail - the established solution for slab track. Available: https://media.vossloh.com/media/01_product_finder/vfs/system_300/Vos_Produktbroschuere_Sys-300_EN.pdf [accessed 1 June 2019].
  30. Wang, H. and Markine, V. (2018), "Corrective countermeasure for track transition zones in railways: Adjustable fastener", Eng. Struct., 169, 1-14. https://doi.org/10.1016/j.engstruct.2018.05.004.
  31. Yan, B., Dai, G.L. and Hu, N. (2015), "Recent development of design and construction of short span high-speed railway bridges in China", Eng. Struct., 100, 707-717. https://doi.org/10.1016/j.engstruct.2015.06.050.
  32. Yang, S.C., Kim, H.H. and Kong, J.S. (2017), "Evaluation of uplift forces acting on fastening systems at the bridge deck end considering nonlinear behaviors of the fastening systems", J. Korean Soc. Railw., 20(4), 521-528. [in Korean]. https://doi.org/10.7782/JKSR.2017.20.4.521.
  33. Zhao, X., Li, Z. and Dollevoet, R. (2014), "Influence of the fastening modeling on the vehicle-track interaction at singular rail surface defects", J. Comput. Nonlinear Dyn., 9(3), 031002. https://doi.org/10.1115/1.4025895.