Acknowledgement
This work was supported by the Ministry of Education of the Republic of Korea and the National Research Foundation of Korea (NRF-2017S1A5A2A01024245).
References
- Attila, O.N., Agra, A., Akartunali, K., and Arulselvan, A., Robust Formulations for Economic Lot-Sizing Problem with Remanufacturing, European Journal of Operational Research, 2021, Vol. 288, No. 2, pp. 496-510. https://doi.org/10.1016/j.ejor.2020.06.016
- Baki, M.F., Chaouch, B.A., and Abdul-Kader, W., A Heuristic Solution Procedure for the Dynamic Lot Sizing Problem with Remanufacturing and Product Recovery, Computers and Operations Research, 2014, Vol. 43, pp. 225-236. https://doi.org/10.1016/j.cor.2013.10.001
- Fleischmann, M., Van Nunen, J.A., and Grave, B., Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM, Interfaces, 2003, Vol. 33. No. 6, pp. 44-56. https://doi.org/10.1287/inte.33.6.44.25189
- Garey, M.R. and Johnson, D.S., Computers and Intractability : A Guide to the Theory of NP-Completeness, W.H. Freeman & Company, New York, 1979.
- Godichaud, M. and Amodeo, L., Economic Order Quantity for Multistage Disassembly Systems, International Journal of Production Economics, 2018a, Vol. 199, pp. 16-25. https://doi.org/10.1016/j.ijpe.2018.02.008
- Godichaud, M. and Amodeo, L., EOQ Inventory Models for Disassembly Systems with Disposal and Lost Sales, International Journal of Production Research, 2018b, Vol. 57, No. 18, pp. 5685-5704. https://doi.org/10.1080/00207543.2018.1542180
- Golany, B., Yang, J. and Gang, Y., Economic Lot-Sizing with Remanufacturing Options, IIE Transactions, 2001, Vol. 33, No. 11, pp. 995-1003. https://doi.org/10.1080/07408170108936890
- Gupta, S.M. and Taleb, K.N., Scheduling Disassembly, International Journal of Production Research, 1994, Vol. 32, No. 8, pp. 1857-1866. https://doi.org/10.1080/00207549408957046
- Jeon, H.-B., Kim, J.-G., Kim, H.-J., and Lee, D.-H., A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints, International Journal of Management Science, 2006, Vol. 12, No. 1, pp. 95-112.
- Ji, X., Zhang, Z., Huang, S. and Li, L., Capacitated Disassembly Scheduling with Parts Commonality and Start-Up Cost and its Industrial Application, International Journal of Production Research, 2016, Vol. 54, No. 4, pp. 1225-1243. https://doi.org/10.1080/00207543.2015.1058536
- Kim, H.-J. and Xirouchakis, P., Capacitated Disassembly Scheduling with Random Demand, International Journal of Production Research, 2010, Vol. 48, No. 23, pp. 7177-7194. https://doi.org/10.1080/00207540903469035
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P., A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints, Journal of the Operational Research Society, 2006b, Vol. 57, pp. 1231-1240. https://doi.org/10.1057/palgrave.jors.2602094
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P., An Exact Algorithm for Two-Level Disassembly Scheduling, Journal of Korean Institute of Industrial Engineers, 2008, Vol. 34, No. 4, pp. 414-424.
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P., Disassembly scheduling : Literature Review and Future Research Directions, International Journal of Production Research, 2007, Vol. 45, pp. 4465-4484. https://doi.org/10.1080/00207540701440097
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P., Two-Phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality, International Journal of Production Research, 2006a, Vol. 44, pp. 195-212. https://doi.org/10.1080/00207540500244443
- Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Kwon, O.-K., A Branch and Bound Algorithm for Disassembly Scheduling with Assembly Product Structure, Journal of the Operational Research Society, 2009, Vol. 60, No. 3, pp. 419-430. https://doi.org/10.1057/palgrave.jors.2602568
- Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Zust, R., Disassembly Scheduling with Multiple Product Types, CIRP Annals-Manufacturing Technology, 2003, Vol. 52, No. 1, pp. 403-406. https://doi.org/10.1016/S0007-8506(07)60611-8
- Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P., Disassembly Scheduling with Capacity Constraints : Minimizing the Number of Products Disassembled, Proceedings of the Institution of Mechanical Engineers, 2006c, Vol. 220, pp. 1473-1481. https://doi.org/10.1243/09544054JEM349
- Langella, I.M., Heuristics for Demand-Driven Disassembly Planning, Computers and Operations Research, 2007, Vol. 34, No. 2, pp. 552-577. https://doi.org/10.1016/j.cor.2005.03.013
- Lee, D.-H. and Xirouchakis, P., A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure, Journal of the Operational Research Society, 2004, Vol. 55, No. 3, pp. 287-297. https://doi.org/10.1057/palgrave.jors.2601690
- Lee, D.-H., Kim, H.-J., Choi, G., and Xirouchakis, P., Disassembly Scheduling : Integer Programming Models, Proceedings of the Institution of Mechanical Engineers, Journal of Engineering Manufacture-Part B, 2004, Vol. 218, No. 10, pp. 1357-1372. https://doi.org/10.1243/0954405042323586
- Lee, D.-H., Xirouchakis, P., and Zust, R., Disassembly Scheduling with Capacity Constraints, CIRP Annals-Manufacturing Technology, 2002, Vol. 51, No. 1, pp. 387-390. https://doi.org/10.1016/S0007-8506(07)61543-1
- Neuendorf, K.-P., Lee, D.-H., Kiritsis, D., and Xirouchakis, P., Disassembly Scheduling with Parts Commonality Using Petri Nets with timestamps, Fundamenta, Informaticae, 2001, Vol. 47, pp. 295-306.
- Pan, Z., Tang, J., and Liu, O., Capacitated Dynamic Lot Sizing Problems in Closed-Loop Supply Chain, European Journal of Operational Research, 2009, Vol. 198, No. 3, pp. 810-821. https://doi.org/10.1016/j.ejor.2008.10.018
- Pineyro, P. and Viera, O., The Economic Lot-Sizing Problem with Remanufacturing and One-Way Substitution, International Journal of Production Economics, 2010, Vol. 124, No. 2, pp. 482-488. https://doi.org/10.1016/j.ijpe.2010.01.007
- Sifaleras, A., Konstantaras, I. and Mladenovic, N., Variable Neighborhood Search for the Economic lot Sizing Problem with Product Returns and Recovery, International Journal of Production Economics, 2015, Vol. 160, pp. 133-143. https://doi.org/10.1016/j.ijpe.2014.10.003
- Son, D.-H., An, S.-B., Kim, H.-J., and Jang, J.-M., Push and Pull Disassembly Quantity Models in a Reverse Supply Chain : The Case of an Automobile Disassembly System in Korea, International Journal of Logistics Research and Applications, 2021, pp. 1-26.
- Taleb, K.N. and Gupta, S.M., Disassembly of Multiple Product Structures, Computers & Industrial Engineering, 1997, Vol. 32, pp. 949-961. https://doi.org/10.1016/S0360-8352(97)00023-5
- Taleb, K.N., Gupta, S.M., and Brennan, L., Disassembly of Complex Product Structures with Parts and Materials Commonality, Production Planning and Control, 1997, Vol. 8, pp. 255-269. https://doi.org/10.1080/095372897235316
- Teunter, R.H., Bayindir, Z.P., and van den Heuvel, W., Dynamic Lot Sizing with Product Returns and Remanufacturing, International Journal of Production Research, 2006, Vol. 44, No. 20, pp. 4377-4400. https://doi.org/10.1080/00207540600693564
- Yang, J., Golany, B., and Yu, G., A Concave-Cost Production Planning Problem with Remanufacturing Options, Naval Research Logistics, 2005, Vol. 52, No. 5, pp. 443-458. https://doi.org/10.1002/nav.20089