DOI QR코드

DOI QR Code

시뮬레이션 방식을 이용한 리드 타임 개선 사례 연구

A Case Study on Lead Time Improvement Using a Simulation Approach

  • 노원주 (창원대학교 스마트제조융합협동과정) ;
  • 심재훈 (창원대학교 스마트제조융합협동과정)
  • Ro, Wonju (Department of Smart Manufacturing Engineering, Changwon National University) ;
  • Sim, Jaehun (Department of Smart Manufacturing Engineering, Changwon National University)
  • 투고 : 2021.03.09
  • 심사 : 2021.04.20
  • 발행 : 2021.06.30

초록

During the shift from gasoline vehicles to electric ones, auto parts manufacturing companies have realized the importance of improvement in the manufacturing process that does not require any layout changes nor extra investments, while maintaining their current production rate. Due to these reasons, for the auto part manufacturing company, I-company, this study has developed the simulation model of the PUSH system to conduct a process analysis in terms of production rate, WIP level, and logistics work's utilization rate. In addition, this study compares the PUSH system with other three manufacturing systems -KANBAN, DBR, and CONWIP- to compare the performance of these production systems, while satisfying the company's target production rate. With respect to lead-time, the simulation results show that the improvement of 77.90% for the KANBAN system, 40.39% for the CONWIP system, and 69.81% for the DBR system compared to the PUSH system. In addition, with respect to WIP level, the experimental results demonstrate that the improvement of 77.91% for the KANBAN system, 40.41% for the CONWIP system, and 69.82% for the DBR system compared to the PUSH system. Since the KANBAN system has the largest impacts on the reduction of the lead-time and WIP level compared to other production systems, this study recommends the KANBAN system as the proper manufacturing system of the target company. This study also shows that the proper size of moving units is four and the priority allocation of bottleneck process methods improves the target company's WIP and lead-time. Based on the results of this study, the adoption of the KANBAN system will significantly improve the production process of the target company in terms of lead-time and WIP level.

키워드

과제정보

This work(Grants No. S2897329) was supported by project for Cooperative R&D between Industry, Academy, and Research Institute funded Korea Ministry of SMEs and Startups in 20.

참고문헌

  1. Kim, B.J., Kim, D.H., Lee, I.S., and Jun, C.S., A Study on a Smart Factory Layout Design based on TOC-DBR, Journal of Korean Institute of Industrial Engineers, 2017, Vol. 43, No. 1, pp. 12-18. https://doi.org/10.7232/JKIIE.2017.43.1.012
  2. Kim, J.M. and Kim, Y.M., A Decision of the Production Control Policy using Simulation in Zinc Manufacturing Process, IE Interfaces, 2008, Vol. 21, No. 4, pp. 418-434.
  3. Kim, T.H., Na, S.H., Park, J.H., and Kang, K.S., A Study on Determining CONWIP System Model, The Korean Operations Research and Management Science Society, 1998, Vol. 1, pp. 1-4.
  4. Ko, S.G. and Kim, J.H., Implementation of DBR System with KANBAN in a Production Line of Static Demand, IE Interfaces, 2002, Vol. 15, No. 1, pp. 99-106.
  5. Koh, S.G., Implementation of DBR System in a Serial Production Line with Three Stages, Journal of the Korean Institute of Industrial Engineers, 2002, Vol. 28, No. 4, pp.3 44-350.
  6. Lee, D.G. and Kim, W.J., DBR(Drum Buffer Rope)'s Buffer Control with Applicated KANBAN System, Proceddings of the Society of Korea Industrial and Systems Engineering Fall Meeting, 2004, pp. 314-316.
  7. Lee, H. and Seo, D., Comparison of CONWIP with KANBAN in a Production Line with Constant Processing Times, The Korean Operations Research and Management Science Society, 2011, Vol. 36, No.2, pp.51-65.
  8. Lee, J.H. and Lee, J.H., The Development of the Optimal Manufacturing System Controlling Multiple Bottleneck Operation, Proceedings of Society of Korea Industrial and System Engineering Fall Conference, 2014, pp. 41-46.
  9. Park, C.W., Lee, H.S., and Kim, C.G., Performance Evaluation of a Multi-Item Production System Operated by the CONWIP Control Mechanism, Journal of the Korean Institute of Industrial Engineering, 2002, Vol. 28, No. 1, pp. 1-13.
  10. Park, S.G., Park, S.H., and Ha, C., Selection Method for Optimal Shop Floor Control According to Manufacturing Environment, Journal of the Society of Korea Industrial and Systems Engineering, 2013, Vol. 36, No. 2, pp. 81-90. https://doi.org/10.11627/jkise.2013.36.2.81
  11. Park, S.K. and Ha, J.H., Performance Comparison between Material Flow Control Mechanism Using Simulation, Journal of the Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, No. 1, pp. 115-123.
  12. Quan, G.S. and Chang, B.Y., A Simulation Study on S-Button Factory Production System, Journal of the Korean Society for Simulation, 2014, Vol. 23, No. 4, pp. 229-235. https://doi.org/10.9709/JKSS.2014.23.4.229
  13. Shim, Y.S., Byeon, J.H., Hwang, S.H., and Jeon, T.B., Job Shop System Analysis through DBR Simulation, Journal of Industrial Technology, 2011, Vol. 31, No. B, pp. 51-58.
  14. Yang, H.J., Jeong, S.K., and Yoon, S.W., An Application Method and Effect Analysis of the DBR(Drum-Buffer-Rope) Method under the Re-entrant Process, Journal of the Korea Society for Simulation, 2020, Vol. 29, No. 1, pp. 57-69. https://doi.org/10.9709/JKSS.2020.29.1.057
  15. Yoshida, A. and Park, J.H., Development of an Effective Manufacturing Scheduling System for PCB Manufacturing Line Using Dual DBR Method, Journal of the Korea Academia-Industrial Cooperation Society, 2009, Vol. 10, No. 10, pp. 2935-2944. https://doi.org/10.5762/KAIS.2009.10.10.2935