Acknowledgement
이 연구는 국토교통부 주거환경연구사업 중 "모듈러 건축 중고층화 및 생산성 향상 기술개발"과제의 지원으로 수행되었음.(과제번호: 21RERP-B082884-08)
References
- An, J. Y., Choi, J. M., Kwon, S. H., Song, D. H., & Ock, J. H. (2010). A Study on the Development of the Project Management System based on Augmented Reality, Journal of the Korea Academia-Industrial cooperation Society, 11(8), 83-93.
- Choi, O. K., Lee, H. S., Park, M. S., & Hyun, H. S. (2018). Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase, Korean Journal of Construction Engineering Management, 19(1), 43-53. https://doi.org/10.6106/KJCEM.2018.19.1.043
- Chung, J. S., Lim, S. H., Baek, C. H., & Seol, W. J. (2018). MC Design Standards and Practices for Design Standardization of Domestic Modular Housing, Journal of the Architectural Institute of Korea, 34(4), 19-25.
- Jeong, S. S., Heo, J., & Woo, S. K. (2009). Development of Building Monitoring Techniques Using Augmented Reality, Korean Journal of Construction Engineering Management, 10(6), 3-12.
- Jeon, S. Y., Park, J. H., Youn, S. B., Kim, Y. S., Lee, Y. S., & Ji, H. J. (2020). Real-time Worker Safety Management System Using Deep Learning-based Video Analysis Algorithm, Smart media journal, 9(3), 25-30. https://doi.org/10.30693/SMJ.2020.9.3.25
- Jeong, J. S., Han, S. J., & Kang, L. S. (2017). Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project, Korean Journal of Construction Engineering and Management, 18(5), 41-49. https://doi.org/10.6106/KJCEM.2017.18.5.041
- Lee, J. S., Lee, S. K., & Yang, S. I. (2019). Model Ensemble for Speed Enhancement in Object Detection, Journal of the Institute of Electronics and Information Engineers 56(6), 35-42. https://doi.org/10.5573/ieie.2019.56.6.35
- Kim, H. S., Kim, S. K., Borrmann, A, & Kang, L. S. (2018). Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site, KSCE Journal of Civil Engineering, 22(8), 2735-2746. https://doi.org/10.1007/s12205-017-0734-3
- Kim, H. Y., Ryu, K. M., Kim, K. T., Jun, Y. H., & Kim, Y. S. (2018). An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective, Korean Journal of Construction Engineering Management, 19(6). 124-134. https://doi.org/10.6106/KJCEM.2018.19.6.124
- Kim, T. Y., Park, M. S., Lee, H. S., Suh, S. W., Lee, J. H., & Kim, S. Y. (2013). Optimization Methodology of Modular Unit Factory Production Process Using DSM, Journal of the Architectural Institute of Korea, 29(6), 113-122.
- Kim, H. C., Hwang, Y. K., & Kim, K. R. (2014). Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit, Korean Journal of Construction Engineering Management, 15(1), 11-19. https://doi.org/10.6106/KJCEM.2014.15.1.011
- Lee, H. J., Lee, J. S., & Lim, J. T. (2020). Decision Making Model Using Multiple Matrix Analysis for Optimum Transportation Equipment Selection of Modular Construction, Korean Journal of Construction Engineering Management, 21(6), 84-94. https://doi.org/10.6106/KJCEM.2020.21.6.084
- Lee, J. S., Lee, S. K., & Yang, S. I. (2019). Model Ensemble for Speed Enhancement in Object Detection. Journal of the Institute of Electronics and Information Engineers, 56(6), 35-42. https://doi.org/10.5573/ieie.2019.56.6.35
- Lee, D. Y., Nam, S. H., Lee, J. S., Jung, D. I. Kim, K. R., & Cho, B. H. (2019). Factory Production Management of Modular Units Using MFD 2019, Journal of the Architectural Institute of Korea Structure & Construction, 35(6).
- Nam, S. H., & Kim, K. R. (2016). Development of Project Delivery System in Public Sector for Modular Building, Korean Journal of Construction Engineering Management, 17(4), 49-56. https://doi.org/10.6106/KJCEM.2016.17.4.049
- Nam, S. H., Park, H. G., & Kim, K. R. (2019). A Study on Development of Owner's Standard Specification Structure for Modular Building, Korean Journal of Construction Engineering Management, 20(3), 12-21. https://doi.org/10.6106/KJCEM.2019.20.3.012
- McKinse (2019). Voices on Infrastructure; Scaling Modular Construction, McKinsey & Company's Global Infrastructure Initiative
- Redmon, J., & Farhadi, A. (2018). YOLOv3: An Incremental Improvement, arXiv, 1-6.
- Shin, H. K., Kim, S. Y., & Ahn, Y. H. (2017). Decision Model of Construction Errors Management Based on Modular Method Construction Process, Korean Journal of Construction Engineering Management, 18(6), 98-108. https://doi.org/10.6106/KJCEM.2017.18.6.098
- Shin, H. K., & Ahn, Y. H. (2016). Modular Building Construction Process Development by Benchmarking International Best Practices, Korean Journal of Construction Engineering Management, 17(6), 3-12. https://doi.org/10.6106/KJCEM.2016.17.6.003
- Song, J. M., Lee, S. B., & Park, A. (2020). A Study on the Industrial Application of Image Recognition Technology, Journal of the Korea Contents Association, 20(7), 86-96. https://doi.org/10.5392/JKCA.2020.20.07.086
- Wang, Z., Zhang, Q., Yang, B., & Wu, T. (2020). Vision-Based Framework for Automatic Progress Monitoring of Precast Walls by Using Surveillance Videos during the Construction Phase, Journal of Computing in Civil Engineering, 35(1).
- Yoon, J. S., Shin, D. W., Cha, H. S., & Kim, K. R. (2017). A Study on Improvement of Modular Specifications - Focused on Technical Specifying Method in Waterproof and Mechanical Works, Korean Journal of Construction Engineering Management, 18(3), 33-41. https://doi.org/10.6106/KJCEM.2017.18.3.033