DOI QR코드

DOI QR Code

Automation for Progress Monitoring based by Vision Technology in a Modular Building Factory

영상분석 기술 기반 모듈러 건축 공장제작 공정 모니터링 자동화

  • Received : 2021.01.05
  • Accepted : 2021.03.16
  • Published : 2021.06.30

Abstract

The entire process from manufacturing in a factory to on-site assembly is running sequentially in modular building construction. Therefore, an unexpected delay in factory manufacturing would impede the overall construction schedule. Hence, the implementation of appropriate progress monitoring is essential in modular building construction. In this study, a method of vision-based progress monitoring for a modular building factory has been developed. Instead of actual images of modular unit manufacturing, videos created from 3D modeling were used to train a deep learning model. Then, videos recorded during modular manufacturing in a factory were used to test the system. Although the deep learning model was trained with the virtual model, the test results demonstrated that all six processes were successfully detected. Out of 225 image frames on average, the number of unrecognized frames was 28-53, resulting in an average recognition rate of 83.1%. The recognition accuracy of the developed progress monitoring system ranges from 62.5 to 100%, and the average value was 84.4%.

Keywords

Acknowledgement

이 연구는 국토교통부 주거환경연구사업 중 "모듈러 건축 중고층화 및 생산성 향상 기술개발"과제의 지원으로 수행되었음.(과제번호: 21RERP-B082884-08)

References

  1. An, J. Y., Choi, J. M., Kwon, S. H., Song, D. H., & Ock, J. H. (2010). A Study on the Development of the Project Management System based on Augmented Reality, Journal of the Korea Academia-Industrial cooperation Society, 11(8), 83-93.
  2. Choi, O. K., Lee, H. S., Park, M. S., & Hyun, H. S. (2018). Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase, Korean Journal of Construction Engineering Management, 19(1), 43-53. https://doi.org/10.6106/KJCEM.2018.19.1.043
  3. Chung, J. S., Lim, S. H., Baek, C. H., & Seol, W. J. (2018). MC Design Standards and Practices for Design Standardization of Domestic Modular Housing, Journal of the Architectural Institute of Korea, 34(4), 19-25.
  4. Jeong, S. S., Heo, J., & Woo, S. K. (2009). Development of Building Monitoring Techniques Using Augmented Reality, Korean Journal of Construction Engineering Management, 10(6), 3-12.
  5. Jeon, S. Y., Park, J. H., Youn, S. B., Kim, Y. S., Lee, Y. S., & Ji, H. J. (2020). Real-time Worker Safety Management System Using Deep Learning-based Video Analysis Algorithm, Smart media journal, 9(3), 25-30. https://doi.org/10.30693/SMJ.2020.9.3.25
  6. Jeong, J. S., Han, S. J., & Kang, L. S. (2017). Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project, Korean Journal of Construction Engineering and Management, 18(5), 41-49. https://doi.org/10.6106/KJCEM.2017.18.5.041
  7. Lee, J. S., Lee, S. K., & Yang, S. I. (2019). Model Ensemble for Speed Enhancement in Object Detection, Journal of the Institute of Electronics and Information Engineers 56(6), 35-42. https://doi.org/10.5573/ieie.2019.56.6.35
  8. Kim, H. S., Kim, S. K., Borrmann, A, & Kang, L. S. (2018). Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site, KSCE Journal of Civil Engineering, 22(8), 2735-2746. https://doi.org/10.1007/s12205-017-0734-3
  9. Kim, H. Y., Ryu, K. M., Kim, K. T., Jun, Y. H., & Kim, Y. S. (2018). An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective, Korean Journal of Construction Engineering Management, 19(6). 124-134. https://doi.org/10.6106/KJCEM.2018.19.6.124
  10. Kim, T. Y., Park, M. S., Lee, H. S., Suh, S. W., Lee, J. H., & Kim, S. Y. (2013). Optimization Methodology of Modular Unit Factory Production Process Using DSM, Journal of the Architectural Institute of Korea, 29(6), 113-122.
  11. Kim, H. C., Hwang, Y. K., & Kim, K. R. (2014). Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit, Korean Journal of Construction Engineering Management, 15(1), 11-19. https://doi.org/10.6106/KJCEM.2014.15.1.011
  12. Lee, H. J., Lee, J. S., & Lim, J. T. (2020). Decision Making Model Using Multiple Matrix Analysis for Optimum Transportation Equipment Selection of Modular Construction, Korean Journal of Construction Engineering Management, 21(6), 84-94. https://doi.org/10.6106/KJCEM.2020.21.6.084
  13. Lee, J. S., Lee, S. K., & Yang, S. I. (2019). Model Ensemble for Speed Enhancement in Object Detection. Journal of the Institute of Electronics and Information Engineers, 56(6), 35-42. https://doi.org/10.5573/ieie.2019.56.6.35
  14. Lee, D. Y., Nam, S. H., Lee, J. S., Jung, D. I. Kim, K. R., & Cho, B. H. (2019). Factory Production Management of Modular Units Using MFD 2019, Journal of the Architectural Institute of Korea Structure & Construction, 35(6).
  15. Nam, S. H., & Kim, K. R. (2016). Development of Project Delivery System in Public Sector for Modular Building, Korean Journal of Construction Engineering Management, 17(4), 49-56. https://doi.org/10.6106/KJCEM.2016.17.4.049
  16. Nam, S. H., Park, H. G., & Kim, K. R. (2019). A Study on Development of Owner's Standard Specification Structure for Modular Building, Korean Journal of Construction Engineering Management, 20(3), 12-21. https://doi.org/10.6106/KJCEM.2019.20.3.012
  17. McKinse (2019). Voices on Infrastructure; Scaling Modular Construction, McKinsey & Company's Global Infrastructure Initiative
  18. Redmon, J., & Farhadi, A. (2018). YOLOv3: An Incremental Improvement, arXiv, 1-6.
  19. Shin, H. K., Kim, S. Y., & Ahn, Y. H. (2017). Decision Model of Construction Errors Management Based on Modular Method Construction Process, Korean Journal of Construction Engineering Management, 18(6), 98-108. https://doi.org/10.6106/KJCEM.2017.18.6.098
  20. Shin, H. K., & Ahn, Y. H. (2016). Modular Building Construction Process Development by Benchmarking International Best Practices, Korean Journal of Construction Engineering Management, 17(6), 3-12. https://doi.org/10.6106/KJCEM.2016.17.6.003
  21. Song, J. M., Lee, S. B., & Park, A. (2020). A Study on the Industrial Application of Image Recognition Technology, Journal of the Korea Contents Association, 20(7), 86-96. https://doi.org/10.5392/JKCA.2020.20.07.086
  22. Wang, Z., Zhang, Q., Yang, B., & Wu, T. (2020). Vision-Based Framework for Automatic Progress Monitoring of Precast Walls by Using Surveillance Videos during the Construction Phase, Journal of Computing in Civil Engineering, 35(1).
  23. Yoon, J. S., Shin, D. W., Cha, H. S., & Kim, K. R. (2017). A Study on Improvement of Modular Specifications - Focused on Technical Specifying Method in Waterproof and Mechanical Works, Korean Journal of Construction Engineering Management, 18(3), 33-41. https://doi.org/10.6106/KJCEM.2017.18.3.033