참고문헌
- Ataei, A. and Zeynalian, M. (2021), "A study on structural performance of deconstructable bolted shear connectors in composite beams", Structures, 29, 519-533. 10.1016/j.istruc.2020.11.065,
- Ataei, A., Bradford, M.A. and Liu, X.P. (2016), "Experimental study of composite beams having a precast geopolymer concrete slab and deconstructable bolted shear connectors", Eng. Struct., 114, 1-13. 10.1016/j.engstruct.2015.10.041.
- Balkos, K.D., Sjaarda, M., West, J.S. and Walbridge, S. (2019), "Static and fatigue tests of steel-precast composite beam specimens with through-bolt shear connectors", J. Bridge Eng., 24(5), 04019036. 10.1061/(ASCE)BE.1943-5592.0001382.
- Chen, Y.T., Zhao, Y., West, J.S. and Walbridge, S. (2014), "Behaviour of steel-precast composite girders with through-bolt shear connectors under static loading", J. Constr. Steel Res., 103, 168-178. 10.1016/j.jcsr.2014.09.001.
- Dai, X.H., Lam, D. and Saveri, E. (2015), "Effect of Concrete Strength and Stud Collar Size to Shear Capacity of Demountable Shear Connectors", J. Struct. Eng., 141(11) 04015025. 10.1061/(ASCE)ST.1943-541X.0001267.
- Dallam, L.N. (1968), "Push out tests with high strength bolt shear connectors", Report for Missouri State Highway Department, Department of Civil Engineering, University of Missouri-Columbia (MI).
- Fan, J.S., Gou, S.K., Ding, R., Zhan, J. and Shi, Z.J. (2020), "Experimental and analytical research on the flexural behaviour of steel-ECC composite beams under negative bending moments", Eng. Struct., 210, 110309. 10.1016/j.engstruct.2020.110309.
- Han, Q.H., Xu, J., Xing, Y. and Li, Z.L. (2015), "Static push-out test on steel and recycled tire rubber-filled concrete composite beams", Steel Compos. Struct., 19(4), 843-860. https://doi.org/10.12989/scs.2015.19.4.843.
- Hardjito, D, Wallah, S.E, Sumajouw, D.M.J. and Rangan, B.V. (2005), "The stress-strain behaviour of fly ash-based geopolymer concrete", In: Development in mechanics of structures and material, The Netherlands: A Balkema Publishers. 831-834.
- Kwon, G., Engelhardt, M.D. and Kli1ngner, R.E. (2010), "Behavior of post-installed shear connectors under static and fatigue loading", Steel Constr., 66(4), 532-541. 10.1016/j.jcsr.2009.09.012.
- Lee, J. and Fenves, G.L. (1998), "Plastic-damage model for cyclic loading of concrete structures", J. Eng. Mech., 124, 892-900. 10.1061/(ASCE)0733-9399(1998)124:8(892).
- Liu, J., Ding, F.X., Liu, X.M. and Yu, Z.W. (2016), "Study on flexural capacity of simply supported steel-concrete composite beam", Steel Compos. Struct., 21(4), 829-847. https://doi.org/10.12989/scs.2016.21.4.829.
- Liu, X.P., Bradford, M.A. and Ataei, A. (2017), "Flexural performance of innovative sustainable composite steel-concrete beams", Eng. Struct., 130, 282-296. 10.1016/j.engstruct.2016.10.009.
- Loh, H.Y., Uy, B. and Bradford, M.A. (2006), "The effects of partial shear connection in composite flush end plate joints Part II-Analytical study and design appraisal", J. Constr. Steel Res., 62(4), 391-412. https://doi.org/10.1016/j.jcsr.2005.07.010
- Marshall, W.T., Nelson, H.M. and Banerjee, H.K. (1971), "An experimental study of the use of high-strength friction-grip bolts as shear connectors in composite beams", Struct. Eng., 49, 171-178.
- Nie, J.G., Tang, L. and Cai, C.S. (2009), "Performance of Steel-Concrete Composite Beams under Combined Bending and Torsion", J. Struct. Eng., 135, 1048-1057. 10.1061/ASCEST.1943-541X.0000042
- Pathirana, S.W., Uy, B., Mirza, O. and Zhu, X.Q. (2016), "Flexural behaviour of composite steel-concrete beams utilising blind bolt shear connectors", Eng. Struct., 114, 181-194 10.1016/j.engstruct.2016.01.057.
- Pavlovic, M., Markovic, Z., Veljkovic, M. and Budevac, D. (2013), "Bolted shear connectors vs. headed studs behaviour in push-out tests", J. Constr. Steel Res., 88(9), 134-149. 10.1016/j.jcsr.2013.05.003.
- Rehman, N., Lam, D., Dai, X. and Ashour, A.F. (2016), "Experimental study on demountable shear connectors in composite slabs with profiled decking", J. Constr. Steel Res., 122, 178-189. 10.1016/j.jcsr.2016.03.021.
- Sheehan, T., Dai, X.H. and Lam, D. (2018), "Flexural behaviour of asymmetric composite beam with low degree of shear connection", J. Constr. Steel Res., 141, 251-261. 10.1016/j.jcsr.2017.11.018.
- Shi, G., Shi, Y.J., Wang, Y.Q. and Bradford, M.A. (2008), "Numerical simulation of steel pretensioned bolted end-plate connections of different types and details", Eng. Struct., 30, 2677-2686. 10.1016/j.engstruct.2008.02.013.
- Suwaed A.S.H. and Suwaed Karavasilis, T.L. (2018), "Removable shear connector for steel-concrete composite bridges", Steel Compos. Struct., 29(1), 107-123. https://doi.org/10.12989/scs.2018.29.1.107
- Tan E. L., Varsani H., and Liao F. Y. (2019), "Experimental study on demountable steel-concrete connectors subjected to combined shear and tension" Eng. Struct., 183 110-123. 10.1016/j.engstruct.2018.12.088.
- Wang, Y.H., Yu, J., Liu, J.P. and Chen, Y.F. (2019), "Shear behavior of shear stud groups in precast concrete decks", Eng. Struct., 187, 73-84. 10.1016/j.engstruct.2019.02.002.
- Yang, T., Liu, S.Y., Qin, B.X. and Liu, Y.Q. (2020), "Experimental study on multi-bolt shear connectors of prefabricated steel-concrete composite beams", J. Constr. Steel Res., 173, 106260. 10.1016/j.jcsr.2020.106260.
- Zhang, Y.J., Chen, B.C., Liu, A.R., Pi, Y. L., Zhang, J.P., Wang, Y. and Zhong, L.C. (2019), "Experimental study on shear behavior of high strength bolt connection in prefabricated steel-concrete composite beam", Compos. Part B-Eng., 159, 481-489. 10.1016/j.compositesb.2018.10.007.
- Zhao, W., Lu, S.Q. and Jing, X.Y. (2020), "Shear performance of high-strength bolt connector considering different pad and bolt hole", Structures, 28, 1291-1300. 10.1016/j.istruc.2020.09.050.
피인용 문헌
- Hybrid Krill Herd-ANN Model for Prediction Strength and Stiffness of Bolted Connections vol.11, pp.6, 2021, https://doi.org/10.3390/buildings11060229