과제정보
본 연구는 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 20ORPS-B158109-01).
참고문헌
- Akagi, K., Murayama, K., Yoshida, M., and Kawahata, J. (2002). "Modularization technology in power plant construction." Proceedings of ICONE10 10th International Conference on Nuclear Engineering, Arlington, pp. 21-27.
- Ahn, Y.H. (2019). "Technical status and development direction of modular construction method in Korea." KAIA Insight, 14.
- Arashpour, M., Bai, Y., Aranda-mena, G., Bab-Hadiashar, A., Hosseini, M.R., and Kalutara, P. (2017). "Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in offsite construction." Automation in Construction, 84, pp. 146-153. https://doi.org/10.1016/j.autcon.2017.08.032
- Arif, M., and Egbu, C. (2010). "Making a case for offsite construction in China." Engineering Construction and Architectural Management, 17(6), pp. 536-548. https://doi.org/10.1108/09699981011090170
- Azam Haron, N., Abdul-Rahman, H., Wang, C., and Wood, L.C. (2015). "Quality function deployment modelling to enhance industrialised building system adoption in housing projects." Total Qual. Manag. Bus. Excell., 26, pp. 703-718. https://doi.org/10.1080/14783363.2014.880626
- Azhar, S., Lukkad, M.Y., and Ahmad, I. (2013). "An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique." International Journal of Construction Education and Research, 9(3), pp. 203-225. https://doi.org/10.1080/15578771.2012.723115
- Babic, N.C., Podbreznik, P., and Rebolj, D. (2010). "Integrating resource production and construction using BIM." Automation in Construction, 19, pp. 539-543. https://doi.org/10.1016/j.autcon.2009.11.005
- Barlow, J., Childerhouse, P., Gann, D., Hong-Minh, S., Naim, M., and Ozaki, R. (2003). "Choice and delivery in housebuilding: Lessons from Japan for UK housebuilders." Building Research and Information, 31(2), pp. 134-145. https://doi.org/10.1080/09613210302003
- Benjaoran, V., and Dawood, N. (2006). "Intelligence approach to production planning system for bespoke precast concrete products." Automation in Construction, 15(6), pp. 737-745. https://doi.org/10.1016/j.autcon.2005.09.007
- Blismas, N.G. (2007). "Off-site manufacture in Australia: current state and future directions." Cooperative Research Centre for Construction Innovation for Icon. Net Pty Ltd: Brisbane, Australia.
- Blismas, N.G., Pasquire, C., and Gibb, A.G.F. (2006). "Benefit evaluation for off-site production in construction." Construction Management and Economics, 24(2), pp. 121-130. https://doi.org/10.1080/01446190500184444
- Blismas, N.G., and Wakefield, R. (2009). "Drivers, constraints and the future of offsite manufacture in Australia." Constr Innov, 9(1), pp. 72-83. https://doi.org/10.1108/14714170910931552
- BSRIA. (1998). Prefabrication and Preassembly - applying the technique to building engineering services In Advance Construction Technique ACT 1/99 (Ed. Wilson, D. G., Smith, M. H. and Deal, J.) Department of Environment Transport Region (DETR) and the Building Services Research and InformatFactors affecting large scale modular construction projecion Association (BSRIA).
- Carriker, M., and Langar, S. (2014). "Factors Affecting Large Scale Modular Construction Projects." 50th ASC annual international conference proceedings. pp. 1-8.
- Chan, A., Scott, D., and Chan, A. (2004). "Factors affecting the success of a construction project." J. Constr. Eng. Manag., 130, pp. 153-155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)
- Cheng, Y.M. (2014). "An exploration into cost-influencing factors on construction projects." Int. J. Proj. Manag., 32, pp. 850-860. https://doi.org/10.1016/j.ijproman.2013.10.003
- Chiang, Y.H., Chan, E.H.W., and Lok, L.K.L. (2006). "Prefabrication and barriers to entry-a case study of public housing and institutional buildings in Hong Kong." Habitat Int., 30, pp. 482-499. https://doi.org/10.1016/j.habitatint.2004.12.004
- Choi, J.O. (2014). "Links between modularization critical success factors and project performance." Austin, TX, United States: The University of Texas at Austin.
- Choi, J. O., and O'Connor, J.T. (2014). "Modularization critical success factors accomplishment: Learning from case studies." Construction Research Congress, pp. 1636-1645.
- Choi, J.O., O'Connor, J.T., and Kim, T.W. (2016). "Recipes for cost and schedule successes in industrial modular projects: qualitative comparative analysis." J Constr Eng Manage., 142(10).
- Demiralp, G., Guven, G., and Ergen, E. (2012). "Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components." Automation in Construction, 24, pp. 120-129. https://doi.org/10.1016/j.autcon.2012.02.005
- Ergen, E., and Akinci, B. (2008). "Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains." J. Constr. Eng. Manag., 134, pp. 112-121. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(112)
- Ergen, E., Akinci, B., and Sacks, R. (2007). "Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS." Automation in Construction, 16, pp. 354-367. https://doi.org/10.1016/j.autcon.2006.07.004
- Faniran, O.O., Oluwoye, J.O., and Lenard, D.J. (1998). "Interaction between construction planning and influence factors." J. Constr. Eng. Manag., 124, pp. 245-256. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(245)
- Gibb, A.G.F. (1999). Off-site fabrication: Prefabrication, preassembly and modularization (1st ed.). Latheronwheel: Whittles Publishing. doi:10.1680/bimpp.63693.109
- Gibb, A.G0F. (2001). "Standardization and pre-assembly-distinguishing myth from reality using case study research." Constr Manage Econ., 19(3), pp. 307-315. https://doi.org/10.1080/01446190010020435
- Gibb, A.G.F., and Isack, F. (2001). "Client drivers for construction projects." Eng Const Arch Man., 8(1), pp. 46-58. https://doi.org/10.1108/eb021169
- Gibb, A.G.F., and Isack, F. (2003). "Re-engineering through preassembly: Client expectations and drivers." Building Research and Information, 31(2), pp. 146-160. https://doi.org/10.1080/09613210302000
- Goulding, J.S., Pour Rahimian, F., Arif, M., and Sharp, M.D. (2015). "New offsite production and business models in construction: Priorities for the future research agenda." Archit. Eng. Des. Manag., 11, pp. 163-184. https://doi.org/10.1080/17452007.2014.891501
- Haas, C.T., and Fagerlund, W.R. (2002). Preliminary research on prefabrication, pre-assembly, modularization and offsite fabrication in construction. Austin, TX. Retrieved from https://smartech.gatech.edu/handle/1853/10883
- Haas, C.T., O'Connor, J.T., Tucker, R.L., Eickmann, J.A., and Fagerlund, R.W. (2000). Prefabrication and preassembly trends and effects on the construction workforce. Report No. 10, Center for Construction Industry Studies, University of Texas at Austin, Austin.
- Hassim, S., Jaafar, M.S., and Sazali, S.A.A.H. (2009). "The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia American." Journal of Applied Sciences, 6(5), pp. 937-942
- Haller, M., Lu, W., Stehn, L., and Jansson, G. (2015). "An indicator for superfluous iteration in offsite building design processes." Archit. Eng. Des. Manag., 11, pp. 360-375. https://doi.org/10.1080/17452007.2014.937793
- Heravi, A., Coffey, V., and Trigunarsyah, B. (2015). "Evaluating the level of stakeholder involvement during the project planning processes of building projects." Int. J. Proj. Manag., 33, pp. 985-997. https://doi.org/10.1016/j.ijproman.2014.12.007
- Hjort, B., Lindgren, J., Larsson, B., and Emmitt, S. (2014). Success factors Related to industrialized building inSweden. Paper presented at the CIB international conference on construction in a changing world (pp. 1-13). Kandalana: School of the Built Environment, University of Salford.
- Hofman, E., Voordijk, H., and Halman, J. (2009). "Matching supply networks to a modular product architecture in the house-building industry." Building Research and Information, 37(1), pp. 31-42. https://doi.org/10.1080/09613210802628003
- Housing Forum. (2002). Homing in on excellence - A commentary on the use of offsite fabrication (OSF) methods for the UK housebuilding industry, The Housing Forum, London, pp. 1-79
- Hsu, P.Y., Angeloudis, P., and Aurisicchio, M. (2018). "Optimal logistics planning for modular construction using two-stage stochastic programming." Automation in Construction, 94, pp. 47-61. https://doi.org/10.1016/j.autcon.2018.05.029
- Hwang, B.G., Shan, M., and Looi, K.Y. (2018). "Knowledge-based decision support system for prefabricated prefinished volumetric construction." Autom Constr., 94(July), pp. 168-178. https://doi.org/10.1016/j.autcon.2018.06.016
- Ismail, F., Yusuwan, N.M., and Baharuddin, H.E.A. (2012). "Management factors for successful IBS projects implementation." Procedia - Social and Behavioral Sciences, 68, pp. 99-107. https://doi.org/10.1016/j.sbspro.2012.12.210
- Jabar, I.L., Ismail, F., Aziz, N.M., and Janipha, N.A.I. (2013). "Construction Manager's Competency in Managing the Construction Process of IBS Projects." Procedia Soc. Behav. Sci. 105, pp. 85-93. https://doi.org/10.1016/j.sbspro.2013.11.010
- Jaillon, L., and Poon, C.S. (2009). "The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector." Autom. Constr., 18, pp. 239-248. https://doi.org/10.1016/j.autcon.2008.09.002
- Jeong, Y.S., Eastman, C.M., Sacks, R., and Kaner, I. (2009). "Benchmark tests for BIM data exchanges of precast concrete." Autom. Constr. 18, pp. 469-484. https://doi.org/10.1016/j.autcon.2008.11.001
- Kamar, K.A.M., Alshawi, M., and Hamid, Z.A. (2009). "Industrialised building system: The critical success factors." 9th international postgraduate research conference (IPGRC), pp. 485-497.
- Kamar, K.A.M., Azman M.N.A., and Nawi M.N.M. (2014). "IBS Survey 2010: Drivers, Barriers and Critical Success Factors in Adopting Industrialised Building System (IBS) Construction bt G7 Contractors in Malaysia." Journal of Engineering Science and Technology, 9(4), pp. 490-501.
- Kamar, K.A.M., Hamid, Z.A., and Alshawi, M. (2010). "The critical success factors (CSFs) to the implementation of industrialized building system (IBS) in Malaysia." TG57 - special track, 18th CIB world building congress, pp. 64-76.
- Kim, D.S., Kim, K.R., Cha, H.S., and Shin, D.W. (2013). "A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type." Korean Journal of Construction Engineering and Management, KICEM. 14(5), pp. 164-174. https://doi.org/10.6106/KJCEM.2013.14.5.164
- Kim, M.K., Ioannis, B., and An, Y.K. (2015). "A study on influencing factors and revitalization of the adoption of off-site construction - Case study on the construction market of the United Kingdom." Journal of KIBIM, 5(3), pp. 33-40. https://doi.org/10.13161/kibim.2015.5.3.033
- Kim, J.S. (2020). Modular Architecture in Global Markets analyzed by McKinsey - 1, RICON, www.ricon.re.kr/foreign_view.html?bn=23&seq=4705
- Ko, C. (2010). "An integrated framework for reducing precast fabrication inventory." J. Civ. Eng. Manag., 16, pp. 418-42. https://doi.org/10.3846/jcem.2010.48
- Lau, A.K.W. (2011). "Critical success factors in managing modular production design: Six company case studies in Hong Kong, China, and Singapore." Journal of Engineering and Technology Management, 28(3), pp. 168-183. https://doi.org/10.1016/j.jengtecman.2011.03.004
- Lee, J.H., and Hwang, E.K. (2019). "An Analysis of Overseas Systems for Activation of the Industrialized Housing Accreditation System." The International Journal of The Korea Institute of Ecological Architecture and Environment, 19(6), pp. 49-55.
- Lee, J.S., and Kim, Y.S. (2017). "Analysis of cost-increasing risk factors in modular construction in Korea using FMEA." KSCE Journal of Civil Engineering, 21(6), 1999-2010. https://doi.org/10.1007/s12205-016-0194-1
- Lessing, J., and Brege S. (2018). "Industrialized building companies' business models: multiple case study of Swedish and North American companies." J. Constr Eng Manage., 144(2), 05017019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001368
- Lessing, J., Stehn, L., and Ekholm, A. (2005). "Industrialised housing: Definition and categorisation of the concept." Proceedings of the in the 13th annual conference in the international group for lean construction, pp. 471-480.
- Li, C.Z., Hong, J., Xue, F., Shen, G.Q., Xu, X., and Mok, M.K. (2016). "Schedule risks in prefabrication housing production in Hong Kong: A social network analysis." Journal of Cleaner Production, 134(Part B), pp. 482-494. https://doi.org/10.1016/j.jclepro.2016.02.123
- Li, C.Z., Xue, F., Li, X., Hong, J., and Shen, G.Q. (2018). "An internet of things-enabled BIM platform for onsite assembly services in prefabricated construction." Automation in Construction, 89, pp. 146-161. https://doi.org/10.1016/j.autcon.2018.01.001
- Liu, H., Al-Hussein, M., and Lu, M. (2015). "BIM-based integrated approach for detailed construction scheduling under resource constraints." Autom. Constr., 53, pp. 29-43. https://doi.org/10.1016/j.autcon.2015.03.008
- Li, L., Li, Z., Wu, G., and Li, X. (2018). "Critical success factors for project planning and control in prefabrication housing production: A China study." Sustainability (Switzerland), 10(3), pp, 836-817. https://doi.org/10.3390/su10030836
- Lu, W., and Yuan, H. (2013). "Investigating waste reduction potential in the upstream processes of offshore prefabrication construction." Renew. Sustain. Energy Rev. 28, pp. 804-811. https://doi.org/10.1016/j.rser.2013.08.048
- Lu, Y., Li, Y., Skibniewski, M.J., Wu, Z., Wang, R., and Le, Y. (2014). "Information and Communication Technology Applications in Architecture, Engineering, and Construction Organizations: A 15-Year Review." J. Manag. Eng., 31, pp. 1-19.
- Malik, N.A.F. (2006). Supply Chain Management in IBS Industry in Malaysian. International IBS Exhibition (MIIE) 2006 Construction Industry Development Board (CIDB) Malaysia, Kuala Lumpur.
- Mao, C., Shen, Q., Pan, W., and Ye, K. (2015). Major Barriers to Off-Site Construction: The Developer's Perspective in China. J. Manag. Eng., 31.
- Marchesi, M., and Matt, D.T. (2017). Design for mass customization: Rethinking prefabricated housing using axiomatic design. Journal of Architectural Engineering, 23(3). https://doi.org/10.1061/(ASCE)AE.1943-5568.0000242
- Mole, T. (2001). Prefabrication in UK Housing: 'Innovation or Deja Vu' in CEEC/AEEBC Conference Dublin, Ireland 4th-6th October 2001.
- Mun, Y.A., Kim, Y.A., and Park, M.J. (2013). "Domestic and Foreign Case Studies for the Improvement of Unit Modular Housing." Journal of the Architectural Institute of Korea, Planning & Design, 29(10), pp. 65-73. https://doi.org/10.5659/JAIK_PD.2013.29.10.65
- Murtaza, M.B., Fisher, D.J., and Skibniewski, M.J. (1993). "Knowledgment-based approach to modular construction decision support." J. Constr Eng Manag., 119(1), pp. 115-130. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(115)
- Mydin, M.A.O., Nawi, M.N.M., Yunos, M.Y.M., and Utaberta, N. (2015). "Decisive success factors in executing prefabrication system in Malaysia." Australian Journal of Basic and Applied Sciences, 9(97), pp. 160-163.
- Nadim, W., and Goulding, J.S. (2011). "Offsite production: A model for building down barriers: A European construction industry perspective." Eng. Constr. Archit. Manag., 18, pp. 82-101. https://doi.org/10.1108/09699981111098702
- Na, L., and Liska, R.W. (2008). "Designers and General Contractors Perceptions of Offsite Construction Techniques in the United State Construction Industry." International Journal of Construction Education and Research, 4(3), pp. 177-188. https://doi.org/10.1080/15578770802494565
- National Audit Office Report (2005). Using modern methods of construction to build homes more quickly and efficiently, National Audit Office (NAO), London, November 2005.
- Nawi, M.N.M., Lee, A., Kamar, K.A.M., and Hamid, Z.A. (2012). "Critical success factors for improving team integration in industrialised building system (IBS) construction projects: The Malaysian case." Malaysian Construction Research Journal, 10(1), pp. 44-62.
- Neala, R., Price, A., and Suer, W. (1993). Prefabricated modules in construction, Bourn Press Limited, Bournemouth.
- O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2014). Critical success factors and enablers for optimum and maximum industrial modularizationm, Journal of Construction Engineering and Management, 140(6).
- O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2015). "Standardization strategy for modular industrial plants." J. Constr Eng Manage., 141(9), 04015026. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001001
- O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2016). "Industrial project execution planning: modularization versus stick-built." Pract Period Struct Des Constr., 21(1), 04015014. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000270
- Olawale, Y., Sun, M., and PCIM. (2013). "Project Control and Inhibiting-Factors Management Model." J. Manag. Eng., 29, pp. 60-70. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000125
- Ojoko, E.O., Osman, M.H., Abdul Rahman, A.B., and Bakhary, N. (2018). "Evaluating the critical success factors of industrialised building system implementation in Nigeria: The stakeholders' perception." International Journal of Built Environment and Sustainability, 5(2), pp. 127-133.
- Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2007). "Perspective of UK housebuilders on the use of offsite modern methods of construction." Constr Manage Econ., 25(2), pp. 183-194. https://doi.org/10.1080/01446190600827058
- Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2008). "Leading UK housebuilders' utilization of offsite construction methods." Building Research and Information, 36(1), pp. 56-67. https://doi.org/10.1080/09613210701204013
- Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2012). "Strategies for integrating the use of off-site production technologies in house building." J. Constr Eng Manage., 138(11), pp. 1331-1340. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000544
- Park, J.W., Jun, Y.J., Park, S.H., and Kwon, O.K. (2011)."A Study of Deriving Critical Success Factors in Construction Projects." Proceedings of the KSCE, pp. 381-384.
- Pheng, L.S., and Chuan, C.J. (2001). "Just-in-Time Management of Precast Concrete Components." J. Constr. Eng. Manag., 127, pp. 494-501. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(494)
- Presidential Commission on Architecture Policy. (2015). A Study on the Revitalization of Off-Site Construction, (2015-04).
- Puddicombe, M.S. (2006). "The Limitations of Planning: The Importance of Learning." J. Constr. Eng. Manag., 132, pp. 949-955. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:9(949)
- Rashidi, A., and Ibrahim, R. (2017). "Industrialized construction chronology: The disputes and success factors for a resilient construction industry in Malaysia." The Open Construction and Building Technology Journal, 11(1), pp. 286-300. https://doi.org/10.2174/1874836801711010286
- Rentschler, C., Mulrooney, M., and Shahani, G. (2016). "Modularization: The key to success in today's market." Hydrocarbon Processing, 95(12), pp. 27-30.
- Sanderson, G. (2003). A strategic review of the use of modern methods of construction in new-build and refurbishment housing projects, Richard Hodkinson Consultancy Report, October 2003.
- Sharafi, P., Rashidi, M., Samali, B., Ronagh, H., and Mortazavi, M. (2018). "Identification of factors and decision analysis of the level of modularization in building construction." Journal of Architectural Engineering, 24(2), 04018010. https://doi.org/10.1061/(asce)ae.1943-5568.0000313
- Song, J., Fagerlund, W.R., Haas, C.T., Tatum, C.B., and Vanegas, J.A. (2005). "Considering prework on industrial projects." J. Constr Eng Manage., 131(6), pp. 723-733. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(723)
- Tam, V.W.Y., Tam, C.M., and Ng, W.C.Y. (2007). "On prefabrication implementation for different project types and procurement methods in Hong Kong." J. Eng. Design Tech., 5(1), pp. 68-80. https://doi.org/10.1108/17260530710746614
- Tam, V.W.Y., Fung, I.W.H., Sing, M.C.P., and Ogunlana, S.O. (2015). "Best practice of prefabrication implementation in the Hong Kong public and private sectors." Journal of Cleaner Production, 109, pp. 216-231. https://doi.org/10.1016/j.jclepro.2014.09.045
- Thanoon, W.A., Peng, L.W., Kadir, M.R.A., Jaafar, M.S., and Salit, M.S. (2003). The Essential Characteristics of Industrialised Building System In International Conference on Industrialised Building Systems Construction Industry Development Board (CIDB) Malaysia, Kuala Lumpur, Malaysia, 10-11 September 2003.
- Tommelein, I.D. (2015). "Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry." J. Constr. Eng. Manag., 141, pp. 1-12. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000926
- Toor, S.U.R., and Ogunlana, S.O. (2009). "Construction professionals' perception of critical success factors for largescale construction projects." Construction Innovation, 9(2), pp. 149-167. https://doi.org/10.1108/14714170910950803
- Triumph Modular Corporation. (2019). Critical success factors for volumetric modular construction. Littleton: Triumph Modular. Retrieved from https://triumphmodular.com/permanent-modular/how-to-start/critical-success-factors/
- Vrijhoef, R., Cuperus,, Y., Voordijk, H. (2002). Exploring the Connection between Open Building and Lean Construction: Defining a Postponement Strategy for Supply Chain Management in Proceedings IGLC-10 Gramado, Brazil, August 2002.
- Wang, C., Liu, M., Asce, A.M., Hsiang, S.M., Leming, M.L., and Asce, M. (2013). "Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility." J. Constr. Eng. Manag., 138, pp. 1-12. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000390
- Warszawski, A. (1999). Industrialization and Automated building systems (2nd ed.). London: E & FN Spon.
- Wong, P.S.P., Whelan, B., and Holdsworth, S. (2018). "Are contractors ready for greater use of prefabrication in projects? An empirical analysis on the role of unlearning and counter-knowledge." International Journal of Construction Management, pp. 1-16.
- Wuni, I.Y., and Shen, G.Q. (2019). "Critical success factors for modular integrated construction projects: a review." Build Res Inform., pp. 1-22.
- Wuni, I.Y., and Shen, G.Q. (2020). "Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle." Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. https://doi.org/10.1108/ECAM-10-2019-0534
- Wuni, I.Y., Shen, G.Q., and Osei-Kyei, R. (2020). Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects, International Journal of Construction Management. May 2020.
- Wu, P., and Low, S.P. (2014). "Barriers to achieving green precast concrete stock management-A survey of current stock management practices in Singapore." Int. J. Constr. Manag., 14, pp. 78-89. https://doi.org/10.1080/15623599.2014.899126
- Wu, P., Low, S.P., and Jin, X. (2013). "Identification of non-value adding (NVA) activities in precast concrete installation sites to achieve low-carbon installation. Resour." Conserv. Recycl., 81, pp. 60-70. https://doi.org/10.1016/j.resconrec.2013.09.013
- Xue, H., Zhang, S., Su, Y., and Wu, Z. (2017). "Factors affecting the capital cost of prefabrication - a case study of China." Sustainability, 9(9), pp. 1-22.
- Xue, X., Shen, Q., and Ren, Z. (2010). "Critical review of collaborative working in construction projects: Business environment and human behaviors." J. Manag. Eng., 26, pp. 196-208. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000025
- Yu, I.H. (2019). "A Study on the Changes and Development of Specialized Construction Industry in OSC Industry." Construction Engineering and Management, KICEM, 20(5), pp. 12-18.
- Yunus R., Noor S.R.M., Abdullah A.H., Nagapan S., Hamid A.R.A., Tajudin S.A.A., and Jusof S.R.M. (2017). "Critical Success Factors for Lean Thinking in the Application of Industrialised Building System (IBS)." IOP Conference Series: Materials Science and Engineering, 226, pp. 6-7.
- Zhang, X., Skitmore, M., and Peng, Y. (2014). "Exploring the challenges to industrialized residential building in China." Habitat Int., 41, pp. 176-184. https://doi.org/10.1016/j.habitatint.2013.08.005
- Zhai, X., Reed, R., and Mills A. (2013). "Factors impeding the offsite production of housing construction in China: an investigation of current practice." Construction Management and Economics, 17(10).
- Zhao, X., Hwang, B.G., and Low, S.P. (2013). "Critical success factors for enterprise risk management in Chinese construction companies." Constr. Manag. Econ., 31, pp. 1199-1214. https://doi.org/10.1080/01446193.2013.867521
- Zhong, R.Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., and Huang, G.Q. (2017). "Prefabricated construction enabled by the internet-of-things." Automation in Construction, 76, pp. 59-70. https://doi.org/10.1016/j.autcon.2017.01.006