DOI QR코드

DOI QR Code

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing

공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발

  • Jeong, Eunbeen (Department of Architectural Engineering, Graduate School, Incheon National University) ;
  • Koo, Choongwan (Division of Architecture and Urban Design, Incheon National University) ;
  • Kim, Taewan (Division of Architecture and Urban Design, Incheon National University) ;
  • Lee, Chansik (Division of Architecture and Urban Design, Incheon National University)
  • Received : 2020.12.01
  • Accepted : 2020.12.28
  • Published : 2021.03.31

Abstract

The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

공동주택 주차장 리모델링 공사비는 전체 리모델링 공사비의 대략 20%를 차지한다. 지하주차장 공사비를 알면 전체 공사비 예측이 가능한 것이다. 공사비 산정 시 참고하는 표준품셈은 리모델링 공사비 산정에 적용하기 곤란하여 리모델링 공사의 특징을 반영할 수 있는 공사비 산정 모델이 필요하다. 이 연구에서는 리모델링의 특징 및 설계 요소를 반영하여 개략 공사비를 산정하는 공동주택 지하주차장 확대 리모델링의 개략 공사비 산정 모델을 개발하였다. 선행 연구 고찰 및 전문가 자문을 통해 지하주차장 리모델링 공사의 Activity를 37개 도출하였다. 리모델링 설계도면이 확정되기 전 개략 공사비를 산정할 수 있도록 Activity 별 물량 산출식 및 단가를 제시하였다. 전문가 자문을 통해 공사비 상승에 영향을 미치는 요인 13개와 요인 별 가중치를 결정하였다. 리모델링 사례단지 3개를 개략 공사비 산정 모델에 적용한 결과, 정확도는 평균 93%로 나타났다.

Keywords

References

  1. An, S.H., and Kang, K.I. (2005). "A Study on the Cost Model of Underground Parking Lot of Apartment Housing Projects in the Early Stage." Journal of the Architectural Institute of Korea Structure & Construction, JAIK-SC, 21(5), pp. 135-142.
  2. Choi, J.P., Park, Y.S., Ryu, J.W., and Choi, Y.J. (2008). "Case Study of Apartment Remodeling by Occupant's Questionnaire Survey." Journal of the Architectural Institute of Korea Planning & Design, JAIK-PD, 24(5), pp. 31-40.
  3. Choi, J.W., Jeong, E.B., Park, S.P., Kim, T.W., and Lee, C.S. (2019). "Development of Expansion Work Breakdown Structure for Underground Parking Lots in Aged Apartment Housing." Proceedings of the 2019 AIK Conference, Daejeon, KOREA.
  4. Customized Remodeling Item for Aged Apartment (2013). Korea Land and Housing Corporation, LH Research Report, 2013-10.
  5. Han, T.H. (2015). "Evaluating the efficiency and feasibility of parking lot expansion types for remodeling of deteriorated apartment." MS thesis, Seoul National Univ., Seoul.
  6. Han, T.H., and Choi, M.J. (2014). "A Study on the Types and Performance of Parking Space Expansion through Remodeling of Deteriorated Apartment." Proceedings of the 2014 KAHPS Conference, Seoul, KOREA.
  7. Jung, S.J., Kim, J.H., Lee, B.H., Hwang, K.S., and Seo, S.Y. (2018). "Establishment of a Technology for Earthwork Safety at New Construction/Extension of Underground Parking Lot in Building." Proceedings of the 2018 KCI Conference, Pyeongchang, KOREA.
  8. Kim, D.J., Park, C.K., and Kim, H.J. (2012). "A Study on the Expansion for the Parking Lots in Deteriorated Apartments." Journal of the Architectural Institute of Korea Planning & Design, JAIK-PD, 28(2), pp. 159-167.
  9. Kim, I.G., Kim, H.I., and Lee, S.H. (2009). "A Study on the Factors and Elements Effecting Parking Area Expansion Plans in Apartment Complexes Remodeling." Journal of the Architectural Institute of Korea Structure & Construction, JAIK-SC, 25(6), pp. 51-58.
  10. Kim, J. (2018). "Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements." MS thesis, Ajou Univ., Kyonggi.
  11. Kim, J., and Cha, H.S. (2018). "Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements." Korean Journal of Construction Engineering and Management, KICEM, 19(6), pp. 65-78. https://doi.org/10.6106/KJCEM.2018.19.6.065
  12. Kim, K.R. (2002). Modern Architecture Process Management Studies; Gimundang, Korea, pp. 1-256.
  13. Korea Land & Housing Corporation. (2007).
  14. Lee, E.J., Hyun, C.H., and Hyun, C.G. (2010). "A Case Study on the Safety Diagnosis of Daechi hyundai Apartment Remodeling." Journal of the Korea Institute for Structural Maintenance and Inspection, KSMI, 14(5), pp. 35-41.
  15. Lee, J.S., and Bing, C.M. (2012). "Cheongdam Cheonggu Apartment Remodeling Construction." Journal of the Korea Institute of Building Construction, JKIBC, 12(6), pp. 42-51. https://doi.org/10.5345/JKIBC.2012.12.1.042
  16. Lee, K. (2016). "Remodeling and cost." Korea Remodeling Association, pp. 49-51.
  17. Park, J.G. (2009), "Development of Checklist for Expansion of Parking Lot in Aged Apartment." MS thesis, Incheon National Univ., Incheon.
  18. Park, J.G., and Lee, C.S. (2008). "Preliminary Checklist For Vertical Extension of Elevator in Apartment Buildings." Proceedings of the 2008 KICEM Conference, Seoul, KOREA.
  19. Park, S.P., Youn, B.H., Choi, J.W., Kim, T.W., and Lee, C.S. (2018). "Development of Technology Tree for Method of Entry to Expand the Underground Parking Lot of the Apartment." Proceedings of the 2018 KICEM Conference, Seoul, KOREA.
  20. Shin, M.H. (2017). "Selection of the Aged Apartment Parking Lot Expansion Types Considering Economic Feasibility." MS thesis, Incheon National Univ., Incheon.
  21. Song, N.H. (2009). "The Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot." MS thesis, Incheon National Univ., Incheon.
  22. Song, N.H., Jung, I.S., and Lee, C.S. (2009). "The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot." Korean Journal of Construction Engineering and Management, KICEM, 10(2), pp. 65-74.
  23. Whang, K.J. (2008). "A Decision Making Model for Selection Method of Parking Lot Expansion for the Aged Apartment Complex." Ph-D thesis, Incheon National Univ., Incheon.
  24. Whang, K.J., and Lee, C.S. (2007). "The Development of Procedure Model for Selecting the Method of Parking Lot Expansion in Apartment Complex." Journal of the Architectural Institute of Korea Structure & Construction, JAIK-SC, 23(2), pp. 151-160.
  25. Xing Su, Abdul rahman Andoh, Hubo Cai, Jing Pan, Amr Kandil, and Hisham M. Said. (2012). "Gis-based dynamic construction site material layout evaluation for building renovation projects." Automation in construction, 27, pp. 40-49. https://doi.org/10.1016/j.autcon.2012.04.007
  26. Youn, B.H. (2019). "Development of the Planning Procedure Model for the Remodeling of the Parking Lot in the Aged Apartment Complex." MS thesis, Incheon National Univ., Incheon.
  27. Youn, B.H., Choi, J.W., Park, S.P., Kim, T.W., and Lee, C.S. (2019). "A Study on the Functional Analysis of Parking Lot Expansion Technology using Technology-Tree." Korean Journal of Construction Engineering and Management, KICEM, 120(3), pp. 64-76.
  28. Yu, Y.S., and Lee, C.S. (2017). "The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique." Korean Journal of Construction Engineering and Management, KICEM, 18(3), pp. 52-62. https://doi.org/10.6106/KJCEM.2017.18.3.052