Acknowledgement
이 성과는 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(No. 2018R1D1A1B0705066013).
References
- Ministry of Employment and Labor (2019). Analysis of Industrial Accident Status 2018
- Ministry of Employment and Labor (2018). Analysis of Industrial Accident Status 2017
- Ministry of Employment and Labor (2017). Analysis of Industrial Accident Status 2016
- Korea Occupational Safety & Health Agency (2018). 2. A Guide of Risk Assessment Model for Explanation.
- Korea Occupational Safety & Health Agency (2011). Risk Assessment Model for Construction Work Types 8th
- An, S., & Song, S. (2012). Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method, Korea Journal of Business Administration, 14(3), pp.39-48
- Lee, H., Kim, H., Park, M., Lee, K., & Lee, S. (2009). Construction Risk Assessment Methodology Using Site Risk Influence Factors, Korean Journal of Construction Engineering and Management, KICEM, 10(6), pp.117-126
- Ko, S., Song, H., & Lee, J. (2004). A Study on the Hazard of Work Types for Building Construction, Journal of the Architectural Institute of Korea, Planning and Design Section, 20(5), pp. 136-143
- Yu, Y., Choi, J., Kim, T., & Lee, C. (2019). A risk Assessment Method using Disaster Influence Factors on Construction Project, Journal of Architectural Institute of Korea, Planning and Design Section, 35(6), pp. 3-12
- Choi, J., Kim, T., & Lee, C. (2019). Effects of Weather Factors on the Work Loss Days of the Elderly Workers, Korean Journal of Construction Engineering and Management, KICEM, 20(1), pp. 41-51 https://doi.org/10.6106/KJCEM.2019.20.1.041
- Sin, W., & Son, S. (2018). An Analysis on the Accident Influence Factor and Severity of Construction General Workers, Journal of Architectural Institute of Korea, Structure and Construction Section, 34(3), pp. 69-76
- Sin, W., & Son, S. (2018). An Analysis on the Safety Accident Network and Risk Level of Construction Machine and Equipment, Journal of Architectural Institute of Korea, Structure and Construction Section, 34(5), pp. 35-42
- Kim, E. (2018). Analysis on the Factors of Construction Disaster Applying the AHP, Journal of Architectural Institute of Korea, 20(1)
- Cho, J. (2017). A Study on the Application Plan of the Optimized Risk Assessment Model in Construction Field, Journal of Korea Safety Management & Science, 19(4)
- Peak, C., & Cho, U. (2015). A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry, Journal of Korea Safety Management & Science, 17(3)
- Yu, Y., Sin, D., & Kim, S. (2009). A Risk Assessment Method for the Small and Medium Construction Companies, Journal of Academic Conference of the Construction Management Association of Korea, pp. 428-432.
- Park, S., Choi, J., & Lee, C. (2020). Risk Assessment Method for Activities of Apartment Construction, Journal of Architectural Institute of Korea, Planning and Design Section, 36(3), pp.135-145
- Jin, J. (2019). A Study on utilization of Construction Safety Management Mobile App. Master's Thesis, Graduate School, Eulji University
- Kim, D., & Kim, H. (2001). A Plan of an Accident Classification System for the Analysis of Disaster information in Construction Projects, Journal of the Architectural Institute of Korea Structure and Construction Section, 17(11), pp. 139-145.
- Nam, M. (2008). A study on a model for evaluating the risk of major disasters in construction. Domestic master's thesis, Graduate School of Engineering, Korea University,
- Ko, K., Oh, S., & Lee, C. (2016). Application prototype development for periodic inspection of buildings. Journal of the Architectural Institute of Korea Structure and Construction Section, 32(1), pp. 63-71. https://doi.org/10.5659/JAIK_SC.2016.32.1.63