References
- A, Sotoudeh.G. and M, Kahanzadi. and M, Parchami.J. (2011), "A fuzzy MCDM for evaluating risk of construction projects", Australian J. Basic Appl. Sci., 5(12), 162-171.
- Agnieszka, D. and Mariusz, R. (2015), "Risk analysis in construction project - chosen methods", Procedia Eng., 122(2015), 258-265. https://doi.org/10.1016/j.proeng.2015.10.034.
- Azadeh, S. and Mehdi, R. (2015), "Risk determination, prioritization, and classifying in construction project case study: Gharb Tehran commercial-administrative complex", J. Construct. Eng., 2015, 1-10. http://dx.doi.org/10.1155/2015/203468.
- Cheng, S.G.H.A.R. (2013), "The identification and management of major risks in the malaysian construction industry", J. Construct. Develop. Countries., 18(1), 19-32.
- Elman, J.L. (1990), "Finding structure in time", Cognitive Sci., 14(1990), 179-211. https://doi.org/10.1207/s15516709cog1402_1.
- Gohar, A.S., Khanzadi, M. and Farmani, M. (2012), "Identifying and evaluating risks of construction projects in fuzzy environment: A case study in Iranian construction industry", Indian J. Sci. Technol., 5(11), 3593-3602.
- Gohar, A.S., Khanzadi, M. and Farmani, M. (2012), "Identifying and evaluating risks of construction projects in fuzzy environment: A case study in Iranian construction industry", Indian J. Sci. Technol., 5(11), 3593-3602.
- Greeshma, R.K. and Minu, A.J. (2016), "Assessment of risk factors in construction project using PI method", Int. Res. J. Eng. Technol. (IRJET)., 3(9), 767-770.
- Hesham, A., Remon, F.A. and Hamada, M.K. (2016), "Risk and uncertainty assessment model in construction projects using fuzzy logic", Amer. J. Civil Eng., 4(1), 24-39. https://doi.org/10.11648/j.ajce.20160401.13
- Hocine, A., Yasmina, K., Mohamed, G. and Bakhta, B. (2018), "Compressive strength prediction of limestone filler concrete using artificial neural networks", Advan. Comput. Design., 3(3), 289-302. https://doi.org/10.12989/acd.2018.3.3.289.
- Hopfield. J.J. (1982), "Neural networks and physical systems with emergent collective computational abilities", Proceedings of the National Academy of Science of the United States of America (PNAs)., 79(1982), 2554-2558. https://doi.org/10.1073/pnas.79.8.2554
- Jordan, M.I. (1997). "Serial order: A parallel distributed processing approach", Advan. Psychology. 121, 471-495. https://doi.org/10.1016/S0166-4115(97)80111-2
- Juan, D.B., Cedrick, B. and Daniel, N. (2013), "Maitrise des risques dans le processus de reponse a appel d'offres", Compiegne, France.
- Jyh, S.R.J. (1993), "ANFIS: adaptive-network-based fuzzy inference system", IEEE Transactions on Syst., Man Cybernetics, 23(3), 665-685. https://doi.org/10.1109/21.256541.
- K, Jayasudha. and B, Vidivelli. (2016), "Analysis of major risks in construction projects", ARPN J. Eng. Appl. Sci., 11(11), 6943-6950.
- K, Jayasudha. and B, Vidivelli. and E, R.G. Surjith. (2014), "Risk assessment and management in construction projects", Int. J. Sci. Eng. Res., 5(8), 387-396.
- Kansal, R.K. and Sharma, M. (2012), "Risk assessment methods and application in the construction projects", Int. J. Modern Eng. Res. (IJMER)., 2(3), 1081-1085.
- Mahendra, P.A., Pitroda, J.R. and Bhavsar, J.J. (2013), "A study of risk management techniques for construction projects in developing countries", Int. J. Innovat. Technol. Explor. Eng. (IJITEE)., 3(5), 139-142.
- Mahmoud, M.M.S. and Hassan, T.A. (2015), "Analysis of risk factors for highway construction projects in Egypt", J. Civil Eng. Architect., 9(2015), 526-533. 10.17265/1934-7359/2015.05.004
- Mehdi, E. and Reza, G. (2014), "Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study", KSCE J. Civil Eng., 18(5), 1213-1227. https://doi.org/10.1007/s12205-014-0139-5
- Mohsen, A., Kourosh, B., Abdollah, A. and Zoran, K. (2017), "Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects", J. Civil Eng. Manage., 23(2), 300-310. https://doi.org/10.3846/13923730.2015.1068847.
- Murat, G. and Ahmad, M.A.Y. (2018), "Analysis of project success factors in construction industry", Technol. Economic Develop. Economy., 24(1), 67-80. https://doi.org/10.3846/20294913.2015.1074129.
- Qbal, S., Choudhry, R.M., Holschemacher, K., Ali, A. and Tamosaitiene, J. (2014), "Risk management in construction projects", Int. J. Advan. Appl. Sci. Eng. (IJAEAS)., 1(3), 162-166.
- Radek, D. (2016), "An evaluation of total project risk based on fuzzy logic", Business: Theory Practice, 17(1), 23-31.
- Rafiq, M.C.H. and Khurram, I. (2013), "Identification of risk management system in construction industry in Pakistan", J. Manage. Eng., 29, 42-49. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000122.
- Renuka, S.M., Umarani, C. and Kamal, S. (2014), "A review on critical risk factors in the life cycle of construction projects", J. Civil Eng. Res., 4(2A), 31-36.
- Sathishkumar, V., Raghunath, P.N. and Suguna, K. (2015), "Critical factors influencing to management risk in construction projects", Int. J. Eng. Sci. (IJES)., 4(1), 37-46.
- Sotoudeh, G.A., Khanzadi, M., Jalal, M. and Parchami, A. (2011), "A fuzzy MCDM for evaluating risk of construction projects", Austra. J. Basic Appl. Sci., 5(12), 162-171.
- Sotoudeh, G.A., Khanzadi, M., Jalal, M. and Parchami, A. (2015), "Risk determination, prioritization, and classifying in construction project case study: Gharb Tehran commercial-administrative complex", J. Construct. Eng., 2015, 1-10. http://dx.doi.org/10.1155/2015/203468.
- Surabhi, M. and Brajesh, M. (2016), "A study on risk factors involved in the construction projects", Int. J. Innovative Res. Sci., Eng. Technol., 5(2), 1190-1196.
- Ubani, C., Amade, B., Okorocha, K. A., Agwu, F. and Okogbuo, F. (2015), "Project risk management issues in the Nigerian construction industry", Int. J. Eng. Technical Res. (IJETR)., 3(1), 217-232.
- Vladimir, C., Oleksandar, D. and Liudmyla, D. (2016), "Fuzzy logic approach to SWOT analysis for economics tasks and example of its computer realization", Bull. Transilvania Univ. Brasov., 9(58), 317-326.