참고문헌
- Adhikari, R.S., Bagchi, A. and Moselhi, O. (2014), "Automated condition assessment of concrete bridges with digital imaging", Smart Struct. Syst., Int. J., 13(6), 901-925. https://doi.org/10.12989/sss.2014.13.6.901.
- Adibfar, A. and Costin, A. (2019), Advances in Informatics and Computing in Civil and Construction Engineering, Springer, Switzerland.
- Akhoundan, M.R., Khademi, K., Bahmanoo, S., Wakil, K., Mohamad, E.T. and Khorami, M. (2018), "Practical use of computational building information modeling in repairing and maintenance of hospital building-case study", Smart Struct. Syst., Int. J., 22(5), 575-586. http://dx.doi.org/10.12989/sss.2018.22.5.575.
- Alikhani, H. and Alvanchi, A. (2017), "Using genetic algorithms for long-term planning of network of bridges", Scientia Iranica., 26(5), 2653-2664. http://dx.doi.org/10.24200/sci.2017.4604.
- Bazzucchi, F., Restuccia, L. and Ferro, G.A. (2018), "Considerations over the Italian road bridge infrastructure safety after the polcevera viaduct collapse: Past errors and future perspectives", Frattura Integr. Strutt., 46, 400-421. https://doi.org/10.3221/IGF-ESIS.46.37.
- Boller, C., Starke, P., Dobmann, G., Kuo, C.M. and Kuo, C.H. (2015), "Approaching the assessment of ageing bridge infrastructure", Smart Struct. Syst., 15(3), 593-608. http://dx.doi.org/10.12989/sss.2015.15.3.593.
- Brenner, J., Mitchell, A., Maier, F., Yockey, M., Pulikanti, S. and Michigan, W. (2018), "Development of 3D and 4D bridge models and plans", Report No. SPR-1647, Michigan, USA.
- Chan, B., Guan, H., Hou, L., Jo, J., Blumenstein, M. and Wang, J. (2016), "Defining a conceptual framework for the integration of modelling and advanced imaging for improving the reliability and efficiency of bridge assessments", J. Civ. Struct. Health Monit., 6(4), 703-714. https://doi.org/10.1007/s13349-016-0191-6.
- Chan, B., Guan, H., Jo, J. and Blumenstein, M. (2015), "Towards UAV-based bridge inspection systems: A review and an application perspective", Structural Monit. Maint., Int. J., 2(3), 283-300. https://doi.org/10.12989/smm.2015.2.3.283.
- Chassiakos, A., Vagiotas, P. and Theodorakopoulos, D. (2005), "A knowledge-based system for maintenance planning of highway concrete bridges", Adv. Eng. Softw., 36(11), 740-749. https://doi.org/10.1016/j.advengsoft.2005.03.020.
- Chen, W.F. and Duan, L. (2014), Bridge Engineering Handbook: Construction and Maintenance, CRC press, Florida, USA.
- Chipman, T., Costin, A., Eastman, R., Liebich, T., Smith, D. and Yang, D. (2016), "Bridge information modeling standardization", Report No. FHWA-HIF-16-011, FHWA, USA.
- Costin, A., Adibfar, A., Hu, H. and Chen, S.S. (2018), "Building information modeling (BIM) for transportation infrastructureliterature review, applications, challenges and recommendations", Autom. Constr., 94, 257-281. https://doi.org/10.1016/j.autcon.2018.07.001.
- Darbani, B.M. and Hammad, A. (2007), "Critical review of new directions in bridge management systems", Proceedings of the International Workshop on Computing in Civil Engineering, Pennsylvania, USA, July. https://doi.org/10.1061/40937(261)41.
- Davila Delgado, J.M., Butler, L.J., Gibbons, N., Brilakis, I., Elshafie, M.Z. and Middleton, C.R. (2016), "Management of structural monitoring data of bridges using BIM", 170(3), 204-218. https://doi.org/10.1680/jbren.16.00013.
- Deng, L., Wang, W. and Yu, Y. (2015), "State-of-the-art review on the causes and mechanisms of bridge collapse", J. Perform. Constr. Facil., 30(2), 04015005. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000731.
- Eastman, C., Eastman, C.M., Teicholz, P. and Sacks, R. (2011), BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, John Wiley & Sons, New Jersey, USA.
- Ehlen, M.A. (2003), BridgeLCC 2.0 Users-Manual, US Department of Commerce, National Institute of Standards and Technology, Maryland, USA.
- Elbehairy, H., Hegazy, T. and Soudki, K. (2009), "Integrated multiple-element bridge management system", J. Bridge Eng., 14(3), 179-187. https://doi.org/10.1061/(ASCE)1084-0702(2009)14:3(179).
- Farran, M. and Zayed, T. (2015), "Fitness-oriented multi-objective optimisation for infrastructures rehabilitations", Struct. Infrastruct. Eng., 11(6), 761-775. http://dx.doi.org/10.1080/15732479.2014.905964.
- Frangopol, D.M. and Liu, M. (2007), "Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost", Struct. Infrastruct. Eng., 3(1), 29-41. http://dx.doi.org/10.1080/15732470500253164.
- Hammad, A., Zhang, C., Hu, Y. and Mozaffari, E. (2006), "Mobile model-based bridge lifecycle management system", Comput. Aided Civ. Infrastruct. Eng., 21(7), 530-547. https://doi.org/10.1111/j.1467-8667.2006.00456.x.
- Han, P. (2017), "Geometry information extraction in 3D viewing model of industrial construction projects", M.Sc. Dissertation, University of Alberta, Alberta, Canada.
- Huang, T.L., Zhou, H., Chen, H.P. and Ren, W.X. (2016), "Stochastic modelling and optimum inspection and maintenance strategy for fatigue affected steel bridge members", Smart Struct. Syst. Int. J., 18(3), 569-584. http://dx.doi.org/10.12989/sss.2016.18.3.569.
- Huang, Y.H. and Huang, H.Y. (2012), "A model for concurrent maintenance of bridge elements", Autom. Constr., 21, 74-80. https://doi.org/10.1016/j.autcon.2011.05.014.
- Huthwohl, P., Brilakis, I., Borrmann, A. and Sacks, R. (2018), "Integrating RC bridge defect information into BIM models", J. Comput. Civ. Eng., 32(3), 0000744. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000744.
- Jeong, S., Hou, R., Lynch, J.P., Sohn, H. and Law, K.H. (2017), "An information modeling framework for bridge monitoring", Adv. Eng. Softw., 114, 11-31. http://dx.doi.org/10.1016/j.advengsoft.2017.05.009.
- Jung, H.J., Lee, J.H., Yoon, S. and Kim, I.H. (2019), "Bridge inspection and condition assessment using unmanned aerial vehicles (UAVs): Major challenges and solutions from a practical perspective", Smart Struct. Syst., Int. J., 24(5), 669-681. https://doi.org/10.12989/sss.2019.24.5.669.
- Kyle, B.R., Vanier, D.J., Kosovac, B., Froese, T.M. and Lounis, Z. (2002). "Visualizer: An interactive, graphical, decision-support tool for service life prediction for asset managers", Proceedings of the 9th International Conference on Durability of Building Materials and Components, Brisbane, Australia, March.
- Maier, F. and Brinckerhoff, P. (2012), "Bridge information modeling: Opportunities, limitations, and spanning the chasm with current tools", Report No. CI1529, Autodesk University, USA.
- Marzouk, M. and Hisham, M. (2011), "Bridge information modeling in sustainable bridge management", Proceedings of the International Conference on Sustainable Design and Construction, Missouri, USA, March. https://doi.org/10.1061/41204(426)57.
- Marzouk, M.M., Hisham, M. and Al-Gahtani, K. (2014), "Applications of bridge information modeling in bridges life cycle", Smart Struct. Syst., Int. J., 13(3), 407-418. https://doi.org/10.12989/sss.2014.13.3.407.
- Mawlana, M., Vahdatikhaki, F., Doriani, A. and Hammad, A. (2015), "Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects", Autom. Constr., 60, 25-38. https://doi.org/10.1016/j.autcon.2015.09.005.
- McGuire, B., Atadero, R., Clevenger, C. and Ozbek, M. (2016), "Bridge information modeling for inspection and evaluation", J. Bridge Eng., 21(4), 04015076. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000850.
- MDOT (2016), NBI Rating Guideline, Michigan, USA. https://www.michigan.gov.
- Morcous, G. and Lounis, Z. (2005), "Maintenance optimization of infrastructure networks using genetic algorithms", Autom. Constr., 14(1), 129-142. https://doi.org/10.1016/j.autcon.2004.08.014.
- O'Keeffe, A. (2014), "The state of the art of bridge information modelling from conceptual design through to operation", Int. J. 3D Inf. Model., 3(1), 29-39. https://doi.org/10.4018/ij3dim.2014010103.
- Park, K.H., Lee, S.Y., Yoon, J.H., Cho, H.N. and Kong, J.S. (2008), "Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost", Smart Struct. Syst., Int. J., 4(5), 641-653. http://dx.doi.org/10.12989/sss.2008.4.5.641.
- Rashidi, A. and Karan, E. (2018), "Video to BrIM: Automated 3D as-built documentation of bridges", J. Perform. Constr. Facil., 32(3), 04018026. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001163.
- Sacks, R., Kedar, A., Borrmann, A., Ma, L., Brilakis, I., Hüthwohl, P., Daum, S., Kattel, U., Yosef, R. and Liebich, T. (2018), "Seebridge as next generation bridge inspection: Overview, information delivery manual and model view definition", Autom. Constr., 90, 134-145. https://doi.org/10.1016/j.autcon.2018.02.033.
- Seyed-Hosseini, S. and Khoshkish, H. (2003), "Mathematical programming approach to allocate local or natioanl resources for bridge maintenance rehabilitation and replacement planning (researech note)", Int. J. Eng-Trans. A Basics., 16(4), 383-392.
- Shim, C., Kang, H., Dang, N.S. and Lee, D. (2017), "Development of BIM-based bridge maintenance system for cable-stayed bridges", Smart Struct. Syst., Int. J., 20(6), 697-708. https://doi.org/10.12989/sss.2017.20.6.697.
- Xu, Y. and Turkan, Y. (2019), Advances in Informatics and Computing in Civil and Construction Engineering, Springer, Switzerland. https://doi.org/10.1007/978-3-030-00220-6_74.
- Xue, F., Lu, W. and Chen, K. (2018), "Automatic generation of semantically rich as‐built building information models using 2D images: A derivative‐free optimization approach", Comput. Aided Civ. Infrastruct. Eng., 33(11), 926-942. https://doi.org/10.1111/mice.12378.
- Zambon, I., Vidovic, A., Strauss, A., Matos, J. and Friedl, N. (2018), "Prediction of the remaining service life of existing concrete bridges in infrastructural networks based on carbonation and chloride ingress", Smart Struct. Syst., Int. J., 21(3), 305-320. http://dx.doi.org/10.12989/sss.2018.21.3.305.
- Zhu, J. and Liu, B. (2011), "Performance life cost-based maintenance strategy optimization for reinforced concrete girder bridges", J. Bridge Eng., 18(2), 172-178. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000344.