The gob-side entry retaining with the high-water filling material in Xin'an Coal Mine

  • Li, Tan (Mining Research Institute, Inner Mongolia University of Science and Technology) ;
  • Chen, Guangbo (Mining Research Institute, Inner Mongolia University of Science and Technology) ;
  • Qin, Zhongcheng (College of Mining and Safety Engineering, Shandong University of Science and Technology) ;
  • Li, Qinghai (College of Mining and Safety Engineering, Shandong University of Science and Technology) ;
  • Cao, Bin (College of Mining and Safety Engineering, Shandong University of Science and Technology) ;
  • Liu, Yongle (College of Mining and Safety Engineering, Shandong University of Science and Technology)
  • 투고 : 2019.09.17
  • 심사 : 2020.08.18
  • 발행 : 2020.09.25

초록

With the increasing tension of current coal resources and the increasing depth of coal mining, the gob-side entry retaining technology has become a preferred coal mining method in underground coal mines. Among them, the technology of the gob-side entry retaining with the high-water filling material can not only improve the recovery rate of coal resources, but also reduce the amount of roadway excavation. In this paper, based on the characteristics of the high-water filling material, the technological process of gob-side entry retaining with the high-water filling material is introduced. The early and late stress states of the filling body formed by the high-water filling materials are analyzed and studied. Taking the 8th floor No.3 working face of Xin'an coal mine as engineering background, the stress and displacement of surrounding rock of roadway with different filling body width are analyzed through the FLAC3D numerical simulation software. As the filling body width increases, the supporting ability of the filling body increases and the deformation of the surrounding rock decreases. According to the theoretical calculation and numerical simulation of the filling body width, the filling body width is finally determined to be 3.5m. Through the field observation, the deformation of the surrounding rock of the roadway is within the reasonable range. It is concluded that the gob-side entry retaining with the high-water filling material can control the deformation of the surrounding rock, which provides a reference for gob-side entry retaining technology with similar geological conditions.

키워드

참고문헌

  1. Altunbas, A., Soltanbeigi, B. and Cinicioglu, O. (2017), "Determination of active failure surface geometry for cohesionless backfills", Geomech. Eng., 12(6), 983-1001. https://doi.org/10.12989/gae.2017.12.6.983.
  2. Archibald J.F., Chew J.L. and Lausch P. (1999), "Use of ground waste glass and normal Portland cement mixtures for improving slurry and paste backfill support performance", Cim. Bull., 92(10), 74-80. https://doi.org/10.1016/S0925-8388(98)01038-X.
  3. Chen, S.J., Qu, X., Yin, D.W., Liu, X.Q., Ma, H.F. and Wang, H.Y., (2018), "Investigation lateral deformation and failure characteristics of strip coal pillar in deep mining", Geomech. Eng., 14(5), 421-428. https://doi.org/10.12989/gae.2018.14.5.421.
  4. Deng, Y.H., Tang, J.X., Zhu, X.K., Fu, Y. and Dai, Z.Y. (2010), "Analysis and application in controlling surrounding rock of support reinforced roadway in gob-side entry with fully mechanized mining", Min. Sci. Technol., 20(6), 839-845. https://doi.org/10.1016/S1674-5264(09)60292-1.
  5. Deng, Y.H., Wang, S.Q. and Fan, Y.C. (2014), "Feasibility analysis of gob-side entry retaining in steep coal seam", Proceedings of the International Conference on Digital Manufacturing & Automation, Hefei, China, March.
  6. Doherty, P., Hasan, A., Suazo, G.H. and Fourie, A. (2015), "Investigation of some controllable factors that impact the stress state in cemented paste backfill", Can. Geotech. J., 52(12), 1901-1912. https://doi.org/10.1139/cgj-2014-0321.
  7. Fu, J.X., Song, W.D. and Tan, Y.Y. (2018), "Study of stability and evolution indexes of gobs under unloading effect in the deep mines", Geomech. Eng., 14(5), 439-451. https://doi.org/10.12989/gae.2018.14.5.439.
  8. Gao, W. (2018), "Influence of interaction between coal and rock on the stability of strip coal pillar", Geomech. Eng., 16(2), 151-157. https://doi.org/10.12989/gae.2018.16.2.151.
  9. Guo, G.L., Zha, J.F., Miao, X.X., Wang, Q. and Zhang, X.N. (2009), "Similar material and numerical simulation of strata movement laws with long wall fully mechanized gangue backfilling", Procedia Earth Planet. Sci., 1(1), 1089-1094. https://doi.org/10.1016/j.proeps.2009.09.167.
  10. Guo, G.L., Zhu, X.J. and Zha, J.F. (2014), "Subsidence prediction method based on equivalent mining height theory for solid backfilling mining", T. Nonferr. Metal. Soc. China, 24(10), 3302-3308. https://doi.org/10.1016/S1003-6326(14)63470-1.
  11. Guo, W.B., Wang, H. and Chen, S. (2016), "Coal pillar safety and surface deformation characteristics of wide strip pillar mining in deep mine", Arab. J. Geosci., 9(2), 1-9. https://doi.org/10.1007/s12517-015-2233-5.
  12. Haramy, K.Y. and Kneisley, R.O. (1990), "Yield pillars for stress control in longwall mines- case study", Geotech. Geol. Eng., 8(4), 287-304. https://doi.org/10.1007/bf00920642. https://doi.org/10.1016/j.tust.2004.04.002.
  13. Ishwar, S.G. and Kumar, D. (2017), "Application of DInSAR in mine surface subsidence monitoring and prediction", Current Sci., 112(1), 46-51. https://doi.org/10.18520/cs/v112/i01/46-51.
  14. Jaouhar, E., Li, L. and Aubertin, M. (2018) "An analytical solution for estimating the stresses in vertical backfilled stopes based on a circular arc distribution", Geomech. Eng., 15(3), 889-898. https://doi.org/10.12989/gae.2018.15.3.889.
  15. Karfakis, M.G., Bowman, C.H. and Topuz, E. (1996), "Characterization of coal-mine refuse as backfilling material", Geotech. Geol. Eng., 14(2), 129-150. https://doi.org/10.1007/bf00430273.
  16. Li, H.J., Zhang. Y.C., Xu, L., Jia, X.G. and Gu, X.M. (2017), "Examination of the treatment quality of filling mined-out voids using super-high-water material by the TEM technique", Environ. Earth Sci., 76(3). https://doi.org/10.1007/s12665-017-6431-1.
  17. Liu, H., Lei, S.G., Deng, K.Z., Yu, Y. and Wang, Y.X. (2014), "Research on ground fissure treatment filling with super-high-water material", J. China Coal Soc., 39(1), 72-77. https://doi.org/10.13225/j.cnki.jccs.2013.1296.
  18. Liu, X.S., Ning, J.G., Tan, Y.L., Xu, Q. and Fan, D.Y. (2018), "Coordinated supporting method of gob-side entry retaining in coal mines and a case study with hard roof", Geomech. Eng., 15(6), 1173-1182. https://doi.org/10.12989/gae.2018.15.6.1173.
  19. Ma, X.G., He, M.C., Sun, J.D., Hu, J., Zhang, X.Y. and Zhang, J.B. (2018), "Research on the design of roof cutting parameters of non coal pillar gob-side entry retaining mining with roof cutting and pressure releasing", Geotech. Geol. Eng., 37(3), 1169-1184. https://doi.org/10.1007/s10706-018-0676-7.
  20. Maleki, H.N., Agapito, J.F.T., Wangsgard M. and Cort, J. (1986), "Gate road layout design for two-seam longwall mining", Geotech. Geol. Eng., 4(2), 111-127. https://doi.org/10.1007/bf01560670.
  21. Medhurst, T.P. and Brown, E.T. (1998), "A study of the mechanical behaviour of coal for pillar design", Int. J. Rock Mech. Min. Sci., 35(8), 1087-1105. https://doi.org/10.1016/S0148-9062(98)00168-5.
  22. Ning, J.G., Wang, J., Bu, T.T., Hu, S.C. and Liu, X.S. (2017), "An innovative support structure for gob-side entry retention in steep coal seam mining", Minerals, 7(5), 1-18. https://doi.org/10.3390/min7050075.
  23. Oreste, P. (2005), "Back-analysis techniques for the improvement of the understanding of rock in underground constructions", Tunn. Undergr. Sp. Tech., 20(1), 7-21. https://doi.org/10.1016/j.tust.2004.04.002.
  24. Tan, Y.L., Yu, F.H., Ning, J.G. and Zhao, T.B. (2015), "Design and construction of entry retaining wall along a gob side under hard roof strata", Int. J. Rock Mech. Min. Sci., 100(77), 115-121. https://doi.org/10.1016/j.ijrmms.2015.03.025.
  25. Tian, D.M., Yao, J., Jiang, Z.A., Wang, X.M. and Zhang, Q.L. (2008), "The experimental study of the coal gangue as gel filling materials", J. Coal Sci. Eng. China, 14(1), 125-130. https://doi.org/10.1007/s12404-008-0025-1.
  26. Venticinque, G., Nemcik, J. and Ren, T. (2014), "A new fracture model for the prediction of longwall caving characteristics", Int. J. Min. Sci. Technol., 24(3), 369-372. https://doi.org/10.1016/j.ijmst.2014.03.014.
  27. Wang, X.Y., Bai, J.B., Wang, R.F. and Sheng, W.L. (2016) "Bearing characteristics of coal pillars based on modified limit equilibri-um theory", Int. J. Min. Sci. Technol., 25(6), 943-947. http://doi.org/10.1016/j.ijmst.2015.09.010.
  28. Xie, X.Z., Fan, Z.Z., Huang, Z.Z. and Xu, G. (2011), "Research on unsymmetrical loading effect induced by the secondary mining in the coal pillar", Procedia Eng., 26(26), 725-730. http:/doi.org/10.1016/j.proeng.2011.11.2229.
  29. Xu, M.T., Zhang,D.S., Ma, L.J., Wang, X.F. and Zhang, W. (2014), "Roof control technology for longwall filling mining of superhigh- water material", J. China Coal Soc., 39(3), 410-416. https://doi.org/10.13225/j.cnki.jccs.2013.0688.
  30. Yang, B., Chai, J. and Wang, M.H. (2018), "Study on roadside support method of gob-side entry retaining in condition of overlying and thick-hard roof", Safety Coal Mines, 49(7), 220-223. https://doi.org/10.13347/j.cnki.mkaq.2018.07.057.
  31. Yang, H.Y., Cao, S.G., Wang, S.Q., Fan, Y.C., Wang, S. and Chen, X.Z. (2016), "Adaptation assessment of gob-side entry retaining based on geological factors", Eng. Geol., 209, 143-151. https://doi.org/10.1016/j.enggeo.2016.05.016.
  32. Yin, Y.C., Zou, J.C., Zhang, Y.B., Qiu Y., Fang, K. and Huang, D.M. (2018), "Experimental study of the movement of backfilling gangues for goaf in steeply inclined coal seams", Arab. J. Geosci., 11(12), 318. https://doi.org/10.1007/s12517-018-3686-0.
  33. Zhang, N., Chen, H. and Chen, Y. (2015), "An engineering case of gob-side entry retaining in one kilometer-depth soft rock roadway with high ground pressure", J. China Coal Soc., 40(3), 494-501. https://doi.org/10.13225/j.cnki.jccs.2014.0326.
  34. Zhang, N., Han, C.L., Kan, J.G. and Zhen, X.G. (2014), "Theory and practice of surrounding rock control for pillarless gob-side entry retaining", J. China Coal Soc., 39(39), 1635-1641. https://doi.org/10.13225/j.cnki.jccs.2014.9026.
  35. Zhang, Z.Z., Bai, J.B., Chen, Y. and Yan, S. (2015), "An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving", Int. J. Rock Mech. Min. Sci., 80, 1-11. https://doi.org/10.1016/j.ijrmms.2015.09.001.
  36. Zhao, Y.M., Zhang, N., Zheng, X.G. and Li, B.Y. (2015), "Structural optimization of overlying strata for gob-side entry retaining in 1000 m deep mine with direct thick and hard roof", J. Min. Safety Eng., 32(5), 714-720. https://doi.org/10.13545/j.cnki.jmse.2015.05.003.

피인용 문헌

  1. Study on Influence Laws of Strata Behaviors for Shallow Coal Seam Mining beneath Gully Terrain vol.2021, 2021, https://doi.org/10.1155/2021/3954659
  2. Deformation Law and Control Measures of Gob-Side Entry Filled with Gangue in Deep Gobs: A Case Study vol.2021, 2020, https://doi.org/10.1155/2021/9967870
  3. Risk Early Warning Evaluation of Coal Mine Water Inrush Based on Complex Network and Its Application vol.2021, 2021, https://doi.org/10.1155/2021/9980948
  4. Study on the Bearing Characteristics and Application of the Filling Body in Original Roadway Filling and Nonpillar Driving vol.2021, pp.spec, 2021, https://doi.org/10.2113/2021/4238008