Acknowledgement
This research is supported by the National Natural Science Foundation of China (Grant No. 51808273), Project funded by China Postdoctoral Science Foundation (Grant No. 2018M643767, for Xiyin Zhang), Tianyou Youth Talent Lift Program of Lanzhou Jiaotong University (Xiyin Zhang), and lzjtu (201801) EP support. On behalf of all authors, the corresponding author states that there is no conflict of interest.
References
- Ameli, M.J. and Pantelides, C.P. (2017), "Seismic analysis of precast concrete bridge columns connected with grouted splice sleeve connectors", J. Struct. Eng., 143(2), 04016176. https://doi.org/10.1061/(ASCE)ST.1943-541X.0001678.
- Blanco, G., Ye, A., Wang, X. and Goicolea, J.M. (2019), "Parametric pushover analysis on elevated RC pile-cap foundations for bridges in cohesionless soils", J. Bridge Eng., 24(1), 04018104. https://doi.org/10.1061/(ASCE)BE.1943-5592.0001328.
- Bu, Z., Ding, Y., Chen, J. and Li, Y. (2012), "Investigation of the seismic performance of precast segmental tall bridge columns", Struct. Eng. Mech., 43(3), 287-309. https://doi.org/10.12989/sem.2012.43.3.287.
- Cansiz, S., Aydemir, C. and Arslan, G. (2019), "Comparison of displacement capacity of reinforced concrete columns with seismic codes", Adv. Concrete Constr., 5(4), 407-422. https://doi.org/10.12989/acc.2019.8.4.295.
- Chen, X., Ding, M., Zhang, X., Liu, Z. and Ma, H. (2018), "Experimental investigation on seismic retrofit of gravity railway bridge pier with CFRP and steel materials", Constr. Build. Mater., 182, 371-384. https://doi.org/10.1016/j.conbuildmat.2018.06.102.
- Chen, X., Zhang, X., Zhang, Y., Ding, M. and Wang, Y. (2020), "Hysteretic behaviors of pile foundation for railway bridges in loess", Geomech. Eng., 20(4), 323-331. https://doi.org/10.12989/gae.2020.20.4.323.
- Cheng, Z. and Sritharan, S. (2019), "Side shear strength of preformed socket connections suitable for vertical precast members", J. Bridge Eng., 24(5), 04019025. https://doi.org/10.1061/(ASCE)BE.1943-5592.0001391.
- Do, T.A., Chen, H.L., Leon, G. and Nguyen, T.H. (2019), "A combined finite difference and finite element model for temperature and stress predictions of cast-in-place cap beam on precast columns", Constr. Build. Mater., 217, 172-184. https://doi.org/10.1016/j.conbuildmat.2019.05.019.
- Dziadziuszko, P. and Sobala, D. (2018), "Precast concrete piles in Europe-AARSLEFF's experience", Proceedings of China-Europe Conference on Geotechnical Engineering, Eds. Wu, W., and Yu, H.S., Springer International Publishing, Cham.
- Fam, A., Pando, M., Filz, G. and Rizkalla, S. (2003), "Precast piles for Route 40 bridge in Virginia using concrete filled FRP tubes", PCI J., 48(3), 32-45.
- Gao, Q., Wen, Z., Ming, F., Liu, J., Zhang, M. and Wei, Y. (2019), "Applicability evaluation of cast-in-place bored pile in permafrost regions based on a temperature-tracking concrete hydration model", Appl. Therm. Eng., 149, 484-491. https://doi.org/10.1016/j.applthermaleng.2018.12.097.
- Gould, E. (2019), "An investigation of the structural capacity of the Alabama Department of Transportation's standard prestressed precast concrete piles", University of Alabama Libraries.
- Hallmark, R., White, H. and Collin, P. (2012), "Prefabricated bridge construction across Europe and America", Pract. Period. Struct. Des. Constr., 17(3), 82-92. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000116.
- Han, Q., Du, X., Zhou, Y. and Lee, G.C. (2013), "Experimental study of hollow rectangular bridge column performance under vertical and cyclically bilateral loads", Earthq. Eng. Eng. Vib., 12(3), 433-445. https://doi.org/10.1007/s11803-013-0184-y.
- Hummadi, O.A. and Hasan, A.M.H.M. (2019), "Effect of embedded length on laterally loaded capacity of pile foundation", Am. Scientif. Res. J. Eng., Technol. Sci., 56(1), 182-192.
- Kong, B., Cai, C.S. and Zhang, Y. (2016), "Parametric study of an integral abutment bridge supported by prestressed precast concrete piles", Eng. Struct., 120, 37-48. https://doi.org/10.1016/j.engstruct.2016.04.034.
- Liu, T., Wang, X. and Ye, A. (2019a), "Experimental study on seismic behavior of scoured pile-group foundations considering pile uplift", Proceedings of Structures Congress, 221-230.
- Liu, W., Chen, L., Yu, W., Lu, Y., Yu, F. and Hu, D. (2019b), "Experimental study on thermal performance of quicklime (CaO) energy pile aimed to thaw the warm permafrost ground", Appl. Therm. Eng., 156, 189-195. https://doi.org/10.1016/j.applthermaleng.2019.04.056.
- Lu, J., Chen, X., Ding, M., Zhang, X., Liu, Z. and Yuan, H. (2019), "Experimental and numerical investigation of the seismic performance of railway piers with increasing longitudinal steel in plastic hinge area", Earthq. Struct., 17(6), 545-556. https://doi.org/10.12989/eas.2019.17.6.545.
- Mashal, M. and Palermo, A. (2019), "Emulative seismic resistant technology for accelerated bridge construction", Soil Dyn. Earthq. Eng., 124, 197-211. https://doi.org/10.1016/j.soildyn.2018.12.016.
- Ou, Y.C., Tsai, M.S., Chang, K.C. and Lee, G.C. (2010a), "Cyclic behavior of precast segmental concrete bridge columns with high performance or conventional steel reinforcing bars as energy dissipation bars", Earthq. Eng. Struct. Dyn., 39(11), 1181-1198. https://doi.org/10.1002/eqe.986.
- Ou, Y.C., Wang, P.H., Tsai, M.S., Chang, K.C. and Lee, G.C. (2010b), "Large-scale experimental study of precast segmental unbonded posttensioned concrete bridge columns for seismic regions", J. Struct. Eng., 136(3), 255-264. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000110.
- Qin, Y. and Zheng, B. (2010), "The Qinghai-Tibet Railway: A landmark project and its subsequent environmental challenges", Environ. Develop. Sustain., 12(5), 859-873. https://doi.org/10.1007/s10668-009-9228-x.
- Schmeisser, A.B. and Benzoni, G. (2008), "Rational seismic design of precast prestressed piles", PCI J., 53(5), 40-53. https://doi.org/10.15554/pcij.09012008.40.53.
- Shang, Y., Niu, F., Wu, X. and Liu, M. (2018), "A novel refrigerant system to reduce refreezing time of cast-in-place pile foundation in permafrost regions", Appl. Therm. Eng., 128, 1151-1158. https://doi.org/10.1016/j.applthermaleng.2017.09.079.
- Shim, C., Dong Lee, C. and Ji, S.W. (2018), "Crack control of precast deck loop joint using high strength concrete", Adv. Concrete Constr., 6(5), 527-543. https://doi.org/10.12989/acc.2018.6.5.527.
- Sonin, A.A. (2004), "A generalization of the Π-theorem and dimensional analysis", Proc. Nat. Acad. Sci. US Am., 101(23), 8525-8526. https://doi.org/10.1073/pnas.0402931101.
- Thusoo, S., Kono, S., Hamada, J. and Asai, Y. (2020), "Performance of precast hollow steel-encased high-strength concrete piles", Eng. Struct., 204, 109995. https://doi.org/10.1016/j.engstruct.2019.109995.
- Titchenda Chan, K.R.M. and Zachary, B.H. (2020), "Precast seismic bridge column connection using ultra- high-performance concrete lap splice", ACI Struct. J., 117(1), 217-229. https://doi.org/10.14359/51718021.
- Tong, T., Zhuo, W., Jiang, X., Lei, H. and Liu, Z. (2019), "Research on seismic resilience of prestressed precast segmental bridge piers reinforced with high-strength bars through experimental testing and numerical modelling", Eng. Struct., 197, 109335. https://doi.org/10.1016/j.engstruct.2019.109335.
- Wang, J.C., Ou, Y.C., Chang, K.C. and Lee, G.C. (2008), "Large-scale seismic tests of tall concrete bridge columns with precast segmental construction", Earthq. Eng. Struct. Dyn., 37(12), 1449-1465. https://doi.org/10.1002/eqe.824.
- Wang, X., Ye, A., He, Z. and Shang, Y. (2016), "Quasi-static cyclic testing of elevated RC pile-cap foundation for bridge structures", J. Bridge Eng., 21(2), 04015042. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000797.
- Wang, Z., Ge, J. and Wei, H. (2014), "Seismic performance of precast hollow bridge piers with different construction details", Front. Struct. Civil Eng., 8(4), 399-413. https://doi.org/10.1007/s11709-014-0273-7.
- Xiao, Y., Guo, Y.R., Zhu, P.S., Kunnath, S. and Martin, G.R. (2012), "Networked pseudodynamic testing of bridge pier and precast pile foundation", Eng. Struct., 38, 32-41. https://doi.org/10.1016/j.engstruct.2011.12.020.
- Xiao, Y., Wu, H., Yaprak, T.T., Martin, G.R. and Mander, J.B. (2006), "Experimental studies on seismic behavior of steel pile-to-pile-cap connections", J. Bridge Eng., 11(2), 151-159. https://doi.org/10.1061/(ASCE)1084-0702(2006)11:2(151).
- Xie, D. (2011), Soil Dynamics, Higher Education Press, Beijing, China.
- Xue, J., Zhao, X., Ke, X., Zhang, F. and Ma, L. (2019), "Numerical analysis of the seismic performance of RHC-PVCT short columns", Adv. Concrete Constr., 8(4), 295-304. https://doi.org/10.12989/acc.2019.8.4.257.
- You, Y., Wang, J., Wu, Q., Yu, Q., Pan, X., Wang, X. and Guo, L. (2017), "Causes of pile foundation failure in permafrost regions: The case study of a dry bridge of the Qinghai-Tibet Railway", Eng. Geol., 230, 95-103. https://doi.org/10.1016/j.enggeo.2017.10.004.
- Zhang, X., Zhang, M., Chen, X., Li, S. and Niu, F. (2017), "Effect of thermal regime on the seismic response of a dry bridge in a permafrost region along the Qinghai-Tibet Railway", Earthq. Struct., 13(5), 429-442. https://doi.org/10.12989/eas.2017.13.5.429.
Cited by
- Study on lateral behavior of digging well foundation with consideration of soil-foundation interaction vol.24, pp.1, 2021, https://doi.org/10.12989/gae.2021.24.1.015