DOI QR코드

DOI QR Code

A Case Study on the Improvement of Display FAB Production Capacity Prediction

디스플레이 FAB 생산능력 예측 개선 사례 연구

  • Received : 2020.03.11
  • Accepted : 2020.04.25
  • Published : 2020.06.30

Abstract

Various elements of Fabrication (FAB), mass production of existing products, new product development and process improvement evaluation might increase the complexity of production process when products are produced at the same time. As a result, complex production operation makes it difficult to predict production capacity of facilities. In this environment, production forecasting is the basic information used for production plan, preventive maintenance, yield management, and new product development. In this paper, we tried to develop a multiple linear regression analysis model in order to improve the existing production capacity forecasting method, which is to estimate production capacity by using a simple trend analysis during short time periods. Specifically, we defined overall equipment effectiveness of facility as a performance measure to represent production capacity. Then, we considered the production capacities of interrelated facilities in the FAB production process during past several weeks as independent regression variables in order to reflect the impact of facility maintenance cycles and production sequences. By applying variable selection methods and selecting only some significant variables, we developed a multiple linear regression forecasting model. Through a numerical experiment, we showed the superiority of the proposed method by obtaining the mean residual error of 3.98%, and improving the previous one by 7.9%.

Keywords

References

  1. Carrasco, J., Alptekin, S.E., and Krumme, L., Mixed integer programming applied to atepper scheduling, Proceedings of the International Conference on Semiconductor Manufacturing Operational Modeling and Simulation, 1999, pp. 62-66.
  2. Cha, S.K., Kim, J.Y., and Yoon, J.Y., Agent system for implementation of the standard based OEE, Proceedings of the Korean Society for Precision Engineering, 2013, pp. 1475-1476.
  3. Cha, S.M., Jang, Y.H., and Lee, M.H., The development of virtual simulator for agile manufacturing system, Proceedings of the Korean Society of Manufacturing Technology Engineers, 2000, pp. 478-483.
  4. Choi, B.K., Park, S.C., Cha, E.S., Park, J.H., and Park, N.K., Virtual factory simulator, Proceedings of the Korea Institute of Industrial Technology, 1998, pp. 85-90.
  5. Choi, S.W., Scheduling algorithms for minimizing total weighted flow time in photolithography workstation of FAB, Journal of Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, No. 1, pp. 79-86.
  6. Gu, S.J. and Choi, B.K., Simulation ,odel of In-Line stocker system in TFT-LCD line, Proceedings of the Korean Institute of Industrial Engineers, 2008, pp. 288-294.
  7. Han, P. and Baek, J.G., Prediction model on delivery time in display FAB using survival analysis, Journal of the Korean Institute of Industrial Engineers, 2014, Vol. 40, No. 3, pp. 283-290. https://doi.org/10.7232/JKIIE.2014.40.3.283
  8. Hwang, H.R., A study on lot assignment problem in photolithography process of semiconductor manufacturing, [Master's Thesis], [Seoul, Korea] : Chung-Ang Univ., 2014.
  9. Na, H.J., Baek, J.K., and Kim, S.S., The study of production scheduling scheme in TFT-LCD factory, Journal of the Korean Institute of Industrial Engineers, 2002, Vol. 15, No. 4, pp. 325-337.
  10. Jeong, K.C. and Park, M.W., A progress management based daily production planning method for improving the Production Linearity of Semiconductor Fabs, Journal of the Korean Institute of Industrial Engineers, 2017, Vol. 43, No. 4, pp. 264-275. https://doi.org/10.7232/JKIIE.2017.43.4.264
  11. Kim, J.S., Development of object oriented manufacturing simulator, Journal of the Korean Institute of Industrial Engineers, 1991, Vol. 4, No. 2, pp. 73-79.
  12. Kim, J.W., A study on deterministic utilization of facilities for allocation in the semiconductor manufacturing, Journal of Society of Korea Industrial and Systems Engineering, 2016, Vol. 39, No. 1, pp. 153-161. https://doi.org/10.11627/jkise.2016.39.1.153
  13. Kim, K.T., Jang, S.Y., and Park, J.W., Development of intelligent simulator for knowledge acquisition of manufacturing system, Proceedings of the Korean Institute of Industrial Engineers, 1998, pp. 290-296.
  14. Lee, S.J. and Lee, H.C., The study on digital manufacturing system using by real-time simulation, Proceedings of the Korean Institute of Industrial Engineers, 2010, pp. 873-878.
  15. Lee, W.S., Improvement of Real Time Dispatcher System For LCD Fabrication Line, [Master's Thesis], [Seoul, Korea] : Kyung Hee University, 2009.
  16. Lee, Y., Kim, S.Y., Yea, S.H., and Kim, B.K., Production planning in semiconductor wafer fab considering variable cycle time, Journal of the Computers and Industrial Engineering, 1997, Vol. 33, No. 3, pp. 713-716. https://doi.org/10.1016/S0360-8352(97)00229-5
  17. Lyoo, G.H., Production Capacity Simulation Based On Overall Equipment Effectiveness, [Master's Thesis], [Suwon, Korea] : Ajou Univ., 2017.
  18. Millas, V.S. and Vosniakos, G.-C., Transfer batch scheduling using genetic algorithm, International Journal of Production Research, 2008, Vol. 46, No. 4, pp. 993-1016. https://doi.org/10.1080/00207540600920843
  19. Ramasesh, R.V., Fu, H., Fong, D.K.H., and Hayya, J.C., Lot streaming in multistage production system, International Journal of Production Economics, 2000, Vol. 66, No. 3, pp. 199-211. https://doi.org/10.1016/S0925-5273(99)00124-3
  20. Son, H.S., Lee, H.Y., and Choi, B.K., Capacity-filtering algorithm based release planning method for TFT-LCD Fab, Journal of the Korean Institute of Industrial Engineers, 2009, Vol. 22, No. 1, pp. 1-9.
  21. Song, K.B., Park, R.J., Kim, K.H., and Won, J.R., Electrical energy consumption forecasting algorithm using multiple regression method, Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, 2017, Vol. 31, No. 11, pp. 69-74. https://doi.org/10.5207/JIEIE.2017.31.11.069