Abstract
In this paper, we study the methodology to improve productivity and transportation efficiency simultaneously in the manufacturing environment of injection plants which has multiple injection machines arranged in parallel. In general, the post-processes such as finishing are continuously arranged in the injection machine located in the lower level of the injection plants, and one or two workers in charge of post-processing are always arranged. Therefore injection plants have low productivity due to post-processing and the front of the injection machine is very crowded due to various logistics flows. In this paper, we propose the designing methodology of conveyor structure for integrating the post-processes arranged at each injection machine and transporting the injection products to the integrated post-process automatically. Specifically, we propose the models for computing the number of conveyor units into the integrated processes, and for finding the optimal combinations to connect each machines and the conveyors. The proposed model is for the total productivity improvement, which are productivity and transportation efficiency. By applying the proposed model to companies that produce injection parts used for the home appliances, we verify the applicability and the effect of improving productivity and transportation efficiency, which more than 40%.
본 연구는 다수의 사출기가 병렬로 배치된 사출공장의 생산 환경에서 생산성 및 물류효율을 동시에 개선할 수 있는 방법론을 다루고자 한다. 일반적으로 사출공장의 저층부에 위치한 사출기에는 사상 등의 후가공 공정이 연속 배치되어 있고, 후가공을 담당하는 작업자 1~2명이 항시 배치되어 있다. 사출기 앞은 후가공 및 이후 공정으로의 물류 이송작업으로 인해 생산성 저하는 물론이고, 매우 복잡한 물류 흐름이 형성되어 있다. 이에 본 연구에서는 사출기마다 배치되어 있는 후가공 공정을 통합 운영하고, 통합된 후가공 공정에 사출품을 자동 이송하기 위한 컨베이어 구조를 설계하기 위한 방법론을 제안한다. 이를 위해 통합 후가공 공정으로의 투입 컨베이어 구조와 대수를 선정하기 위한 모델 및 각 사출기와 컨베이어를 연결하기 위해 최적의 조합을 찾기 위한 모델을 다룬다. 제안 방법론은 공정의 통합과 물류 방식의 재설계를 통해 생산성을 개선함과 동시에 물류 효율을 높일 수 있는 총합생산성 개선모델이다. 마지막으로 본 연구에서 제안한 방법론을 가전제품 외관에 사용되는 사출품을 생산하는 사출공장을 대상으로 적용하여, 실제 생산 환경에의 적용가능성을 확인함과 동시에 생산성 및 물류효율이 40% 이상 개선됨을 검증하였다.