DOI QR코드

DOI QR Code

Analysis of Train Operation Obstacle Using Number of Failures and Delay Time of Electric Door System

전기식 도어시스템의 고장건수 및 지연시간을 활용한 열차운행장애 분석

  • Lee, Bon Hyung (Daejeon Metropolitan Rapid Transit Corporation) ;
  • Kim, Doo-Hyun (Department of Safety Engineering, Chungbuk National University) ;
  • Kim, Sung-Chul (Department of Safety Engineering, Chungbuk National University)
  • Received : 2019.11.20
  • Accepted : 2020.02.10
  • Published : 2020.02.29

Abstract

This paper analyzes functions of component parts of D-Urban Railway's door system along with operation obstacle risks on frequency(the number of occurrences/year) and severity(delay time/the number of occurrences). Based on this, the paper presents improvements and current system's problems after obstacle risks of EMU and door system are appled. The obstacle of door system causes corrosion of main parts such as DCU due to heat problem of operation environment, problems of maintenance methods and deterioration. DCUs on PCBs with more than 50% pattern corrosion cause problems. Even though the number of door system's obstacle occurrences for the last 5 years is 42, along with 104 minutes of operation obstacle, EMU operation obstacle risk is low(Level 1), which indicates there is limit in matrix of railway risks presented by the standard of railway safety management system. Therefore, it is necessary to have railway risk matrix suitable for the field. Finally, the paper deducts the obstacle risks through frequency and severity. Since 2017 when the risks of EMU and door system's obstacle, that of EMU has been 24(47% reduced) and that of door system has been average 9.5 per year(23% reduced).

Keywords

References

  1. Notice No. 2005-438 of the Ministry of Construction and Transportation, Guidelines for Safety Standards for Railway Vehicles, 2005.
  2. Railway Safety Management System Daejeon Metropolitan Rapid Transit Corporation, 2005.
  3. Ministry of Land, Infrastructure and Transport, "Changing the 8th National Traffic Safety Plan", Railway Sector Traffic Safety Measures, pp.196-229, 2018.
  4. Notice No. 2016-579 of the Ministry of Land, Infrastructure and Transport, Technical Standards for Railway Products, 2016.
  5. Y. J. Yang and H. S. Lee, "Reliability Improvement Method of the Electrical Door System for the Railway Vehicles", Journal of Energy Engineering, Vol. 24, No. 1, pp. 17-23, 2015. https://doi.org/10.5855/ENERGY.2015.24.1.017
  6. C. S. Kim and H. S. Lee, "Reliability Analysis of Electric Door System for EMU", J. Korean Soc. Saf., Vol. 28, No. 8, pp. 52-56, 2013. https://doi.org/10.14346/JKOSOS.2013.28.1.052
  7. Door System Technical Specifications of Daejeon Metropolitan Rapid Transit Line No. 1, pp. 1-41, 2004.
  8. EMU Maintenance Instructions of Daejeon Metropolitan Rapid Transit Line No. 1, Vol. 1, Chapter 3, 3-3 Door Device, 2005.
  9. Notice No. 2014-552 of the Ministry of Land, Infrastructure and Transport for Guidelines on Report of Railway Accidents, 2014.
  10. Notice No. 2014-434 of the Ministry of Land, Infrastructure and Transport, Technical Standards for Railway Vehicles, 2014.
  11. J. H Lee, H. Lee and W. Y. Seo, "A Study on Passenger- Oriented Level of Service for Railway" Policy Research Report, 2014.
  12. H. K Bae, H. C. Kwak, Y. Y. Choi and Y. S. Oh, S.M Kang, "Estimation of Social Benefits by Reduction of Accidents Caused by Device Fiure in Urban Railway", Journal of Korean Society for Urban Railway, pp. 255-263, 2019.