DOI QR코드

DOI QR Code

BIM기반 MEP공사 시공용 도면 작성 자동화 프로세스 제안

An Automated Process to Produce Shop Drawings for MEP Works in BIM Environment

  • 투고 : 2020.12.28
  • 심사 : 2020.12.28
  • 발행 : 2020.12.31

초록

Shop drawing tasks conducted after finishing coordinated or engineering design have great influences on the quality and cost of a project. However, despite the development of commercial BIM applications, shop drawings have mainly produced manually in certain engineering fields. Incorrect shop drawings with human errors have occurred various problems such as cost overrun, time delay and reworks. An automated shop drawing publishing from BIM is expected to resolve these problems. Despite attempts for automate shop drawing production, the field of mechanical, electrical and plumbing (MEP) is yet regarded challenging due to complexity of components and connection. In this research, we develop a process for automated producing 3D MEP shop drawings in BIM environment as following steps: to analyze conventional MEP shop drawing process, to identify detailed process that can be automated, to classify existing MEP objects and assign codes usable in BIM, and to develop an application. The validation of automated process is conducted against 10 clean room projects in which MEP is more complex and its cost is higher than other projects in terms of productivity and workers' satisfaction. Results show that the number of manpower for shop drawing is reduced by 30%, and the working time is shortened by 31%. Personal opinions of involved practitioners is interpreted as positive as the average rate of agrement on practicability, easy-to-use and necessary retouch tasks is around 66%.

키워드

참고문헌

  1. Ahn, H. K. (2013). A Study on Improvement Plan of MEP BIM Business for 2D Design and Construction Step Using DSM. Hanyang University. Master's Thesis.
  2. Azhar, S., Nadeem, A., Mok, J. Y., Leung, B. H. (2008). Building Information Modeling(BIM):A new paradigm for visual interactive modeling and simulation for construction projects. First International Conference on Construction in Developing Countries, pp. 435-46.
  3. Bosch , F., Guillemet, A., Turkan, Y., Haas, C. T., Haas, R. (2014). Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system. Journal of Computing in Civil Engineering, 28(4), 05014004. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000343
  4. Cheng, J. C., Chen, W., Chen, K., Wang, Q. (2020). Data-driven predictive maintenance planning framework for MEP components based on BIM and IoT using machine learning algorithms. Automation in Construction, 112, 103087. https://doi.org/10.1016/j.autcon.2020.103087
  5. Ham, N. H., Yang, J. H., Yuk, O. K. (2019). A Study on the Productivity Analysis of 3D BIM-based Fabrication Documents Extraction. Journal of KIBIM Vol, 9(3).
  6. Hu, Z. Z., Tian, P. L., Li, S. W., Zhang, J. P. (2018). BIM-based integrated delivery technologies for intelligent MEP management in the operation and maintenance phase. Advances in Engineering Software, 115, pp. 1-16. https://doi.org/10.1016/j.advengsoft.2017.08.007
  7. Jeon, C. B. (2011). Design and Development of BIM Based Rebar Shop Drawing System. Daejeon University. Master's Thesis.
  8. Kang, T. W., Kim, J. E., Jung, T. S. (2016). Study on 3D Reverse Engineering-based MEP Facility Management Improvement Method. Journal of the Korea Academia-Industrial cooperation Society, 17(8), pp. 38-45. https://doi.org/10.5762/KAIS.2016.17.8.38
  9. Kim, E. J., Kim, J. H., Huh, Y. K. (2016). A case study on practical uses of BIM in building construction. Journal of the Architectural Institute of Korea Structure and Construction, 32(12), pp. 69-75. https://doi.org/10.5659/JAIK_SC.2016.32.12.69
  10. Kim, I., Lee, M., Choi, J., Kim, G. (2016). Development of an application to generate 2D drawings in automation using open BIM technologies. Korean Journal of Computational Design and Engineering, 21(4), pp. 417-425. https://doi.org/10.7315/CDE.2016.417
  11. Kim, Y. Y. (2019). A study on the automatic system of standardized rebar shop drawing. Yeungnam University. Master's Thesis.
  12. Kwon, O. C., Jo, J. W., Jo, C. W. (2013). Quality Management for Utilzing BIM in Construction Phase. Korean Journal of Computational Design and Engineering, 18(5), 338-347. https://doi.org/10.7315/CADCAM.2013.338
  13. Lee, J. S., Kwon, N., Ham, N. H., Kim, J. J., Ahn, Y. H. (2019). BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea. Advances in Civil Engineering. 2019(1), https://doi.org/10.1155/2019/4163625.
  14. Lee, Y. J. (2017). Automatic Solution for piping Isometric. CAD&Graphics, 283, pp. 62-64.
  15. Lu, Q., Wong, Y. H. (2018). A BIM-based approach to automate the design and coordination process of mechanical, electrical, and plumbing systems. HKIE Transactions, 25(4), pp. 273-280. https://doi.org/10.1080/1023697X.2018.1537813
  16. Manrique, J. D., Al-Hussein, M., Bouferguene, A., Nasseri, R. (2015). Automated generation of shop drawings in residential construction. Automation in Construction, 55, pp. 15-24. https://doi.org/10.1016/j.autcon.2015.03.004
  17. Motiejunas, V. (2016). Improving the MEP coordination using BIM technologies-A case study based on observations and interviews. Chalmers University of Technology. Master's Thesis.
  18. Nath, T., Attarzadeh, M., Tiong, R. L., Chidambaram, C., Yu, Z. (2015). Productivity improvement of precast shop drawings generation through BIM-based process reengineering. Automation in Construction, 54, pp. 54-68. https://doi.org/10.1016/j.autcon.2015.03.014
  19. Park, D. J. (2014). Research on the Economic Decision-Making of Industrial Clean-room Fast-Track Construction. Annual Conference of Architectural Institute of Korea, pp. 699-700.
  20. Park, H. J. (2013). A Study on the BIM Application for Shop Drawing of Steel Structures. Seoul National University of Science and Technology. Master's Thesis.
  21. Parn, E. A., Edwards, D. J., Sing, M. C. (2018). Origins and probabilities of MEP and structural design clashes within a federated BIM model. Automation in Construction, 85, pp. 209-219. https://doi.org/10.1016/j.autcon.2017.09.010
  22. Seong, J. K. (2012). Design and Development of BIM Based Rebar Shop Drawing System for Column and Wall. Daejeon University. Master's Thesis.
  23. Shin, T. S., Yang. J. M. (2009). A proposal for the automation process of creating shop drawings in steel constructions. The Regional Assoociation of Architectural Institute of Korea, pp. 267-274.
  24. Technavio. (2020). Global Cleanroom Technology Equipment Market 2020-2024. Global Research and Data, pp. 20-21.
  25. Yarmohammadi, S., Ashuri, B. (2015). Exploring the approaches in the implementation of BIM-based MEP coordination in the USA. Journal of Information Technology in Construction (ITcon), 20(22), pp. 347-363.