건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager

  • 양진국 (동의대학교 건설공학부 건축공학전공) ;
  • 홍성욱 ((주)화인종합건축사사무소 건설사업관리본부)
  • 투고 : 2018.11.09
  • 심사 : 2020.03.03
  • 발행 : 2020.03.30

초록

The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

키워드

과제정보

본 논문은 대한건축학회 2017년 추계학술발표대회에서 발표되었던 논문을 수정, 보완하여 작성한 것임.

참고문헌

  1. CERIK. (2002). Current status development direction of construction management (CM), Construction on Economy Research Institute of Korea.
  2. Kang, S., Jung, Y., Kim, N., & Shin, D. (2014). Policies and Tasks for Improving Korean CM Industry, Korea Journal of Construction Engineering and Management, 15(5), 71-81. https://doi.org/10.6106/KJCEM.2014.15.5.071
  3. Kim, D., & Kim, H. (2011). Identification of Core Competencies of Construction Managers, Korea Journal of Construction Engineering and Management, 12(6), 93-100. https://doi.org/10.6106/KJCEM.2011.12.6.93
  4. Hong, S., Yang, J., Choi, Y., & Ahn, T. (2017). Analysis of Critical Success Factors (CSFs) of Construction Technology Service Evaluation, Conference Proceedings of Architectural Institute of Korea, Vol.37 No.2, 845-888.
  5. Jung, S., & Yu, J. (2017), Analysis of Factors Affecting Job Competency of Quality Management for a Construction Manager, Korea Journal of Construction Engineering and Management, 18(1), 65-73. https://doi.org/10.6106/KJCEM.2017.18.1.065
  6. Lee, K., Lee, H., & Kim, N. (2013). A Research on the Development of Management Process System of Public Ordering Service Results and Estimation, Conference Proceedings of The Korea Institute of Building Construction, 14(1), 168-169.
  7. Yang, J., Kim, S., & Lee, S. (2017). An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer, Korea Journal of Construction Engineering and Management, 18(1), 58-64. https://doi.org/10.6106/KJCEM.2017.18.2.058
  8. Yun, W., Kim, K., & Lee, J. (2013). A Study on Comprehensive Evaluation System for Construction Engineering Service Firm, Conference Proceedings of The Korea Institute of Building Construction, 2013 Conference Proceedings, 203-204.
  9. http://www.contems.or.kr (Construction Technology Evaluation Management System)