References
- Bowe, M. and D. L. Lee. 2004. "Project evaluation in the presence of multiple embedded real options: evidence from the Taiwan High-Speed Rail Project," Journal of Asian Economics, 15: 71-98. https://doi.org/10.1016/j.asieco.2003.12.001
- Chen, A., K. Subprasom, and Z. Ji. 2003. "Mean-variance model for the build-operate-transfer scheme under demand uncertainty," Transport Res Rec, 1857(1): 93-101. https://doi.org/10.3141/1857-11
- Feng, Z., S. Zhang, Y. Gao, and S. Zhang. 2016. "Subsidizing and pricing private toll roads with non-contractible service quality: a relational contract approach," Transport. Res. Part B: Methodological, 91: 466-491. https://doi.org/10.1016/j.trb.2016.04.017
- Hadka, D., J. Herman, P. Reed, and K. Keller. 2015. "An Open Source Framework for Manyobjective Robust Decision Making," Environmental Modelling & Software, 74: 114-129. https://doi.org/10.1016/j.envsoft.2015.07.014
- Herman, J. D., P. M. Reed, H. B. Zeff, and G. W. Characklis. 2015. "How Should Robustness Be Defined for Water Systems Planning Under Change?" Journal of Water Resources Planning and Management, 141(10).
- Ho, S. H. and S. H. Liao. 2011. "A fuzzy real option approach for investment project valuation," Expert Systems with Applications, 38(12): 15296-15302. https://doi.org/10.1016/j.eswa.2011.06.010
- Kasprzyk, J. R., Nataraj, S., Reed, P. M., and R. J. Lempert. 2013. "Many objective robust decision making for complex environmental systems undergoing change," Environ. Modell. Software, 42: 55-71. https://doi.org/10.1016/j.envsoft.2012.12.007
- Kim, K. S., S. B. Cho, and I. S. Yang. 2012. Valuing the Risks Created by Road Transport Demand Forecasting in PPP Project, Policy Study 2012-17, Korea Development Institute.
- Kim, K. S. 2017. "Decision Making in Deep Uncertainty: Focusing on Transport Planning and Feasibility Studies," Policy Study 2017-17, KDI.
- Kim, K. S. 2019, A Study on the BTO-rs Contract Conditions under the Uncertainty of Operation Revenue, Working Paper 2019-02, KDI.
- Lempert, R. J. and M. T. Collins. 2007. "Managing the Risk of Uncertain Thresholds Responses: Comparison of Robust, Optimum, and Precautionary Approaches," Risk Analysis, 27: 1009-1026. https://doi.org/10.1111/j.1539-6924.2007.00940.x
- Marchau, V. A. M., W. E. Walker, P. J. T. Bloemen, and S. W. Popper. 2019. Decision Making under Deep Uncertainty, from theory to practice. Springer.
- Martin, B., and Rennie, A. 1996. Financial Calculus: An introduction to Derivate Pricing, Cambridge University Press.
- Tan, Z and H. Yang. 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty. Transportation Research Part B: Methodological, 46(10), 1419-1439. https://doi.org/10.1016/j.trb.2012.07.001
- Trigeorgis, L. Real Options: Managerial Flexibility and Strategy in Resource Allocation, Cambridge, MA: MIT Press, 1996.
- Yang, H. and Z. Meng. 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transport. Res. Part A: Pol. Pract., 34(3): 207-222. https://doi.org/10.1016/S0965-8564(99)00001-4
- Zhang, Y., Z. Feng, and S. Zhang. 2018. "The effects of concession period structures on BOT road contracts," Transport. Res. Part A: Pol. Pract., 107: 106-125. https://doi.org/10.1016/j.tra.2017.11.018