참고문헌
- Bang, H.S., Kweon, H.K., Lee, J.W. and Kim, M.J. 2014. A study on classification of disaster risk rating for forest road using AHP methodology. Journal of Korean Society of Forest Science 103(2): 258-263. https://doi.org/10.14578/jkfs.2014.103.2.258
- Chae, K.J. and Kim, O.I. 2010. A study on the priority analysis of strategies to forest policy. Journal of Government and Policy 2(2): 109-126.
- Choi, H.S., Lee, C.W., Kim, K.H., Youn, H.J. and Kim, G.Y. 2013. Developing the humanity and social risk index for landslide disasters in city. Journal of the Korean Society of Hazard Mitigation 13(5): 203-210. https://doi.org/10.9798/KOSHAM.2013.13.5.203
- Choi, J.R., Kim, G.W., Jee, Y.K. and Park, I.C. 2015. Development and application of precise debris-flow risk assessment index in urban area. Journal of the Korean Society of Hazard Mitigation 15(3): 107-113. https://doi.org/10.9798/KOSHAM.2015.15.3.107
- Chung, J.S., Lee, B.D. and Lee, S.K. 2002. Development of a forestland slope interpretation module for predicting landslide hazards. Journal of Korean Society of Forest Science 91(1): 34-41.
- Hong, J.M. 2011. An AHP approach for the importance weight of renewable energy investment criterion in the private sector. Korea Energy Economic Review 10(1): 115-142.
- Im, I.S., Lee, K.H. and Kim, D.G. 2014. Watershed characteristics of the proposed site installation Gyeongbuk debris barrier. Journal of the Korean Society of Forest Engineering 12(2): 104-116.
- Jung, K.W., Park, S.J. and Lee, C.W. 2008. Development of the score table for prediction of landslide hazard: A case study of Gyeongsangbuk-do province. Journal of Korean Society of Forest Science 97(3): 332-339.
- Kang, M.J., Kim, K.D., Oh, K.S., Park, J.W. and Park, J.H. 2016. Analysis of forest environmental factors on torrent erosion control work area in Gyeongsangnam-do: Focus on erosion control dam and stream conservation. Journal of Agriculture & Life Science 50(5): 111-120. https://doi.org/10.14397/jals.2016.50.5.111
- Kang, W.P., Murai, H., Omura, H. and Ma, H.S. 1986. On the determination of slope stability to landslide by quantification(II). Journal of Korean Society of Forest Science 75(1): 32-37.
- Korea Forest Service. 2018. Master plan for erosion control work. pp. 82.
- Korea Forest Service. 2019. Stastical Yearbook of Forestry. pp. 448.
- Kim, J.Y. 2009. A study on the policy and situation of sediment check dams: Case of Gangwon Province, Korea. Journal of the Korean Geomorphological Association 16(4): 131-144.
- Kim, K.N. and Jang, S.J. 2014. Development of criteria for zonning of debris flow hazard area. Journal of the Korean Society of Hazard Mitigation 14(6): 177-183. https://doi.org/10.9798/KOSHAM.2014.14.6.177
- Kim, S.W., Chun, K.W., Kim, K.N., Kim, M.S., Kim, M.S., Lee, S.H. and Seo, J.I. 2013. Significance and future direction for designation and management of landslide prone zones. Journal of Forest Environmental Science 29(3): 237-248. https://doi.org/10.7747/JFS.2013.29.3.237
- Lee, J.Y., Ju, H.J. and No, J.Y. 2010. Research on priority of forest values based on AHP. The Journal of Korean Policy Studies 10(3): 301-317.
- Lee, K.Y., Kim, K.N., Jang, J.W. and Chun, K.W. 2017. On analyzing the topography of shallow Failure: On the Mt. Umyeon. Journal of the Korean Society of Hazard Mitigation 17(3): 173-181. https://doi.org/10.9798/KOSHAM.2017.17.3.173
- Lee, S.S. 2010. A study on drainage facilities in mountainous urban neighborhood parks: The cases of Baebongsan park and Ogeum park in Seoul. Journal of the Korean Institute of Landscape Architecture 38(5): 80-92.
- Park, S.J., Lee, J.W., Choi, Y.H., Kim, M.J., Kweon, H.K., and Jeon, Y.J. 2010. A study on location condition for erosion Control Dam: Focus on chungcheong region and Kyeongsangbuk-do. Korean Journal of Agricultural Science 37(2): 223-229. https://doi.org/10.7744/CNUJAS.2010.37.2.223
- Park, J.H., Ji, B.Y., Hwang, J.S., Oh, J.H., Jung, D.H. and Cha, D.S. 2013. Study on the allocation method for forest road network using GIS. Journal of the Association of Korean Photo-Geographers 23(4): 1-11.
- Park, J.W., Cho, S.W., Jung, G.H., Kim, B.M., Woo, H.S., and Lee, Y.H. 2020. Development of forest thinning evaluation factors using the Analytic Hierarchy Process. Journal of Korean Society of Forest Science 109(3): 350-360. https://doi.org/10.14578/JKFS.2020.109.3.350
- Park, S.H., Jung, H.K. and Seok, H.D. 2013. Policy priority in long-term forest management: Using the Analytic Hierarchy Process (AHP). Korean Jounal of Forest Economics 20(1): 13-24.
- Park. J.H. 2011. Rapid increase in the change of the target site of the check dam. http://www.geojejournal.co.kr/news/articleView.html?idxno=3447.
- Ministry of Land, Infrastructure, and Transport. 2007. Road design manual of mountain area. pp. 162.
- Saaty, T.L. 1988. What is the analytic hierarchy process?. Mathematical models for decision support, NATO ASI Series F48: 109-133.
- Saaty, T.L. 1990. How to make a decision: The analytic hierarchy process. European Journal of Operational Research 48(1): 9-26 https://doi.org/10.1016/0377-2217(90)90057-I
- Woo, C.S., Kwon, H.J., Lee, C.W. and Kim, K.H. 2014 Landslide hazard prediction map based on logistic regression model for applying in the whole country of South Korea. Journal of the Korean Society of Hazard Mitigation 14(6): 117-123. https://doi.org/10.9798/KOSHAM.2014.14.6.117