DOI QR코드

DOI QR Code

국내외 TBM 제작 사양 및 전문인력 양성 프로그램 분석

Domestic and Overseas TBM Production Specification and Professional Training Program

  • 김기환 ((주)삼보기술단 지반사업본부) ;
  • 김성철 ((주)삼보기술단 지반사업본부) ;
  • 강시온 ((주)삼보기술단 지반사업본부) ;
  • 문철화 ((주)삼보기술단 지반사업본부) ;
  • 정윤영 ((주)삼보기술단 지반사업본부) ;
  • 김혁 ((주)삼보기술단 해외사업본부)
  • Kim, Ki-Hwan (Geotechnical Business Division, Sambo Engineering Co., Ltd.) ;
  • Kim, Seong-Cheol (Geotechnical Business Division, Sambo Engineering Co., Ltd.) ;
  • Kang, Si-On (Geotechnical Business Division, Sambo Engineering Co., Ltd.) ;
  • Mun, Cheol-Hwa (Geotechnical Business Division, Sambo Engineering Co., Ltd.) ;
  • Jeong, Yun-Young (Geotechnical Business Division, Sambo Engineering Co., Ltd.) ;
  • Kim, Hyouk (International Business Division, Sambo Engineering Co., Ltd.)
  • 투고 : 2019.09.23
  • 심사 : 2019.10.14
  • 발행 : 2019.10.31

초록

해외에서는 도심지나 하천 통과구간의 많은 터널은 쉴드TBM으로 시공되고 있고, 관련 장비발주가 이뤄지고 있으며 이에 따라 발주처가 장비제작에 필요한 사양서를 제공하고 있다. 또한, 전문인력 양성 프로그램을 이수한 사람이 TBM장비를 운영하도록 한다. 이는 기계화 시공으로 유발되는 현장에서의 장비운영 상의 리스크를 최소화하기 위함이다. 그러나 국내에서는 아직까지 이러한 시스템이 구축되어져 있지 않아 많은 어려움을 겪고 있는 실정이다. 따라서, 본 연구에서는 국내외 기계화 시공 시 제공되어 지고 있는 입찰안내서의 차이를 알아보고 해외에서 이뤄지고 있는 전문인력 교육 프로그램을 조사하였다. 향후 국내 입찰안내서에 포함되는 필수적인 장비 사양의 가이드라인을 제시하고, 전문인력 교육 프로그램에 필요한 안내서를 제공하고자 한다.

In Overseas case, most tunnels in under are or through the river are constructed with shield TBM and the manufacturer orders of related equipment suitable for the project are mode. Accordingly, the client provides the specifications required for the equipment manufacture. In addition, TBM equipment has been operated by those who have completed the expert training program, which for minimizing the risk of equipment operation in construction field corresponding to the mechanized construction. However, in Korea, such a system related to above the program and specifications has not yet been built, which is causing a lot of difficulties in construction field. Therefore, this study investigated the differences in bidding guides provided by mechanized construction in domestic and abroad, and the professional education programs for expert training being conducted from overseas. Futhermore, we will propose the guidelines of essential equipment specification contained in domestic bidding and provide the necessary manual for the professional education program for TBM as the mechanized construction method.

키워드

참고문헌

  1. Kim, K.H., Kim, H., Mun, C.H., Kim, Y.H., Kim, D.H., Lee, J.Y., 2017, "A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid)", Journal of Korean Tunnelling and Underground Association, Vol. 19, No. 6, pp. 985-997.
  2. Korea Rail Network Authority, 2012, Incheon International Airport 2nd Passenger Terminal Connection Railway of Construction work, Invitation to Bid.
  3. LTA (Land Transport Authority), 2016, Tunnel Machine, General Specification, Appendix P, Circle Line Stage 6 (CCL6) Mainline.
  4. MTR Corporation Limited, 2011, Contract 1109 - Particular Specification, Tunnel Boring Machine(TBM) and Lining (APPRENDIX AX).
  5. MTR Corporation Limited, 2011, Geotechnical Baseline Report (Revision C), Shatin to Central Link, Detailed Design for Sung Wong Toi to Ho Man Tin.
  6. Seoul City Urban Railway Development (2009), Seoul Subway Corporation Line 9 of Construction work, Invitation to Bid.