DOI QR코드

DOI QR Code

A Study on the Productivity Analysis of 3D BIM-based Fabrication Documents Extraction

3D BIM 기반 철골 제작도면 산출 생산성 분석

  • 함남혁 (한양사이버대학교 건축도시건설공학부 디지털건축도시공학과) ;
  • 양정혜 (한양사이버대학교 건축도시건설공학부 디지털건축도시공학과) ;
  • 여옥경 (한양사이버대학교 건축도시건설공학부 디지털건축도시공학과)
  • Received : 2019.07.26
  • Accepted : 2019.09.27
  • Published : 2019.09.30

Abstract

Extraction of fabrication documents is very important because it provides information related to tasks of fabrication and construction. Therefore, in the case of a prefabricated member such as a steel structure, it is necessary to improve the productivity of fabrication documents through 3D BIM. However, research and evidence data on direct comparison analysis of 3D BIM-based documents extraction versus 2D CAD-based documents extraction are hard to find. Thus, this study focuses on productivity analysis of 3D BIM based fabrication documents extraction. In this study, the productivity data of fabrication documents extraction for module construction of EPC project was analyzed. For the productivity analysis, a case study on the fabrication documents of Module A (1,965 sheets) and Module B (1,216 sheets) was conducted. Fabrication documents for each module include general arrangement drawing, assembly drawing, single part drawing and single plate drawing. Comparison of 2D CAD based fabrication documents extraction and 3D BIM based fabrication documents extraction, the productivity for the entire work was improved from 17 hours to 16 hours for Module A and 12 hours to 7 hours for Module B. Especially, the productivity of the assembly drawings, which occupies a large part of the fabrication documents, was improved by about 48.75% from the total time required from 281 hours to 144 hours.

Keywords

References

  1. Chin, S. Y. (2016). The Truth of 2D Drawing Extraction from BIM, Magazine of KIBIM, Winter 2016. pp. 27-30.
  2. Ministry of Land, Infrastructure and Transport. (2018). Department of Technology Policy, Smart construction technology roadmap for construction productivity innovation and safety enhancement, pp. 1-26.
  3. EOM, J. U., Shin, T. S. (2010). A Study on the Automation of the Connection modeling for Steel Structures based on BIM, Journal of Korean Society of Steel Construction, 22(1), pp. 99-108.
  4. EOM, J. U., Shin, T. S. (2011). A Development of Interface Module between Structural Design and Detail Design based on BIM, Journal of Korean Society of Steel Construction, 23(1), pp. 113-124.
  5. Ham, N. H., Moon, S., Kim, J. H., Kim, J. J. (2018). Downloaded 565 times Case Studies Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project, Journal of Construction Engineering and Management Vol. 144, Issue 6 (June 2018), https://doi.org/10.1061/(ASCE)CO.1943-7862.0001498
  6. Isolda, A. J., Florian, M., Norman, H., Timothy, W., Guillaume, H. (2017). Potential benefits of digital fabrication for complex structures: Environmental assessment of a robotically fabricated concrete wall, Journal of Cleaner Production. 154, 2017, pp.330-340. https://doi.org/10.1016/j.jclepro.2017.04.002
  7. Jang, S., Lee, G. (2018). Process, productivity, and economic analyses of BIM-based multi-trade prefabrication-a case study, Automation in Construction, vol. 89, pp. 86-98. https://doi.org/10.1016/j.autcon.2017.12.035
  8. Kaner, I., Sacks, R., Kassian, W., Quitt, T. (2008). Case Studies of BIM Adoption for Precast Concrete Design by Mid-sized Structural Engineering Firms, ITcon Vol. 13, pp. 303-323.
  9. Kim, B. J., Kim, Y. J., Chin, S. Y. (2018). A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase, Journal of KIBIM, 8(1), pp. 33-42. https://doi.org/10.13161/KIBIM.2018.8.1.033
  10. Kim, B. J., Ju, H. W., Jang, M. S., Kim, B. J., Chin, S. Y. (2016). An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies, Journal of KIBIM, 6(2), pp. 47-57. https://doi.org/10.13161/kibim.2016.6.2.047
  11. Kim, H. J. (2017). Analysis of BIM utilization in construction site, Construction Technology, Ssangyong Construction, pp. 68-73.
  12. Kim, J. K., Yoo, M. Y., Ham, N. H., Kim, J J., Choi, C. S. (2018). Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -, Journal of KIBIM, 8(2), pp. 41-50. https://doi.org/10.13161/KIBIM.2018.8.2.041
  13. Kim, S. J., Park, Y. M., Park, J. J. (2017). Review of Freeform Buildings using CNC T-BAR System, Journal of Academic and Technical Papers, Journal of The Korean Institute of Building Construction, 17(1), pp. 60-61.
  14. Lee, J. S., Kwon, N. H., Ham, N. H., Kim, J. J., Ahn, Y. H. (2019). BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea, https://doi.org/10.1155/2019/4163625 (Jul. 03. 2019).
  15. Lim, C. H. (2017). Application of 3D Information to Reduce Rework, Thesis (Master) - Hanyang University Graduate School of Engineering: Plant Engineering Major 2017. 2
  16. Nahangi, M., Haas, C. T. (2014). Automated 3D compliance checking in pipe spool fabrication, Advanced Engineering Informatics, vol. 28, no. 4, pp. 360-369. https://doi.org/10.1016/j.aei.2014.04.001
  17. Neelamkavil, J., Ahamed, S. S. (2012). The Return on Investment from BIM-driven Projects in Construction. IRC-RR-324, National Research Council, Canada, 2012.
  18. Oh, H. O., Jung, J. H., Lee, J. C. (2013). A Guideline for Structural Drawings Based on BIM, Journal of the Architectural Institute of Korea Structure & Construction, 29(3), pp. 39-46. https://doi.org/10.5659/JAIK_SC.2013.29.3.39
  19. Park, S. M., Ryu, J. R., Woo, S. H., Choo, S. Y. (2016). A Proposal for Required Drawing Information Standard and Its Effectiveness for Writing BIM-Based Construction Consent Documents, Journal of the regional association of architectural institute of korea, 18(2), pp. 19-26.
  20. Public Procurement Service (2017). Facility Project Basic Guide for Applying BIM, v1.32, https://www.pps.go.kr/mobile/item/domesticView.dom?boardSeqNo=3127&pageIndex=1&boardId=PPS089 (Jul. 15. 2019).
  21. Ryu, H. G., Kim, S. J. (2016). Implications Deduction through Analysis of Reverse Engineering Process and Case Study for Prefabrication and Construction of Freeform Envelop Panels, Journal of The Korean Institute of Building Construction, 16(6), pp. 579-585. https://doi.org/10.5345/JKIBC.2016.16.6.579
  22. Shin, T. S., Yang, J. M. (2009). A Proposal for the Automation Process of Creating Shop Drawings in Steel Constructions, Journal of the regional association of architectural institute of korea, 11(4), pp. 267-274.
  23. Wang, H. K., Choi, J. H. (2019). Data-driven Interactive Planning Methodology for EPC Plant Projects, Korean Journal of Construction Engineering and Management, 20(2), pp. 95-104. https://doi.org/10.6106/KJCEM.2019.20.2.095