DOI QR코드

DOI QR Code

A classification of electrical component failures and their human error types in South Korean NPPs during last 10 years

  • Received : 2018.08.07
  • Accepted : 2018.12.19
  • Published : 2019.04.25

Abstract

The international nuclear industry has undergone a lot of changes since the Fukushima, Chernobyl and TMI nuclear power plant accidents. However, there are still large and small component deficiencies at nuclear power plants in the world. There are many causes of electrical equipment defects. There are also factors that cause component failures due to human errors. This paper analyzed the root causes of failure and types of human error in 300 cases of electrical component failures. We analyzed the operating experience of electrical components by methods of root causes in K-HPES (Korean-version of Human Performance Enhancement System) and by methods of human error types in HuRAM+ (Human error-Related event root cause Analysis Method Plus). As a result of analysis, the most electrical component failures appeared as circuit breakers and emergency generators. The major causes of failure showed deterioration and contact failure of electrical components by human error of operations management. The causes of direct failure were due to aged components. Types of human error affecting the causes of electrical equipment failure are as follows. The human error type group I showed that errors of commission (EOC) were 97%, the human error type group II showed that slip/lapse errors were 74%, and the human error type group III showed that latent errors were 95%. This paper is meaningful in that we have approached the causes of electrical equipment failures from a comprehensive human error perspective and found a countermeasure against the root cause. This study will help human performance enhancement in nuclear power plants. However, this paper has done a lot of research on improving human performance in the maintenance field rather than in the design and construction stages. In the future, continuous research on types of human error and prevention measures in the design and construction sector will be required.

Keywords

References

  1. INPO 05-002 Rev. 1, Human Performance Tools for Engineers and Other Knowledge Workers, 2007.
  2. INPO 06-002, Human Performance Tools for Workers, 2006.
  3. INPO 90-004, Root Cause Analysis, 1990.
  4. Y.S. Jung, K-HPES for Human Error Management in the Nuclear Power Plants, 2008.
  5. K.J. Kim, Human Error: Why Should a Person Make an Error? YOUNG publisher, 2016.
  6. W.B. Kim, The Development of K-HPES: a Korean-version Human Performance Enhancement System, 2009.
  7. KHNP, Nuclear Information System (KONIS).
  8. Korea - Human Performance Enhancement System (K-HPES) User's Manual, 2013.
  9. KINS, A Study of the Strategy Enhancing the Application of HuRAM+, KINS/HR-1393, 2015.
  10. Y.H. Lee, A Concept and Application of 'Human Error 3.0' for High-Reliability Era, 2015.
  11. J.R. Reason, Human Error, 1990.
  12. Swain, Guttman, Handbook of Human-reliability Analysis with Emphasis on Nuclear Power Plant Application Final Report, 1983.
  13. WANO GL 2002-02, Principles for Excellence in Human Performance, 2002.

Cited by

  1. Systematic inherent safety and its implementation in chlorine liquefaction process vol.65, 2019, https://doi.org/10.1016/j.jlp.2020.104133
  2. Fuzzy FMECA analysis of radioactive gas recovery system in the SPES experimental facility vol.53, pp.5, 2019, https://doi.org/10.1016/j.net.2020.11.011