Fig. 1 Schematic diagram for the safety injection system
Fig. 2 2-Demension diagram for PAFS
Fig. 3 Diagram for shutdown cooling system during mid-loop operation
Table 1 Comparison of design features between 1,500MW reactor and reference plant
Table 2 Definition of POSs
Table 3 LPSD CDF contribution by POSs
Table 4 Sensitivity analysis for automated isolation of CVCS
Table 5 Sensitivity analysis for automated safety injection
Table 6 Sensitivity analysis for automated safety injection
Table 7 Sensitivity analysis for external injection of coolant
참고문헌
- KAERI, 2005, "Development of Nuclear Risk Management Technology/Development of Risk Assessment Technology for Low Power, Shutdown and Digital I&C Systems," Korea Atomic Energy Research Institute, Daejeon, KAERI/RR-2537/2004.
- USNRC, 1987, "Loss of Residual Heat Removal System: Diablo Canyon, Unit 2," U.S. Nuclear Regulatory Commission, Washington, D.C., NUREG-1269.
- USNRC, 1988, "Loss of Residual Heat Removal (RHR) While the Reactor Coolant System (RCS) is Partially Fieled,"U.S. Nuclear Regulatory Commission, Washington, D.C., GL88-17.
- USNRC, 1990, "Loss of Vital AC Power and the Residual Heat Removal System during Mid-Loop Operations at Vogtle Unit 1 on March 20," U.S. Nuclear Regulatory Commission, Washington, D.C., NUREG-1410.
- Moon, H. R. and Kim, H. G., 2016, "A Study on the Probabilistic Safety Assessment and Sensitivity Analysis of Success Criteria of Large LOCA for APR+," Journal of the Korean Society of Safety, Seoul, Vol. 29, No. 3, pp. 129-134. https://doi.org/10.14346/JKOSOS.2014.29.3.129
- EPRI, 1999, "Advanced Light Water Reactor Utility Requirements Document," Electric Power Research Institute, California, TR-016780.
- USNRC, 2007, "Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants," U.S. Nuclear Regulatory Commission, Washington, D.C., NUREG/CR-6928.
- USNRC, 2012, "Component Reliability Data Sheets," U.S. Nuclear Regulatory Commission, Washington, D.C., 2010 update to NUREG/CR-6928.
- USNRC, 1994, "Evaluation of Potential Severe Accidents during Low Power and Shutdown Operations at Surry Unit 1," U.S. Nuclear Regulatory Commission, Washington, D.C., NUREG/CR-6144, Vol.2, Part 1A.
- KHNP, 2015, "Probabilistic Safety Assessment for Shin-Kori unit 3 and 4," Korea Hydro and Nuclear Power Corporation LTD., Gyeongju.
- KHNP, 2018, "APR1400, Design Control Document Tier2, Chapter 19,"Korea Hydro and Nuclear Power Corporation LTD., Daejeon, APR1400-K-FS-14002-NP, Rev.2.
- KHNP, 2018, "Safety Assessment for Low Power /Shutdown and Features for Design Improvements for Large Power Plants," Korea Hydro and Nuclear Power Corporation LTD., Daejeon, 2018-50003339-0558TR.
- TVO, 2012, "BID Inquiry Specification for Olkiluoto 4, Nuclear Island Technical Requirements," Teollisuuden Voima Oyi, Olkiluoto, TR-NI, (restricted).
- EURO, 2012, "European Utility Requirement for LWR Nuclear Power Plants,"European Utility Requirement Organisation, Vol.2.
- KEPCO, 2018, "Level 1 Probabilistic Safety Assessment for Low Power and Shutdown Internal Event for Large Power Plant," KEPCO Engineer & Construction Company, Gimchon, 9-035-N463-002.
- USNRC, 1983, "Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications," Sandia National Laboratories, US Nuclear Regulatory Commission, Washington, D.C., NUREG/CR-1278.