Design of initial support required for excavation of underground cavern and shaft from numerical analysis

  • Oh, Joung (School of Minerals and Energy Resources Engineering, University of New South Wales) ;
  • Moon, Taehyun (Geotechnical and Tunneling Division, HNTB) ;
  • Canbulat, Ismet (School of Minerals and Energy Resources Engineering, University of New South Wales) ;
  • Moon, Joon-Shik (Department of Civil Engineering, Kyungpook National University)
  • Received : 2017.04.25
  • Accepted : 2019.03.20
  • Published : 2019.04.30

Abstract

Excavation of underground cavern and shaft was proposed for the construction of a ventilation facility in an urban area. A shaft connects the street-level air plenum to an underground cavern, which extends down approximately 46 m below the street surface. At the project site, the rock mass was relatively strong and well-defined joint sets were present. A kinematic block stability analysis was first performed to estimate the required reinforcement system. Then a 3-D discontinuum numerical analysis was conducted to evaluate the capacity of the initial support and the overall stability of the required excavation, followed by a 3-D continuum numerical analysis to complement the calculated result. This paper illustrates the application of detailed numerical analyses to the design of the required initial support system for the stability of underground hard rock mining at a relatively shallow depth.

Keywords

References

  1. Abdellah, W., Mitri, H, Thibodeau, D., and Moreau-Verlaan, L. (2014), "Stability of mine development intersectionsprobabilistic analysis approach", Can. Geotech. J., 51(2), 184-195. https://doi.org/10.1139/cgj-2013-0123
  2. Barla, G. and Barla, M. (2000), "Continuum and discontinuum modelling in tunnel engineering", Rudarsko Geolosko Naftni Zbornik, 12(1), 45-57.
  3. Barla, G. (2016), "Applications of numerical methods", Proceedings of the EUROCK2016: Tunnelling and Underground Excavations: Recent Trends, in Rock Mechanics and Rock Engineering: From the Past to the Future, Cappadocia, Turkey, August.
  4. Barton, N., Lien, R., and Lunde, J. (1974), "Engineering classification of rock masses for the design of tunnel support", Rock Mech., 6(4), 189-236 https://doi.org/10.1007/BF01239496
  5. Baskerville, C.A. (1994), Bedrock and Engineering Geologic Maps Of New York County and Parts of Kings and Queens Counties, New York, and Parts of Bergen and Hudson Counties, New Jersey, U.S. Geological Survey, U.S.A.
  6. Bieniawski, Z.T. (1989), Engineering Rock Mass Classifications, Wiley, New York, U.S.A.
  7. Carranza-Torres, C. and Fairhurst, C. (2000), "Application of the convergence-confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion", Tunn. Undergr. Sp. Technol., 15(2), 187-213. https://doi.org/10.1016/S0886-7798(00)00046-8
  8. Chen, M., Yang, S., Zhang, Y. and Zang, C. (2016), "Analysis of the failure mechanism and support technology for the Dongtan deep coal roadway", Geomech. Eng., 11(3), 401-420. https://doi.org/10.12989/gae.2016.11.3.401
  9. Cui, L., Zheng, J.J., Zhang, R.J. and Lai, H.J. (2015), "A numerical procedure for the fictitious support pressure in the application of the convergence-confinement method for circular tunnel design", Int. J. Rock Mech. Min. Sci., 78, 336-349. https://doi.org/10.1016/j.ijrmms.2015.07.001
  10. Cording, E.J., Hendron, A.J. and Deere, D.U. (1971), "Rock engineering for underground caverns", Proceedings of the Symposium on Underground Rock Chambers, Phoenix, Arizona, U.S.A., January.
  11. Cording, E.J. and Mahar, J.W. (1974), "The effect of natural geologic discontinuities on behavior of rock in tunnels", Proceedings of the Rapid Excavation and Tunneling Conference, Las Vegas, Nevada, U.S.A., June.
  12. Fuller, T., Short, L. and Merguerian, C. (1999), "Tracing the St. Nicholas Thrust and Cameron's line through the Bronx NYC", Proceedings of the Annual Conference on Geology of Long Island and Metropolitan New York, Stony Brook, New York, U.S.A., April.
  13. Hadjigeorgiou, J. and Karampinos, E. (2017), "Use of predictive numerical models in exploring new reinforcement options for mining drives", Tunn. Undergr. Sp. Technol., 67, 27-38. https://doi.org/10.1016/j.tust.2017.04.013
  14. Hashash, Y.M.A., Cording, E.J. and Oh, J. (2002), "Analysis of shearing of a rock", Int. J. Rock Mech. Min. Sci., 39(8), 945-957. https://doi.org/10.1016/S1365-1609(02)00094-1
  15. Itasca Consulting Group Inc. (2003), 3-Dimensional Distinct Element Code, 3DEC, User's Manual.
  16. MIDAS Information Technology Co. Ltd. (2007), MIDAS GTS, User's Manual.
  17. MTA CC-LIRR (2005), Geotechnical Baseline Report (GBR), Construction Contract CM0009 Manhattan Tunnels Excavation, ESA Project.
  18. MTA CC-LIRR (2005), Geotechnical Data Report (GDR), Construction Contract CM0009 Manhattan Tunnels Excavation, ESA Project.
  19. Oh, J., Cording, E.J., and Moon, T. (2015), "A joint shear model incorporating small-scale and large-scale irregularities", Int. J. Rock Mech. Min. Sci., 76, 78-87. https://doi.org/10.1016/j.ijrmms.2015.02.011
  20. Lu, Q., Xiao, Z.P., Ji, J. and Zheng, J. (2017), "Reliability based design optimization for a rock tunnel support system with multiple failure modes using response surface method", Tunn. Undergr. Sp. Technol., 70, 1-10. https://doi.org/10.1016/j.tust.2017.06.017
  21. Rocscience (2011) UNSWEDGE, User's Manual.
  22. Sanders, J.E. and Merguerian, C. (1997), "Geologic setting of a cruise from the mouth of the East river to the George Washington Bridge, New York Harbor", Proceedings of the Field Trip for Participants of the 36th U.S. Rock Mechanics Symposium, New York, U.S.A., June-July.
  23. Shah, A.N., Wang, J. and Samtani, N.C. (1998), "Geological hazards in the consideration of design and construction activities of the New York area", Environ. Eng. Geosci., 4(4), 524-533.
  24. U.S. Army Corps of Engineers (1980), Engineering and Design Rock Reinforcement, EM1110-1-2907, Department of the Army, U.S. Army Corps of Engineers, Washington, DC 20314-1000, U.S.A.
  25. Wang, T. and Huan, T. (2014), "Anisotropic deformation of a circular tunnel excavated in a rock mass containing sets of ubiquitous joints: theory analysis and numerical modeling", Rock Mech. Rock Eng., 47(2), 643-657. https://doi.org/10.1007/s00603-013-0405-8
  26. Wei, C.H., Zhu, W.C., Yu, Q.L, Xu, T., and Jeon, S. (2015), "Numerical simulation of excavation damaged zone under coupled thermal-mechanical conditions with varying mechanical parameters", Int. J. Rock Mech. Min. Sci., 75, 169-181. https://doi.org/10.1016/j.ijrmms.2014.11.010
  27. Yang, X.L. and Li, K.F. (2016), "Roof collapse of shallow tunnel in layered Hoek-Brown rock media", Geomech. Eng., 11(6), 867-877. https://doi.org/10.12989/gae.2016.11.6.867

Cited by

  1. A caving self-stabilization bearing structure of advancing cutting roof for gob-side entry retaining with hard roof stratum vol.21, pp.1, 2019, https://doi.org/10.12989/gae.2020.21.1.023
  2. Analysis of the crack propagation rules and regional damage characteristics of rock specimens vol.24, pp.3, 2019, https://doi.org/10.12989/gae.2021.24.3.215