참고문헌
- Ala-Risku, T. and Karkkainen, M. (2006), "Material delivery problems in construction projects: A possible solution", J. Production Economics, 104(1), 19-29. https://doi.org/10.1016/j.ijpe.2004.12.027
- Bell, L.C. and Stukhart, G. (1987), "Costs and benefits of materials management systems", J. Construct. Eng. Manag., 113(2), 222-234. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:2(222)
- Bertelsen, S. and Nielsen, J. (1997), "Just-in-time logistics in the supply of building materials", Proceedings of the 1st International Conference on Construction Industry Development, Singapore, December.
- Bertin, J. (2005), Semiologie graphique, les diagrammes - les reseaux - les cartes (4th Ed.), EHESS, Paris.
- Chavada, R.D., Kassem, M., Dawood, N.N. and Naji, K.K. (2012), "A framework for construction workspace management: A serious game engine approach", Proceedings of the 2012 ASCE International Conference on Computing in Civil Engineering, June.
- Fisk, R.E. and Reynolds, W.D. (2013), Construction Projects Administration (10th Ed.), Pearson Education, London, United Kingdom.
- Francis, A. (2013), "The chronographical approach for construction project modelling", Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 166(4), 188-204. https://doi.org/10.1680/mpal.12.00009
- Francis, A. (2016), "A Chronographic protocol for modelling construction projects", Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 169(4), 168-177. https://doi.org/10.1680/jmapl.15.00039
- Francis, A. (2017), "Simulating uncertainties in construction projects with chronographical scheduling logic", J. Construct. Eng. Manag., 143(1), 1-14. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001212
- Francis, A. and Miresco, E.T. (2000), "Decision support for project management using a chronographic approach", Proceedings of the 2nd International Conference on Decision Making in Urban and Civil Engineering, Lyon, France, November.
- Francis, A. and Miresco, E.T. (2002), "Decision support for project management using a chronographic approach", J. Decision Syst., 11(3-4), 383-404. https://doi.org/10.3166/jds.11.383-404
- Francis, A. and Miresco, E.T. (2006), "A chronographic method for construction project planning", Canadian J. Civil Eng., 33(12), 1547-1557 https://doi.org/10.1139/l06-148
- Francis, A., Bibai, J. and Miresco, E.T. (2013), "Simulation of scheduling logic using dynamic functions", Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 166(3), 145-158. https://doi.org/10.1680/mpal.11.00049
- Francis, A., Le Meur, E. and Miresco, E. (2018), "Space planning of material flow for building projects: The Chronographical modelling concept", Proceedings of the 17th International Conference on Computing in Civil and Building Engineering, ISCCBE, Tampere, Finland, July.
- Frandson, A. and Tommelein, I.D. (2014), "Development of a Takt-time plan: A case study", Proceedings of the Construction Research Congress, Atlanta, GA, May.
- Horman, M.J. and Thomas, H.R. (2005), "Role of inventory buffers in construction labor performance", J. Construct. Eng. Manag., 131(7), 834. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(834)
- Keim, D.A. (2002), "Information visualization and visual data mining", IEEE Transactions on Visualization and Computer Graphics, 7(1), 100-107.
- Ng, S.T., Shi, J. and Fang, Y. (2009), "Enhancing the logistics of construction materials through activity-based simulation approach", Eng., Construct. Architect. Manag., 16(3), 224-237. https://doi.org/10.1108/09699980910951645
- Ning, X., Lam, K. and Lam. M.C. (2010), "Dynamic construction site layout planning using max-min ant system", Automat. Construct., 19(1), 55-65. https://doi.org/10.1016/j.autcon.2009.09.002
- Pheng, L.S. and Chuan. C.J. (2001), "Just-in-time management of precast concrete components", J. Construct. Eng. Manag., 127(6), 494-501. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(494)
- Riley, D.R. and Sanvido, V.E. (1995), "Patterns of construction-space use in multistory buildings", J. Construct. Eng. Manag., 121(4), 464-473. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(464)
- Riley, D.R. and Sanvido, V.E. (1997), "Space planning method for multistory building construction", J. Construct. Eng. Manag., 123(2), 171-180. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:2(171)
- Rischmoller, L., Fisher, M., Fox, R. and Alarcon, L. (2001), "4D planning and scheduling (4D-PS): Grounding construction IT research in industry practice, construction information technology", Proceedings of CIB W78 International Conference-IT in Construction in Africa, Mpumalanga, South Africa, May.
- Su, X. and Cai, H. (2014), "Life cycle approach to construction workspace modeling and planning", J. Construct. Eng. Manag., 140(7), 1-12.
- Su, X. L., Zhang, A.R. and Cai, H. (2012), "GIS-based buffering for construction workspace management, Construction Research Congress, West Lafayette, Indiana, 1252-1261.
- Thomas, H.R., Riley, D. and Messner, J.I. (2005), "Fundamental principles of site material management", J. Construct. Eng. Manag., 131(7), 808. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(808)
- Tufte, E.R. (1983), The Visual Display of Quantitative Information, Graphics Press, Cheshire, CT, U.S.A.
- Winch, G.M. and North, S. (2006), "Critical space analysis", J. Construct. Eng. Manag., 132(5), 473-481. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(473)
- Zouein, P.P. and Tommelein, I.D. (2001), "Improvement algorithm for limited space scheduling". J. Construct. Eng. Manag., 127(2), 116-124. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(116)
피인용 문헌
- Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art vol.6, 2019, https://doi.org/10.3389/fbuil.2020.00128
- A semi-automated method for integrating textural and material data into as-built BIM using TIS vol.5, pp.2, 2019, https://doi.org/10.12989/acd.2020.5.2.127
- Barriers to BIM Adoption in Brazil vol.7, 2019, https://doi.org/10.3389/fbuil.2021.520154