참고문헌
- Albek, M., U. B. Ogutveren, and E. Albec, 2004. Hydrological modeling of Seydi Suyu watershed (Turkey) with hspf. Journal of Hydrology 285: 260-271. doi:10.1016/j.jhydrol.2003.09.002.
- Bicknell, B. R., J. L. Imhoff, J. L. Kittle, A. S. Donigian, and R. C. Johanson, 1996. Hydrologic simulation programfortran user's manual, 12, Athens, GA, US EPA
- Brun, S. E., and L. E. Band, 2000. Simulating runoff behavior in an urbanizing watershed. Computers, Environment and Urban Systems 24: 5-22. doi:10.1016/s0198-9715(99)00040-X.
- Castellarin, A., R. M. Vogel, and A. Brath, 2004, A stochastic index flow model of flow duration curves, Water Resources Research, 40, W03104. doi:10.1029/2003WR002524.
- Donigian, A. S., 2000. Hspf training workshop handbook and cd, lecture #19, calibraion and verification issures, Slide #L19-22 EPA Headquarters. Washington Information Center, 10-14 January, 2000. Presented and prepared for US EPA, Office of Science and Technology, Washington, D.C.
- Donigian, A. S., J. C. Imhoff,, and B. R. Bicknell, 1983. Predicting water quality resulting from agricultural nonpoint-source pollution via simulation-HSPF. In Agricultural Management and Water Quality, 200-249. Ames, Iowa: Iowa State University Press.
- Donigian, A. S., and J. T. Love, 2003. Sediment calibration procedures and guidelines for watershed modeling. WEF Specialty Conference Proceedings on CD-ROM. November 16-19, 2003. Chicago, Illinois, USA.
- Fontaine, T. A., and V. M. F. Jacomino, 1997. Sensitivity analysis of simulated contaminated sediment transport. Journal of the American Water Resource Association 33: 313-326. doi:10.1111/j.1752-1688.1997.tb03512.X.
- Houck, O. A., 2002. The clean water act TMDL program, Environmental Law Institute.
- Hwang, H. S., S. J. Lee, J. C. Ryu, J. H. Park, Y. S. Kim, and K. H. Ahn, 2016. A study on selection method of management watershed for total pollution load control at tributary, Journal of Korean Society on Water Environment 32(6): 528-536 (in Korean). https://doi.org/10.15681/KSWE.2016.32.6.528
- Hwang, H. S., C. G. Yoon, and J. T. Kim, 2010. Application load duration Ccurve for evaluation of impaired watershed at TMDL Unit watershed in Korea, Journal of Korean Society on Water Environment 26(6): 903-909 (in Korean).
- Jeon, J. H., D. H. Choi, K. J. Lim, and T. D. Kim, 2010a. Estimating nutrients delivery ratios at the subwatershed scale; a case study at the Bochung-a watershed. Journal of the Korean Society of Agricultural Engineers 52(5): 27-35 (in Korean). https://doi.org/10.5389/KSAE.2010.52.5.027
- Jeon, J. H., D. H. Choi, and T. D. Kim, 2010b. Analysis of characteristics of delivered nonpoint source pollution at forested watershed. Journal of Korean Society of Urban Environment 10(3): 273-280 (in Korean).
- Kang, J. H., J. J. Hong, S. G. Kim, M. S. Son, Y. J. Lee, and B. J. Lim, 2010. A study on calculating of delivery ratio daily WinHSPF/BASINS model. Journal of Korean Society of Water Science and Technology 18(5): 19-28 (in Korean).
- Kim, T. G., 2014. Assesment of watershed characteristics for apprehensive area of non-point source pollution using load duration curve, Journal of Korean Society of Environmental Technology 15(1): 1-11 (in Korean).
- Lee, Y. W., K. D. Song, J. C. Lee, K. S. Yoon, D. H. Rhew, S. W. Lee, and S. H. Lee, 2010. Development of a method for estimating non-point pollutant delivery load of each reference flow with combination of BASINS/HSPF. Korean Society of Environmental Engineers 32(2): 175-184 (in Korean).
- Legates, D. R., and G. J. McCabe, 1999, Evaluating the use of "goodness-of-fit" measures in hydrologic and hydroclimatic model validation, Water Resources Research 35(1): 233-241. doi:10.1029/1998WR900018.
- Ministry of Environment (MOE), 2017. Public announcement of implementation standards, Ministry of Environment (in Korean).
- Ministry of Environment (MOE), 2012. Water environment information system (WEIS), http://water.nier.go.kr/water Measurement/selectWater.do. Accessed May. 2018.
- Ministry of Environment (MOE), 2011. Waterbody and watershed on target water quality in the han river basin, Ministry of Environment (in Korean).
- Nash, J. E., and J. V. Sutcliffe, 1970. River flow forecasting through conceptual models part I : a discussion of principles, Journal of Hydrology 10(3): 282-290. doi:10.1016/0022-1694(70)90255-6.
- National Institute Environmental Research(NIER), 2016. A study on the establishment of management standards of total maximum daily loads for the four major river basins (I) (in Korean).
- National Institute of Environmental Research(NIER), 2015. Studies on simulation method of pollutant emission characteristics in Korean TMDL (in Korean).
- Nebraska, 2004. Total maximum daily loads for the big blue river basin(fecal coliform and e. coli bacteria), Nebraska Department of Environmental Quality Planning Unit, Water Quality Division.
- Nebraska, 2002. Nebraska's approach for developing TMDLs for streams using load duration curve.
- Nevada, 2003. Load duration curve methodlogy for assessment and TMDL, Development Nevada Division of Environmental Protection.
- Oregon, 2004. Bacteria technical appendix, williamette basin TMDL, Oregon Department of Environmental Quality.
- Park, J. H., H. S. Hang, D. H. Rhew, and O. S. Kwon, 2012. Estimation of delivery ratio based on BASINS/HSPF model for total maximum daily load. Journal of Korean Society on Water Environment 28(6): 833-842 (in Korean).
- Park, J. W ., K. S. Kim , K. S . Hwang, Y. W. Lee, and B. J. Lim, 2013. Application of load duration using discharge-load rating curve at Jiseok stream watershed. Journal of Korean Society on Water Environment 29(4): 523-530 (in Korean).
- Park, J. D., and S. Y. Oh, 2012. Methodology for the identification of impaired waters using LDC for the management of total maximum daily loads, Journal of Korean Society on Water Environment 28(5): 693-703 (in Korean).
- Shon, T. S., J. B. Park,, H. S. Shin, 2009. A study on estimation of the delivery ratio by flow duration in a small-scale test bed for managing TMDL in Nakdong River. Journal of Korean Society on Water Quality 25(5): 792-802 (in Korean).
- Singh, J., H. V. Knapp, and M. Demissie, 2004. Hydrologic modeling of the Iroquois River watershed using HSPF and SWAT. ISWS CR 2004-08. Champaign, Ill.: Illinois State Water Survey. Available at: www.sws.uiuc.edu/pubdoc/CR/ISWSCR2004-08.pdf. Accessed 8 September 2005.
- Sloto, R. A., and M. Y. Crouse, 1996. HYSEP : A computer program for stream flow hydrograph separation and analysis. U.S. Geological Survey Water Resources Investigations Report 96-4040. Lemoyne, pA. 46 p.
- Song, J. H., and M. S. Kang, 2016. Performance measures and calibration methods for hydrologic and water quality models. Rural Resources 58(2): 2-10 (in Korean).
- South California, 2004. Total maximum daily load development for the upper broad river watershed_fecal coliform bacteria, South California Department of Health and Environmental Control.
- United States Environmental Protection Agency (U. S. EPA), 2011. Lecture #15, watershed model calibration and validation: Issues and Procedures, https://www3.epa.gov/ceampubl/basins/training/b4lec15.pdf, pp. 11.
- United States Environmental Protection Agency Office of Wetlands, Oceans, & Watersheds (U. S. EPA.), 2007. An approach for using load duration curves in the development of TMDLs, U. S. EPA Office of Wetlands, Oceans, & Watersheds.
- Vogel, R. M., and N. M. Fennessey, 1995. Flow duration curves II. A review of applications in water resource planning. Water Resour. Bull. 31 (6), 1029-1039 doi:10.1111/j.1752-1688.1995.tb03419.x.