초록

The measurement and monitoring of the biochemical oxygen demand (BOD) play an important role in the planning and operation of wastewater treatment plants. The most basic method for determining biochemical oxygen demand is direct measurement. However, this method is both expensive and takes a long time. A five-day period is required to determine the biochemical oxygen demand. This study has been carried out in a wastewater treatment plant in Turkey (Hurma WWTP) in order to estimate the biochemical oxygen demand a shorter time and with a lower cost. Estimation was performed using artificial neural network (ANN) method. There are three different methods in the training of artificial neural networks, respectively, multi-layered (ML-ANN), teaching learning based algorithm (TLBO-ANN) and artificial bee colony algorithm (ABC-ANN). The input flow (Q), wastewater temperature (t), pH, chemical oxygen demand (COD), suspended sediment (SS), total phosphorus (tP), total nitrogen (tN), and electrical conductivity of wastewater (EC) are used as the input parameters to estimate the BOD. The root mean squared error (RMSE) and the mean absolute error (MAE) values were used in evaluating performance criteria for each model. As a result of the general evaluation, the ML-ANN method provided the best estimation results both training and test series with 0.8924 and 0.8442 determination coefficient, respectively.

키워드

참고문헌

  1. Anilan, T., Uzlu, E., Kankal, M. and Yuksek, O. (2018), "The estimation of flood quantiles in ungauged sites using teachinglearning based optimization and artificial bee colony algorithms", Scientia Iranica, 25(2), 1-8.
  2. Baki, O.T. (2016), "Modeling of biochemical oxygen demand on wastewater treatment plant by using different artificial intelligence methods: Antalya Hurma Wastewater Treatment Plant example", M.Sc. Dissertation, Karadeniz Technical University, Institute of Science and Technology, Trabzon.
  3. Baki, O.T. and Aras, E. (2018), "Atiksu Aritma Tesislerinde Biyokimyasal Oksijen Ihtiyacinin Farkli Regresyon Modelleriyle Tahmin Edilmesi", Eng. Sci., 13(2), 96-105. https://doi.org/10.3969/j.issn.1009-1742.2011.02.017
  4. Bayram, A., Uzlu, E., Kankal, M. and Dede, T. (2015), "Modeling stream dissolved oxygen concentration using teaching-learning based optimization algorithm", Environ. Earth Sci., 73(10), 6565-6576. https://doi.org/10.1007/s12665-014-3876-3
  5. Bayram, A. and Kankal, M. (2015), "Artificial neural network modeling of dissolved oxygen concentrations in a Turkish watershed", Pol. J. Environ. Stud., 24(4), 1507-1515
  6. Chapman, D. (1992), Water Quality Assessments, Chapman and Hall, London, United Kingdom.
  7. Civelekoglu, G. (2006), "The modeling of treatment processes with artificial intelligence and multistatistical methods", Ph.D. Dissertation, Suleyman Demirel University, Isparta.
  8. Cote, M., Grandjean, B.P.A., Lessard, P. and Thibault, J. (1995), "Dynamic modeling of the activated sludge process: Improving prediction using neural networks", Wat. Res. 29(4), 995-1004. https://doi.org/10.1016/0043-1354(95)93250-W
  9. Dede, T. and Ayvaz, Y. (2015), "Combined size and shape optimization of structures with a new meta-heuristic algorithm", Appl. Soft Comput. 28, 250-258. https://doi.org/10.1016/j.asoc.2014.12.007
  10. Dede, T. and Togan, V. (2015), "A teaching learning based optimization for truss structures with frequency constraints", Struct. Eng. Mech., 53(4), 833-845. https://doi.org/10.12989/sem.2015.53.4.833
  11. Dogan, E., Ates, A., Yilmaz, E.C. and Eren, B. (2008), "Application of artificial neural networks to estimate wastewater treatment plant inlet biochemical oxygen demand", Environ. Progress, 27(4), 439-446. https://doi.org/10.1002/ep.10295
  12. Dogan, E., Koklu, R., and Sengorur, B. (2007), "Estimation of biological oxygen demand using artificial neural network", International Earthquake Symposium, Kocaeli, Turkey, October.
  13. Fu, C. and Poch, M. (1998), "Fuzzy model and decision of COD control for an activated sludge process", Fuzzy Sets Syst., 93, 281-292. https://doi.org/10.1016/S0165-0114(96)00208-4
  14. Huang, M., Ma, Y., Wan, J. and Chen, X. (2015), "A sensorsoftware based on a genetic algorithm-based neural fuzzy system for modeling and simulating a wastewater treatment process", Appl. Soft Comput., 27, 1-10. https://doi.org/10.1016/j.asoc.2014.10.034
  15. Huang, Y.C. and Wang, X.Z. (1999), "Application of fuzzy causal network to wastewater treatment plants", Chem. Eng. Sci., 54, 2731-2738. https://doi.org/10.1016/S0009-2509(98)00421-7
  16. Kankal, M. and Uzlu, E. (2017), "Neural network approach with teaching-learning-based optimization for modeling and forecasting long-term electric energy demand in Turkey", Neural Comput. Appl., 28, 737-747.
  17. Karaboga, D. (2005), "An idea based on honey bee swarm for numerical optimization", Technical Report-TR06; Erciyes University, Engineering Faculty, Computer Engineering Department, Turkey.
  18. Karakaya, K. (2012), "Artificial Intelligence-Based Modeling for Prediction of Biogas Production Rate from Full-Scale Anaerobic Sludge Digestion Reactors: Neural Networks and Fuzzy Logic Applications", M.Sc. Dissertation, Yildiz Technical University, Institute of Science and Technology, Istanbul.
  19. Kermani, M.Z. and Scholz, M. (2013), "Modeling of Dissolved Oxygen Applying Stepwise Regression and a Template-Based Fuzzy Logic System", J. Environ. Eng., 140(1), 69-76.
  20. Kisi, O., Ozkan, C., Akay, B. (2012), "Modeling dischargesediment relationship using neural networks with artificial bee colony algorithm", J. Hydrol. 428, 94-103.
  21. Krishna, D. and Sree, R. (2014), "Artificial Neural Network (ANN) Approach for modeling chromium (VI) Adsorption from aqueous solution using a borasus flabellifer coir powder", J. Appl. Sci. Eng., 12(3), 177-192.
  22. Lee, D.S., Jeon, C.O., Park, J.M. and Chang, K.S. (2002), "Hybrid neural network modeling of a full scale industrial wastewater treatment process", Biotech. Bioeng., 78, 125-135.
  23. Mjalli, F.S., Al-Asheh, S. and Alfadala, H.E. (2006), "Use of artificial neural network black-box modeling for the prediction of wastewater treatment plants performance", J. Environ. Manage., 83, 329-338.
  24. Moreno-Alfonso, N. and Redondo, C.F. (2001), "Intelligent wastewater treatment with neural-networks", Water Policy, 3, 267-271. https://doi.org/10.1016/S1366-7017(01)00071-X
  25. Nacar, S., Hinis, M.A. and Kankal, M. (2018), "Forecasting daily streamflow discharges using various neural network models and training algorithms", KSCE J. Civil Eng., 22(9), 3676-3685. https://doi.org/10.1007/s12205-017-1933-7
  26. Nadiri, A.A., Shokri, S., Tsai, F.T.C. and Moghaddam, A.A. (2018), "Prediction of effluent quality parameters of a wastewater treatment plant using a supervised committee fuzzy logic model", J. Cleaner Product., 180, 539-549. https://doi.org/10.1016/j.jclepro.2018.01.139
  27. Nas, S.S. (2001), "Biyokimyasal oksijen ihtiyaci parametrelerinin biyolojik aritma unitelerinin boyutlandirilmasindaki etkileri", the 3th National Symposium of Urban Infrastructure Proceeding Book, Eskisehir-Turkey, November.
  28. Ozel, O. (2011), "Modeling Performance of Hurma Wastewater Treatment Plant", M.Sc. Dissertation, Cukurova University, Institute of Science and Technology, Adana.
  29. Ozturk, H.T., Turkeli, E. and Durmus, A. (2016), "Optimum design of RC shallow tunnels in earthquake zones using artificial bee colony and genetic algorithms", Comput. Concrete, 17, 435-453. https://doi.org/10.12989/cac.2016.17.4.435
  30. Pu, H.C. and Hung, Y.T. (2007), "Artificial neutral networks for predicting municipal activated sludge wastewater treatment plant performance", J. Environ. Studies, 48(2), 97-116,
  31. Ragot, J., Grapin, G., Chatellier, P. and Colin, F. (2001), "Modeling of a wastewater treatment plant. A multi-model representation", Environmetrics, 12(7), 599-611. https://doi.org/10.1002/env.460
  32. Safarinejadian, B., Gharibzadeh, B. and Rakhshan, M. (2014), "An optimized model of electricity price forecasting in the electricity market based on fuzzy timeseries", Syst. Sci. Control Eng., 2(1), 677-683, https://doi.org/10.1080/21642583.2014.970733
  33. Sezer, M. (2007), "Approximating of BOD Parameter from COD Parameter Using Artificial Neural Networks", M.Sc. Dissertation, Sakarya University, Institute of Science and Technology, Sakarya.
  34. Sinan, R.K., (2010), "Estimation of Primary Treatment and Biological Treatment Effluent Parameters by Artificial Neural Networks in Domestic Wastewater Treatment Plants", M.Sc. Dissertation, Selcuk University, Institute of Science and Technology, Konya.
  35. State Planning Organization, (2001), VIII. Five-Year Development Plan, Publication No: DPT:2555, 571.
  36. Tay, J. and Zhang, X. (2000), "A fast predicting neural fuzzy model for high-rate anaerobic wastewater treatment systems", Wat. Res., 34(11), 2849-2860. https://doi.org/10.1016/S0043-1354(00)00057-9
  37. Togan, V., (2012), "Design of planar steel frames using teaching-learning based optimization", Eng. Struct. 34, 225-232. https://doi.org/10.1016/j.engstruct.2011.08.035
  38. Topal, U., Dede, T. and Ozturk, H.T. (2017), "Stacking sequence optimization for maximum fundamental frequency of simply supported antisymmetric laminated composite plates using teaching-learning-based optimization", KSCE J. Civil Eng., 21(6), 2281-2288. https://doi.org/10.1007/s12205-017-0076-1
  39. Uzlu, E., Akpinar, A., Ozturk, H.T., Nacar, S. and Kankal, M. (2014a), "Estimates of hydroelectric generation using neural networks with the artificial bee colony algorithm for Turkey", Energy, 69, 638-647 https://doi.org/10.1016/j.energy.2014.03.059
  40. Uzlu, E., Kankal, M., Akpinar, A. and Dede, T. (2014b), "Estimates of energy consumption in Turkey using neural networks with the teaching learning-based optimization algorithm", Energy, 75, 295-303 https://doi.org/10.1016/j.energy.2014.07.078
  41. Uzlu, E., Komurcu, M.I., Kankal, M., Dede, T. and Ozturk, H.T. (2014c), "Prediction of berm geometry using a set of laboratory tests combined with teaching-learning-based optimization and artificial bee colony algorithms", Appl. Ocean Res., 48, 103-113. https://doi.org/10.1016/j.apor.2014.08.002
  42. Van Dongen, G. and Geuens, L. (1998), "Multivariate time series analysis for design and operation of a biological wastewater treatment plant", Wat. Res., 32(3), 691-700. https://doi.org/10.1016/S0043-1354(97)00249-2
  43. Verma, A.K. and Singh, T.N. (2013), "Prediction of water quality from simple field parameters", Environ Earth Sci., 69, 821-829. https://doi.org/10.1007/s12665-012-1967-6
  44. Yilmaz, B., Aras, E., Nacar, S. and Kankal, M. (2018), "Estimating suspended sediment load with multivariate adaptive regression spline, teaching-learning based optimization, and artificial bee colony models", Sci. Total Environ., 639, 826-840. https://doi.org/10.1016/j.scitotenv.2018.05.153
  45. Yilmaz, E.C. and Dogan, E. (2008), "Artificial Neural Networks Application for Modeling of Wastewater Treatment Plant Performance", Electron. Lett. Sci. Eng., 4(1), 1-9.
  46. Yoo, C.K. and Lee, I. (2001), "Wastewater quality modeling by hybrid GA-Fuzzy model", Asian Waterqual 2001, Fukuoka, Japan, September.
  47. Yoo, C.K., Choi, S.W. and Lee, I. (2002), "Adaptive modeling and classification of the secondary settling tank", Korean J. Chem. Eng., 19(3), 377-382. https://doi.org/10.1007/BF02697143
  48. Yoo, C.K., Vanrolleghem, P.A. and Lee, I.B. (2003), "Nonlinear modeling and adaptive monitoring with fuzzy and multivariate statistical methods in biological wastewater treatment plant", J. Biotechnol., 105, 135-163. https://doi.org/10.1016/S0168-1656(03)00168-8