Acknowledgement
Supported by : 한국연구재단
References
- Choi, J.S., Kim, I.H. (2016). Development of openBIM-based Quality Checking System. Proceeding of Annual Conference of the Architectural Institute of Korea, 36(2), pp.183-184.
- Lilis1, G.N., Rovas, D., Prieto, I. (2016). Second-level Space Boundary Topology generation from CityGML inputs. Building Simulation Optimization, At Newcastle, UK
- Goh, I.D., Choi, J.H., Kim, E.D., Lee, J.M. (2009). Extracting Building Element Geometry from BIM/IFC Physical Files. Journal of the Computational Structural Engineering Institute of Korea, 22(2), pp.163-172.
- Hong, S.H., Yeo, C.J., Yu, J.H. (2017). Automation of Information Extraction from IFC-BIM for Indoor Ari Quality Certification. Korea Journal of Construction Engineering and Management, 18(3), pp.63-73.
- Hwang, Y.S. (2004). Automatic Quantity Takeoff from Drawing Through IFC Model. Journal of the Architectural Institute of Korea Planning & Design, 20(12), pp.89-97.
- Jung, J.H. (2014). Exchange of Data on RC Structural Members between IFC and Tekla. Journal of the Architectural Institute of Korea Structure & Construction, 30(5), pp.49-56.
- Kim, C.M., Kim, Y.A., Hong, J.P., Choi, C.H., Lee, H.W. (2017). A Study on IFC-BIM based Automated Information Extraction Method for Evaluation of Low-energy Green Home : Focused on Architectural BIM. Journal of Korean Institute of Architectural Sustainable Environment and Building Systems, 11(2), pp.91-99.
- Kim, I.H., Choi, J.S., Kim, H.J. (2013). Proposition and Application of Mapping System for Input Data between Open BIM Data and Building Energy Simulation Software - Focused on Building Material Library and Energy Plus. Journal of the Architectural Institute of Korea Planning & Design, 29(4), pp.3-12.
- Kim, K.R., Yu, J.H. (2012). Method for extracting geometry data from IFC file for building energy load analysis. Journal of the Architectural Institute of Korea Planning & Design, 28(5), pp.241-248.
- Lee, J.C. (2014). IFC structural information model for practical use of opensees. Journal of the Architectural Institute of Korea Structure & Construction, 28(12), pp.53-60.
- Lee, J.G., Lee, H.S., Park, M.S., Jung, M.H. (2013). A Framework Integrating Cost and Schedule based on BIM using IFC. Korea Journal of Construction Engineering and Management, 14(3), pp.53-64. https://doi.org/10.6106/kjcem.2013.14.3.053