References
- Dictionary of Common Sense(2018), pmg Knowledge EngineResearch Institute, Park Moon Gak.
- Sung-Ho Nam et al(2008),Development of Flexible CNC Monitoring System for Machining, Korean Society for Precision Engineering, Autumn Conference, Vol. 2008, No. 11, pp. 17-18.
- Cheol-Soo Lee et al(2014), On Machine CNC MonitoringSystem, Korean Society for Precision Engineering, Autumn Conference, Vol. 2014, No. 10, p. 799.
- J. S. Yoon, Y. J. Choi(2014),Development of CNC DataInterface for Machining ProcessMonitoring, Korean Society for Precision Engineering, Spring Conference, Vol. 2014, No. 10, p. 494.
- Sung-Ho Nam et al(2013), AnOn-Line System Architecturefor Remote Energy Monitoring of CNC Machine Tools , Korean Society for Precision Engineering, Vol. 30, No. 5, pp. 480-485. https://doi.org/10.7736/KSPE.2013.30.5.480
- Jae-Won Lee(2003), Developmentof PC Camera-Based MonitoringSystem for NC Milling, KAIST, Master's Thesis.
- Gwang-Ryeol Park et al(2004), ADevelopment of Prototype System for Monitoring and Checking theSafety-Status of NC Machines, IEInterfaces, Vol. 17, No. 1, pp. 13-21
- B. Park, C. Lee(2017), A Study on Tool Monitoring System of Machining Center, Korean Society for Precision Engineering, AutumnConference, Vol. 2017, No. 12, p.892.
- Je-Phil Lee(2001), Real-Time Algorithm of a Look-AheadInterpolation and a NURBS Interpolation for High Speed andHigh Precision Machining Based onan Open Architecture CNCController, Chonnam National University, Doctoral Thesis.
- Twana Jaff and Atanas Ivanov(2015), Manufacturing Lead-Time Reduction and Knowledge Sharing in the ManufacturingSector, The Journal of Innovation Impact, Paper sdm15-068, pp. 618-629.
- Pius J. Egbelu(1991), Reduction of Manufacturing Lead-Time through Selection ofMachining Rate and UnitHandling Size, Procedia CIRP, Volume 21, Issue 1,pp. 21-34.
- Vinod Raj S N, Dr. M. Rajesh(2017), Lead Time Reduction in Manufacturing Process of CNCMachines by Lean Principles, International Research Journal ofEngineering and Technology(IRJET), e-ISSN: 2395-0056Volume: 04 Issue: 06, p-ISSN: 2395-0072,pp. 1297-1301 .
- Twana Abdlkader HusainJaff(2016), An Analytical Investigation into Lead-Time Reduction in the Manufacturing Sector: A Study of DiscreteManufacturing in Kurdistan Region of Iraq, Brunel University, DoctoralThesis.
- Marco Peronaet al(2016),Manufacturing Lead Time Shortening and Stabilisation by Means of Workload Control: An Action Research and a NewMethod, Journal of ProductionPlanning & Control, TheManagement of Operations, Volume 27, Issue 7-8, pp. 660-670.
- Olivier Malek et al(2016), LeadTime Reduction by High Precision 5-Axis Milling of a PrototypeGear, Procedia CIRP, Volume 46, pp. 440-443. https://doi.org/10.1016/j.procir.2016.04.051