References
- Amin Zadeh, R. and Mohseni Mahani, A. (2013), "New approach in building industrialization with the new 3D system of panels", Proceedings of the First National Conference on Architecture, Civil Engineering and Urban Environment, Hamadan.
- Aouadni, S., Rebai, A. and Turskis, Z. (2017), "The Meaningful Mixed Data TOPSIS (TOPSIS-MMD) method and its application in supplier selection", Stud. Inform. Control, 26(3), 353-363.
- Aqa Khani, B., Qazi Nejadiyan, A. and Darvishi, M. (2014), "3D panel of solutions for industrial production of lightweight buildings," Conference of Civil Engineering, Architecture and Urban Sustainable Management, Tehran.
- Ayatollahi, S.R. (2009), "Construction of pre-fabricated structures earthquake resistant", Yazd University, Technical Office of Yazd Governor, Yazd.
- Balali, V., Zahraie, B. and Roozbahani, A. (2014), "A comparison of AHP and PROMETHEE family decision making methods for selection of building structural system", Am. J. Civil Eng. Arch., 2(5), 149-159. https://doi.org/10.12691/ajcea-2-5-1
- Dan, D., Sun, L., Yang, Z. and Xie, D. (2014), "The application of a fuzzy inference system and analytical hierarchy process based online evaluation framework to the Donghai Bridge Health Monitoring System.", Smart Struct. Syst., 14(2), 129-144. https://doi.org/10.12989/sss.2014.14.2.129
- Das, S., Chew, M.Y.L. and Poh, K.L. (2010), "Multi-criteria decision analysis in building maintainability using analytical hierarchy process", Constr. Manage. Econ., 28(10), 1043-1056. https://doi.org/10.1080/01446193.2010.501806
- Erkayman, B. and Ozkal, F.M. (2016), "Evaluation of framed building types based on the combination of fuzzy AHP and fuzzy MOORA methods", Chall. J. Struct. Mech., 2(2), 101-108.
- Farokhzadeh, B., Attaeian, B., Akhzari, D., Razandi, Y. and Bazrafshan, O. (2015), "Combination of Boolean logic and Analytical Hierarchy Process methods for locating underground dam construction ", ECOPERSIA, 3(3), 1065-1075.
- Golabchi, M. and Mazaheriyan, H. (2010), Building New Technologies, Tehran, Tehran University Press.
- Hashemkhani Zolfani, S., Zavadskas, E.K. and Turskis, Z. (2013), "Design of products with both International and Local perspectives based on Yin-Yang balance theory and SWARA method", Economic Research-Ekonomska Istrazivanja, 26(2), 153-166. https://doi.org/10.1080/1331677X.2013.11517613
- Ishizaka, A. and Labib, A. (2009), "Analytic hierarchy process and expert choice: Benefits and limitations", Or Insight, 22(4), 201-220 https://doi.org/10.1057/ori.2009.10
- Jin, C.H. (2014), "Research on the risk evaluation of construction stage base on analytical hierarchy process for building engineering projects", Adv. Mater. Res., 1046, 135-138. https://doi.org/10.4028/www.scientific.net/AMR.1046.135
- Juhua, L., Lishou, T. and Yuan, L. (2011), "Application of AHP method in building construction and cultural combined-by human living environment construction of PengAn as the background", Management and Service Science (MASS), International Conference on IEEE, 1-4.
- Keshavarz Ghorabaee, M., Zavadskas, E.K., Olfat, L. and Turskis, Z. (2015), "Multi-criteria inventory classification using a new method of evaluation based on distance from average solution (EDAS)", Informatica, 26(3), 435-451. https://doi.org/10.15388/Informatica.2015.57
- Kuzman, M.K., Vratusa, V. and Groselj, P. (2014), "Comparison of different construction types for public buildings applying the analytic hierarchy process", Adv. Mater. Res., 875, 910-916.
- Lin, C.C., Wang, W.C. and Yu, W.D. (2008), "Improving AHP for construction with an adaptive AHP approach (A3)", Auto. Constr., 17(2), 180-187. https://doi.org/10.1016/j.autcon.2007.03.004
- Lin, S.C.J., Ali, A.S. and Bin Alias, A. (2015), "Analytic hierarchy process decision-making framework for procurement strategy selection in building maintenance work", J. Perform. Constr. Facil., 29(2), 1-13.
- Ma'soumi, A. and Mohammad Kari, B. (2008), TCF Reinforced Concrete System, Building and Housing Research Center.
- Mohammad Kari, B. and Khalili Jahromi, K. (2008), "ICF system, Studying and evaluating several proposed systems in mass production projects of residential buildings", Building and Housing Research Center, Department of Housing and Urban Development, Research Report, Publication Number: K-493.
- Mohammadi, F., Sadi, M.K., Nateghi, F., Abdullah, A. and Skitmore, M. (2014), "A hybrid quality function deployment and cybernetic analytic network process model for project manager selection", J. Civil Eng. Manage., 20(6), 795-809. https://doi.org/10.3846/13923730.2014.945952
- Peldschus, F., Zavadskas, E.K., Turskis, Z. and Tamosaitiene, J. (2010), "Sustainable assessment of construction site by applying game theory", Inzinerine Ekonomika-Engineering Economics, 21(3), 223-237.
- Peydayesh, M. and Labaf Zadeh, M.S. (2013), Concrete Buildings Technology, Iran Printing and Publishing Textbooks Company, Tehran, Iran.
- Qodsi Pour, H. (2013), Analytical Hierarchy Process, Issues About Multi-Criteria Decision-Making, 11th Edition, Amirkabir Industrial University, Tehran, Iran.
- Saaty, R.W. (1987), "The analytic hierarchy process-what it is and how it is used", Math. Model., 9(3), 161-176. https://doi.org/10.1016/0270-0255(87)90473-8
- Saaty, T.L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.
- Saaty, T.L. (1988), "What is the Analytic Hierarchy Process?", Mathematical Models for Decision Support, Springer, Berlin Heidelberg, 109-121.
- Saaty, T.L. (1990), "How to make a decision: the analytic hierarchy process", Eur. J. Oper. Res., 48(1), 9-26. https://doi.org/10.1016/0377-2217(90)90057-I
- Salamiyan, M. and Qale'h Noei, M. (2013), "The advantages of constructing a building by TCF from the perspective of construction management", Proceedings of the Seventh National Congress of Civil Engineering, Shahid Nikbakht Faculty of Engineering, Zahedan.
- Saparauskas, J., Kazimieras Zavadskas, E. and Turskis, Z. (2011), "Selection of facade's alternatives of commercial and public buildings based on multiple criteria", Int. J. Strategic Prop. Manage., 15(2), 189-203. https://doi.org/10.3846/1648715X.2011.586532
- Shi, L., Zhang, R.F., Xie, Q.Y. and Fu, L.H. (2009), "Improving Analytic Hierarchy Process applied to fire risk analysis of public building", Chin. Sci. Bull., 54(8), 1442-1450.
- Sivilevicius, H., Zavadskas, E.K. and Turskis, Z. (2008), "Quality attributes and complex assessment methodology of the asphalt mixing plant", Baltic J. Road Bridge Eng., 3(3), 161-166. https://doi.org/10.3846/1822-427X.2008.3.161-166
- Smith, T. and Testa, C. (2004), "Design process in building prefabrication", Translated by Alireza Jazbi, Khak Publication, Tehran.
- Triantaphyllou, E. and Mann, S.H. (1995), "Using the analytic hierarchy process for decision making in engineering applications: some challenges", Int. J. Indus. Eng.: Appl. Pract., 2(1), 35-44.
- Turskis, Z., Lazauskas, M. and Zavadskas, E.K. (2012), "Fuzzy multiple criteria assessment of construction site alternatives for non-hazardous waste incineration plant in Vilnius city, applying ARAS-F and AHP methods", J. Environ. Eng. Landsc. Manage., 20(2), 110-120. https://doi.org/10.3846/16486897.2011.645827
- Vaidya, O.S. and Kumar, S. (2006), "Analytic hierarchy process: An overview of applications", Eur. J. Oper. Res., 169(1), 1-29. https://doi.org/10.1016/j.ejor.2004.04.028
- Vichare, V.K., Aher, M.C. and Devalkar, R.V. (2015), "Application of analytical hierarchy process in construction of residential building project", IJMTER, 2(7), 862-867.
- Wong, J.K.W. and Li, H. (2008), "Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems", Build. Environ., 43(1), 108-125. https://doi.org/10.1016/j.buildenv.2006.11.019
- Yoon, K.P. and Hwang, C.L. (1995), Multiple Attribute Decision Making: An Introduction, Sage Publications, London.
- Zagorskas, J., Zavadskas, E.K., Turskis, Z., Burinskiene, M., Blumberga, A. and Blumberga, D. (2014), "Thermal insulation alternatives of historic brick buildings in Baltic Sea Region", Energy Build., 78, 35-42. https://doi.org/10.1016/j.enbuild.2014.04.010
- Zahedi, F. (1986), "The analytic hierarchy process-a survey of the method and its applications", Interf., 16(4), 96-108. https://doi.org/10.1287/inte.16.4.96
- Zavadskas, E.K., Antucheviciene, J., Saparauskas, J. and Turskis, Z. (2013a), "MCDM methods WASPAS and MULTIMOORA: verification of robustness of methods when assessing alternative solutions", Econ. Comput. Econ. Cyber. Stud. Res., 47(2), 5-20.
- Zavadskas, E.K., Kaklauskas, A., Turskis, Z. and Kalibatas, D. (2009), "An approach to multi-attribute assessment of indoor environment before and after refurbishment of dwellings", J. Environ. Eng. Landsc. Manag., 17(1), 5-11. https://doi.org/10.3846/1648-6897.2009.17.5-11
- Zavadskas, E.K., Mardani, A., Turskis, Z., Jusoh, A. and Nor, K. M. (2016), "Development of TOPSIS method to solve complicated decision-making problems-An overview on developments from 2000 to 2015", Int. J. Inform Technol. Dec. Mak., 15(03), 645-682. https://doi.org/10.1142/S0219622016300019
- Zavadskas, E.K., Turskis, Z., Volvaciovas, R. and Kildiene, S. (2013b), "Multi-criteria assessment model of technologies", Stud. Inform. Control, 22(4), 249-258.
- Zavadskas, E.K., Vilutiene, T., Turskis, Z. and Saparauskas, J. (2014), "Multi-criteria analysis of projects' performance in construction", Arch. Civil Mech. Eng., 14(1), 114-121. https://doi.org/10.1016/j.acme.2013.07.006