참고문헌
- Ministry of Trade, Industry and Energy and Korea EnergyAgency, 2016, New & Renewable Energy White Paper, pp. 777, 2016.
- Park, W., and Lee, C., Estimation Method of Small Hydro Power Potential Using a Resource Map, Proceeding of the Korean Solar Energy Society, pp. 322-326, 2008.
- Park, N., Park, S., Choi, D., Kim, H., and Kang, Y., Business Model of Renewable Energy Resource Energy Resource Map, Journal of the Korean Solar Energy Society, Vol. 36, No. 1, pp. 39-47, 2016. https://doi.org/10.7836/kses.2016.36.1.039
- Razan, J. I. , Islam, R. S., Hasan, R., Hasan, S., and Islam, F., A Comprehensive Study of Micro-Hydropower Plant and Its Potential in Bangladesh, ISRN Renewable Energy, 2012.10.5402/2012/635396.
- Singh, V. K., and Singal, S. K., Operation of Hydropower Plants-A Review, Renewable and Sustainable Energy Renviews, Vol. 69, pp. 610-619, 2017. https://doi.org/10.1016/j.rser.2016.11.169
- Manzano-Agualiaro, F., Taher, M., Zapata-Sierra, A., Juaidi, A., and Montoya,F. G., An Overview of Research and Energy Evolution for Small Hydropower in Europe, Renewable and Sustainable Energy Reviews, Vol. 75, pp. 476-486, 2017. https://doi.org/10.1016/j.rser.2016.11.013
- Adhau, S. P., Moharil, R. M., and Adhau, P. G., Mini-hydropower Generation on Existing Irrigation Projects: Case Study of Indian Sties, Renewable and Sustainable Eenrgy Reviews, Vol. 16, No. 7, pp. 4785-4795, 2012. https://doi.org/10.1016/j.rser.2012.03.066
- Larentis, D. G., Collischonn, W., Olivera, F., and Tucci, C. E. M., Gis-based Procedures for Hydropower Potential Spotting, Energy, Vol. 35, No. 10, pp. 4237-4243, 2010. https://doi.org/10.1016/j.energy.2010.07.014
- Yu., I. S., Kim, H. Y., and Jeong, S. M., Estimation of Annual Small Hydro-powerof Standard Basin in Korea, Journal of the Korean Society of Hazard Mitigation, Vol. 17, No. 6, pp. 473-481, 2017. https://doi.org/10.9798/KOSHAM.2017.17.6.473
- Park, W., and Lee, C., Analysis of Small Hydropower Resource Characteristics for Nakdong River System, Journal of Korean Solar Energy Society, Vol. 32, No. 6, pp. 68-75, 2012. https://doi.org/10.7836/kses.2012.32.6.068
- Park, W., and Lee, C., Analysis on D esign Parameters of Smal l Hydropower Sites with Rainfall Conditions, Journal of Korean Solar Energy Society, Vol. 32, No. 4, pp. 59-64, 2012. https://doi.org/10.7836/kses.2012.32.4.059
- Kim, K., Yi, C., Lee, J., and Shim, M., Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis, Journal of the Korea Water Resources Association, Vol. 2007, No. 10, pp. 3367-3370, 2007.
- Park, J., Park, C., Lee, W., and Kim, J., A Study on Analyzing Efficiency of Small Hydropower Plant, Proceeding of Korean Society of Civil engineering, pp. 1989-1992, 2010.
- Cho, T., Kim, and Y., Lee, K., Improving Low Flow Estimation for Ungauged Basins in Korea, Journal of the Korean Solar Energy Society, Vol. 36, No. 1, pp. 39-47, 2016. https://doi.org/10.7836/kses.2016.36.1.039
- Kim, G. H., Yi, C. S., Yeo, G. D., and Shim, M. P., Priority Decision of Small Hydropower Development using Spatial Multi-Criteria Decision Making, Journal of the Korea Water Resources Association, Vol. 42, No. 12, pp. 1029-1038, 2009. https://doi.org/10.3741/JKWRA.2009.42.12.1029
- Noyes, R., Small and Micro Hydro Electric Power Plants; Technology and Feasibility, Energy Technology Review No. 60, Noyes Data Corperation, U.S.A., 1980.
- Park, W., and Lee, C., The Effects of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condition, Journal of the Korean Solar Energy Society, Vol. 28, No. 1, pp. 43-49, 2008.
- Yi, C. S., Kim, G. H., Lee, J. H., and Shim, M. P., Location Analysis for Developing Small Hydropower Using Geo-Spatial Information System, Journal of the Korea Water Resources Association, Vol. 40, No. 12, pp. 985-994, 2007. https://doi.org/10.3741/JKWRA.2007.40.12.985
- Huh, C., Hydrological Survey Advancement Five-Year Plan, Journal of the Korea Water Resources Associationp. Vol. 38, No. 5, pp. 16-22, 2005.
- Roh, Y., Kim, C., and Cha, J., Hydrological Survey Advancement through Construction and Operation of Automatic Flow Measurement Facility, Journal of the Korea Water Resources Association, Vol. 41, No. 8, pp. 37-45, 2008.
- Ministry of Land, Transport and Maritime Affairs, Report on Establishment of Hydrological Basic Plan(2010-2019).
- International Renewable Energy Agency(IRENA), http://www.irena.org/
- Water Resources Management Information System, http://wamis.go.kr/eng/main.aspx#
- Korea Power Exchange, http://epsis.kpx.or.kr/epsisnew/
- Han River Flood Control Office, http://www.hrfco.go.kr/eng/eng_main.do
피인용 문헌
- 기초지방자치단체별 보급 가능한 재생에너지 시장잠재량을 이용한 에너지 자립률 평가 vol.39, pp.6, 2019, https://doi.org/10.7836/kses.2019.39.6.137