DOI QR코드

DOI QR Code

설계의 안전성 검토(DFS) 업무의 효율성 증대를 위한 공동주택 건설공사의 단위작업별 재해위험성 평가

Disaster Risk Assessment by Work Unit of Construction Work for Improve the Efficiency of Design for Safety Task

  • 투고 : 2018.01.08
  • 심사 : 2018.06.04
  • 발행 : 2018.06.30

초록

The construction work to establish a safety management plan should be carried out Design for Safety(DFS) task by the designers from May 2016 according to the amendment of the Construction Technology Promotion Act. However, designers lack experience in construction work and lack of information on safety accidents, so it is not easy to predict a disaster that may occur during the construction phase. Therefore, the purpose of this study is to provide information about disasters that can occur in each construction work in order to enable designers to efficiently perform DFS task in the design phase. In this study, the construction work was classified by work unit and the disaster risk assessment was conducted using the Failure Mode and Effect Analysis technique. The disaster information by work unit analyzed in this study can be used to provide designers with an alternative to prevent disasters at the design stage. Disaster information by work unit of apartment construction can be used by designers to prepare an alternative for disaster prevention at the design stage.

키워드

참고문헌

  1. Bang, J. D., Sohn, J. R., Cho, G. H., Kim, J. W., Noh, Y. Y., Lee, K. R., Kim, S. M., & KI, J. I. (2016). Improvement of Safety Management Guideline for Accident Prevention in LH Construction Site, Land & Housing Institute.
  2. Hong, S. H. (2004). The Development of a Construction Safety Management Information Model using the Concept of Design for Safety, Chung-Ang University.
  3. Joo, H. J. (2009). A study on the Analysis of Problems in the Architectural Design Competition by Means of the Analysis Method FMEA, Hanyang University.
  4. Kim, J. W., Cho, G. H., Song, S. H., Bang, J. D., & Sohn. J. R. (2016). Analysis of Unit-works for Design for Safety in Construction Work; Focus on Construction Project of OO Coporation, Land & Housing Institute Journal, 7(4), 315-322.
  5. Ko, S. S. (2007). A Study on Evaluation of Influence Factors about the Construction Delay Applying FMEA in Apartment Housing, Hanyang University.
  6. Kwon, O. M. (2015). Deduction of Accident Cause for Tower-crane using FMEA Method, Hanyang University.
  7. Lee, S. O. (2010). Analysis of Major Delay Factors in Finishing Works of Tall Buildings Based on FMEA, Sejong University.
  8. Lee, D. Y. (2015). Analysis of Delay Factors in Irregular-Shaped Tall Building Construction Project, Koera University.
  9. Ministry of Employment and Labor(2016). Analysis of Industrial Accidents in 2015.
  10. Ministry of Government Legislation(2015). Construction Technology Promotion Act, Act No.13324, May 18, 2015.
  11. Samelson, N. M., & Levitt. R. E. (1982). Owner's Guidelines for Selecting Safety Contra Journal of the Construction Division, American Society of Civil Engineers, 128(3), 417-423.
  12. Seo, J. P. (2012). Evaluation of Impact Assessment of the Cost Risk-Factor for the Design-Build Projects Based on FMEA, Soongsil University.
  13. Yu, J. H., Song, J. W., & Kim, C. D. (2008). Construction Safety Management using FMEA Technique for Selecting Priority Order, Korea Institute of Construction Engineering and Management, 9(6), 185-193.