Anchorage mechanism and pullout resistance of rock bolt in water-bearing rocks

  • Kim, Ho-Jong (Department of Civil Engineering, Konkuk University) ;
  • Kim, Kang-Hyun (Department of Civil Engineering, Konkuk University) ;
  • Kim, Hong-Moon (Department of Geotechnical & Tunnel Engineering, Pyunghwa Engineering) ;
  • Shin, Jong-Ho (Department of Civil Engineering, Konkuk University)
  • Received : 2017.05.20
  • Accepted : 2018.03.23
  • Published : 2018.06.30

Abstract

The purpose of a rock bolt is to improve the mechanical performance of a jointed-rock mass. The performance of a rock bolt is generally evaluated by conducting a field pullout test, as the analytical or numerical evaluation of the rock bolt behavior still remains difficult. In this study, wide range of field test was performed to investigate the pullout resistance of rock bolts considering influencing factors such as the rock type, water bearing conditions, rock bolt type and length. The test results showed that the fully grouted rock bolt (FGR) in water-bearing rocks can be inadequate to provide the required pullout resistance, meanwhile the inflated steel tube rock bolt (ISR) satisfied required pullout resistance, even immediately after installation in water-bearing conditions. The ISR was particularly effective when the water inflow into a drill hole is greater than 1.0 l/min. The effect of the rock bolt failure on the tunnel stability was investigated through numerical analysis. The results show that the contribution of the rock bolt to the overall stability of the tunnel was not significant. However, it is found that the rock bolt can effectively reinforce the jointed-rock mass and reduce the possibility of local collapses of rocks, thus the importance of the rock bolt should not be overlooked, regardless of the overall stability.

Keywords

Acknowledgement

Supported by : Konkuk University

References

  1. ASTM D4435-13e1. (2013), Standard Test Method for Rock Bolt Anchor Pull Test, ASTM International, West Conshohocken, Pennsylvania, U.S.A.
  2. Cai, Y., Esaki, T. and Jiang, Y. (2004), "An analytical model to predict axial load in grouted rock bolt for soft rock tunneling", Tunn. Undergr. Sp. Technol., 19(6), 607-618. https://doi.org/10.1016/j.tust.2004.02.129
  3. Carranza-Torres, C. and Fairhurst, C. (2000), "Application of the convergence-confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion", Tunn. Undergr. Sp. Technol., 15(2), 187-213. https://doi.org/10.1016/S0886-7798(00)00046-8
  4. Farmer, I.W. (1975), "Stress distribution along a resin grouted rock anchor", J. Rock Mech. Min. Sci. Geomech. Abstr., 12(11), 347-351. https://doi.org/10.1016/0148-9062(75)90168-0
  5. Huang, M., Xu, C.S., Zhan, J.W. and Wang, J.B. (2017), "Comparative study on dynamic properties of argillaceous siltstone and its grouting-reinforced body", Geomech. Eng., 13(2), 333-352. https://doi.org/10.12989/GAE.2017.13.2.333
  6. Hyett, A.J., Moosavi, M. and Bawden, W.F. (1996), "Load distribution along fully grouted bolts, with emphasis on cable bolt reinforcement", J. Numer. Anal. Meth. Geomech., 20(7), 517-544. https://doi.org/10.1002/(SICI)1096-9853(199607)20:7<517::AID-NAG833>3.0.CO;2-L
  7. Jalalifar, H. (2006), "A new approach in determining the load transfer mechanism in fully grouted bolts", Ph.D Dissertation, University of Wollongong, New South Wales, Australia.
  8. Jia, P. and Tang, C.A. (2008), "Numerical study on failure mechanism of tunnel in jointed rock mass", Tunn. Undergr. Sp. Technol., 23(5), 500-507. https://doi.org/10.1016/j.tust.2007.09.001
  9. Jiang, S.H., Li, D.Q., Zhang, L.M. and Zhou, C.B. (2014), "Time-dependent system reliability of anchored rock slopes considering rock bolt corrosion effect", Eng. Geol., 175, 1-8. https://doi.org/10.1016/j.enggeo.2014.03.011
  10. Khan, A.J., Mostofa, G. and Jadid, R. (2017), "Pullout resistance of concrete anchor block embedded in cohesionless soil", Geomech. Eng., 12(4), 675-688. https://doi.org/10.12989/gae.2017.12.4.675
  11. Kilic, A., Yasar, E. and Celik, A.G. (2002), "Effect of grout properties on the pull-out load capacity of fully grouted rock bolt", Tunn. Undergr. Sp. Technol., 17(4): 355-362. https://doi.org/10.1016/S0886-7798(02)00038-X
  12. Kristjansson, G. (2014), "Rock bolting and pull out test on rebar bolts," Master Dissertation, Institutt for Geologi og Bergteknikk, Trondheim, Norway.
  13. KTA. (2014a), A Study on the Rock Bolt Installation and its Effect on the Tunnel Stability in Water-Bearing Rock, Korean Tunnelling and Underground Space Association (KTA), Seoul, Korea.
  14. KTA. (2014b), A Study on Proper Rock Bolt Installation Method in the High Speed Railway Tunnel, Korean Tunnelling and Underground Space Association (KTA), Seoul, Korea.
  15. Li, C. and Hakansson, U. (1999), "Performance of the Swellex bolt in hard and soft rocks", Proceedings of the International Conference on Rock Support and Reinforcement Practice in Mining, Kalgoorlie, Australia, March
  16. Li, C. and Stillborg, B. (1999), "Analytical models for rock bolts", J. Rock Mech. Min. Sci., 36(8), 1013-1029. https://doi.org/10.1016/S1365-1609(99)00064-7
  17. Li, C.C. (2016), "Analysis of inflatable rock bolts", Rock Mech. Rock Eng., 49(1), 273-289. https://doi.org/10.1007/s00603-015-0735-9
  18. Li, Y., Luo, R., Zhang, Q., Xiao, G., Zhou, L. and Zhang, Y. (2017), "Model test and numerical simulation on the bearing mechanism of tunnel-type anchorage", Geomech. Eng., 12(1), 139-160. https://doi.org/10.12989/gae.2017.12.1.139
  19. Malhotra, V.M., and Carino, N.J. (2003), Handbook on Nondestructive Testing of Concrete Second Edition, CRC Press, Boca Raton, Florida, USA.
  20. Merifield, R.S. and Smith, C.C. (2010), "The ultimate uplift capacity of multi-plate strip anchors in undrained clay", Comput. Geotech., 37(4), 504-514. https://doi.org/10.1016/j.compgeo.2010.02.004
  21. Oreste, P. (1994), "Comportamento di bulloni passivi in galleria: Un nuovo modello di simulazione", Gallerie e Grandi Opere Sotterranee, 32-41.
  22. Oreste, P.P. (2003), "Analysis of structural interaction in tunnels using the covergence-confinement approach", Tunn. Undergr. Sp. Technol., 18(4), 347-363. https://doi.org/10.1016/S0886-7798(03)00004-X
  23. Osgoui, R.R. and Unal, E. (2009), "An empirical method for design of grouted bolts in rock tunnels based on the Geological Strength Index (GSI)", Eng. Geol., 107(3), 154-166. https://doi.org/10.1016/j.enggeo.2009.05.003
  24. Vu, K.A.T. and Stewart, M.G. (2000), "Structural reliability of concrete bridges including improved chloride-induced corrosion models", Struct. Saf., 22(4), 313-333. https://doi.org/10.1016/S0167-4730(00)00018-7
  25. Wijk, G. and Skogberg, B. (1982), "The inflatable rock bolting system", Proceedings of the 14th Canadian Rock Mechanics Symposium. Canadian Institute of Mining and Metallurgy, Vancouver, British Columbia, Canada, May.
  26. Zhang, C.C., Xu, Q., Zhu, H.H., Shi, B. and Yin, J.H. (2014), "Evaluations of load-deformation behavior of soil nail using hyperbolic pullout model", Geomech. Eng., 6(3), 277-292. https://doi.org/10.12989/gae.2014.6.3.277
  27. Zhu, C., Chang, X., Men, Y. and Luo, X. (2015), "Modeling of grout crack of rockbolt grouted system", J. Min. Sci. Tech., 25(1), 73-77. https://doi.org/10.1016/j.ijmst.2014.11.005