References
- Bowe, C. (2009), Dynamic Interaction of Trains and Railway Bridges Using Wheel Rail Contact Method, Ph.D. thesis, National University of Ireland Galway.
- Bolton, M.D. and Lau, C.K. (1988), "Scale effects arising from particle size", Proceedings of the International Conference on Geotechnical Centrifuge Modelling (Centrifuge88), 127-132.
- Choi, C.Y., Kim, H.K., Chung, K. Y. and Yang, S. B. (2015). "Train-Structure Dynamic Interaction Analysis of The Bridge Transition Considering Track Irregularity". Journal of the Korean Geotechnical Society, 31(9): 29-38. https://doi.org/10.7843/kgs.2015.31.9.29
- Choi, I.Y., Um, J.H., and Kim, M.C. (2013), "Analysis of the Influence of Track Alignment on Ride Comfort and Safety of KTX", Journal of The Korean Society for Railway, 16(2): 110-116. https://doi.org/10.7782/JKSR.2013.16.2.110
- Eum, K.Y., Kim, Y.H., and Kim, J.W. (2013), "Study on Dynamic Characteristics of Structure Approaches by Train Moving Loads", Journal of The Korean Society for Railway, 15(4): 298-304.
- Hou, Y. J., Xu, Z. P. and Liang, J. H. (2004) Centrifuge modeling of cutoff wall for CFRD built in deep overburden. Proc. of Int. Conf. of Hydropower, Yichan, China, pp.86-92.
- Kim. D.S, Ha. J.G, Lee. S. H, Choo. Y.W, Kim. S. H. (2012), "Simulation of Dynamic in-situ Soil Properties for the Centrifuge Test (Hualien Site in Taiwan)", Journal of the Earthquake Engineering Society of Korea, Vol.16 No.4 pp.27-36 https://doi.org/10.5000/EESK.2012.16.4.027
- Kim, D.S., Kim, N.R., Choo, Y.W., and Cho G.C. (2013), "Newly Developed State-of-the-Art Geotechnical Centrifuge in Korea", KSCE Journal of Civil Engineering, 17(1): 77-84. https://doi.org/10.1007/s12205-013-1350-5
- Paixao. A., Fortunato, E. and Calcada, R. (2014), "Transition Zones to Railway Bridges: Track Measurements and Numerical Modelling", Engineering Structures, 80(1): 435-443. https://doi.org/10.1016/j.engstruct.2014.09.024
- Shan, Y., Albers, B., and Savidi, S.A. (2013), "Influence of Different Transitions Zones on the Dynamic Response", Computers and Geotechnics, 48: 21-28. https://doi.org/10.1016/j.compgeo.2012.09.006
- UIC 719R (Ed. 3) (2008), Earthworks And Track Bed Construction For Railway Lines Describes earthworks and track beds for ballasted track, UIC code.
- Yoo, C.H, Choi, C.Y, Yang, S.H (2016), "Comparison of Construction Cost and External Stability of Railway Abutment wall with Friction Angle of Backfill Materials", Journal of the Korean Geosynthetics Society, Vol.5, No.3, 67-76.